Jump to main page content
Loading...

Project sheet

Name

Eficiência Energética em Edifícios da Administração Pública Central

Total project amount

868,21 thousand €

Amount paid

0 €

Non-refundable funding

868,21 thousand €

Loan funding

0 €

Start date

07.12.2021

Expected end date

31.12.2025

Dimension

Climate Transition

Component

Energy efficiency in buildings

Investment

Energy efficiency in central public administration buildings

Operation code

01/C13-i02/2021.P61

Summary

A presente candidatura é apresentada pela Universidade Nova de Lisboa (UNL), enquanto beneficiário final. O edifício abrangido pela candidatura encontra-se afeto à realização de atividades de Ensino Superior por parte Escola Nacional de Saúde Pública da Universidade Nova de Lisboa (ENSP). Através de uma auditoria de eficiência energética foram identificadas e propostas várias oportunidades de melhoria que permitirão incrementar o desempenho energético do edifício, reduzir fatura energética anual e melhorar a classificação energética, em pleno enquadramento com as tipologias de intervenção previstas no ponto 6 do Aviso e conforme se enumera: Substituição das lâmpadas atuais e/ou instalação de LED s para iluminação; Instalação de sistema solar fotovoltaico autónomo sem apoio; Aplicação de isolamento térmico sobre/sob a laje de esteira da cobertura; Aplicação de isolamento térmico nas Fachadas; Substituição da caixilharia existente por uma nova caixilharia e melhoria das características solares dos vidros; Instalação de sistema solar térmico para produção de AQS; Substituição do Sistema de Climatização e instalação de Sistema de Gestão Técnica Centralizada; e Ações Imateriais (certificados, auditorias, consultoria e divulgação). Com a implementação destas medidas de melhoria de eficiência energética, é expectável que o consumo de energia primária seja reduzido em 40,06%, passando no que se refere às fontes não renováveis de 419.786 KWh/ano para 251.621 KWh/ano. Adicionalmente, relativamente ao impacto na redução anual de emissões de gases com efeito de estufa é previsível a diminuição de 104,95 toneladas de CO2/ano para 62,91 toneladas de CO2/ano, correspondendo a uma diminuição de 42,04 toneladas de CO2/ano.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

3,1
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

868,21 thousand €

Total amount of the project

Where was the money spent

By county

1 county financed .

  • Lisboa 868,21 thousand € ,
Source AD&C, EMRP
16.05.2024