Jump to main page content
Loading...

Project sheet

Name

Eficiência Energética em Edifícios da Administração Pública Central

Total project amount

975,12 thousand €

Amount paid

197,28 thousand €

Non-refundable funding

975,12 thousand €

Loan funding

0 €

Start date

07.12.2021

Expected end date

31.12.2025

Dimension

Climate Transition

Component

Energy efficiency in buildings

Investment

Energy efficiency in central public administration buildings

Operation code

01/C13-i02/2021.P26

Summary

A presente candidatura pretende intervencionar nos Edificios de Residências R1 e R2 do Instituto Politécnico de Coimbra ao nível da eficiência energética e hídrica e conforto térmico. Os objetivos propostos assentam na redução do consumo primário de energia, quer através da produção através da instalação de sistemas solar fotovoltaico, quer através da redução através de melhorias na envolvente exterior (coberturas e caixilharia) e substituição de bombas de calor e iluminação. As intervenções propostas para os "Edificios de Residências R1 e R2" baseiam-se na alteração de elementos construtivos que trarão grande benefício de eficiência energética, hídrica e conforto térmico. Com as medidas a implementar estima-se uma redução de Energia Primária de 598.046,10 kWhep/ano e uma Redução de Emissões de gases com efeito de estufa de 100,76 tCO2eq/ano e uma Redução anual do consumo de água nos edifícios públicos de 3.013 m3/ano

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

4,1
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

975,12 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 20,2 %,

Where was the money spent

By county

1 county financed .

  • Coimbra 975,12 thousand € ,
Source AD&C, EMRP
16.05.2024