Jump to main page content
Loading...

Project sheet

Name

Eficiência Energética em Edifícios da Administração Pública Central

Total project amount

655,03 thousand €

Amount paid

0 €

Non-refundable funding

655,03 thousand €

Loan funding

0 €

Start date

07.12.2021

Expected end date

31.12.2025

Dimension

Climate Transition

Component

Energy efficiency in buildings

Investment

Energy efficiency in central public administration buildings

Operation code

01/C13-i02/2021.P205

Summary

A presente operação consiste na adoção de um conjunto de medidas que visam a redução do consumo energético do edifício, por forma a que o Edifício da ESDRM se torne muito mais eficiente energeticamente. Estas medidas consistem: - na aplicação de isolamento térmico nas coberturas; - na substituição de sistema de AVAC; - na substituição completa das luminárias; - na instalação de um sistema fotovoltaico para produção de energia elétrica para autoconsumo. A implementação destas medidas resulta numa redução do consumo energético em cerca de 183.170 kWh/ano, a que corresponde uma poupança expectável de cerca de 28.959/ano. Estima-se uma redução do consumo de energia primária anual de 457.925 kWhEP, correspondente a uma redução anual de 44%.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

3,4
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

655,03 thousand €

Total amount of the project

Where was the money spent

By county

1 county financed .

  • Rio Maior 655,03 thousand € ,
Source AD&C, EMRP
16.05.2024