Name
Eficiência Energética em Edifícios da Administração Pública CentralTotal project amount
677,49 thousand €Amount paid
135,5 thousand €Non-refundable funding
677,49 thousand €Loan funding
0 €Start date
07.12.2021Expected end date
31.12.2025Dimension
Climate TransitionComponent
Energy efficiency in buildingsInvestment
Energy efficiency in central public administration buildingsOperation code
01/C13-i02/2021.P46Summary
O objetivo da operação aqui visada é alcançar a melhoria da eficiência energética do edifício da Residência de Estudantes de Elvas, através de um conjunto de investimentos em diferentes tipologias de intervenção. A Residência apresenta algumas lacunas a nível energético, o que se reflete num maior consumo de energia e consequentemente de emissões de CO2, conforme se comprova pelo certificado energético emitido, que revela que o edifício pertence à classe energética D, apresentando consumos na ordem dos 121.923 kWh/ano. Neste âmbito, revela-se importante intervir no sentido de reduzir o consumo de energia e aumentar o conforto térmico dentro do edifício, bem como reduzir a pegada carbónica associada. Assim, nesta operação estão previstos os seguintes investimentos: Instalações de AVAC - Climatização e aquecimento das águas sanitárias; Instalação de central fotovoltaica; Instalação de sistema solar térmico Instalação de sistema de gestão de energia para controlar os consumos; Substituição das lâmpadas atuais (do tipo fluorescente) por lâmpadas LED; Substituição de portas e janelas com caixilharia metálica ou em madeira por Janelas com caixilharia em PVC. Com este conjunto de investimentos pretende-se reduzir o consumo de energia primária em 162.734,5 kWhep/ano (71,6%) e uma redução anual de emissões de CO2 de 19,1 tCO2eq/ano (65,13%). Para além dos investimentos mencionados, o projeto contempla investimentos em ações imateriais, nomeadamente através auditorias energéticas e emissão de Certificado Energético ex-ante e ex-post, bem como através da realização de ações de consultoria em eficiência energética.
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
677,49 thousand €
Total amount of the project
Percentage of the amount already paid for implementing projects
, 20 %,Where was the money spent
By county
1 county financed .
-
Elvas 677,49 thousand € ,