Eficiência Energética em Edifícios da Administração Pública Central
Project sheet
Name
Eficiência Energética em Edifícios da Administração Pública CentralTotal project amount
3,47 million €Amount paid
0 €Non-refundable funding
3,47 million €Loan funding
0 €Start date
07.12.2021Expected end date
31.12.2025Dimension
Climate TransitionComponent
Energy efficiency in buildingsInvestment
Energy efficiency in central public administration buildingsOperation code
01/C13-i02/2021.P146Summary
Propõe-se o Centro Hospitalar de Trás-os-Montes e Alto Douro E.P.E., reabilitar os sistemas energéticos da sua Unidade Hospital de Chaves, ao nível da climatização, iluminação interior e exterior, aquecimento de águas sanitárias. Estas medidas terão como linha principal de atuação a substituição de atuais sistemas menos eficientes por outros mais modernos e eficientes, bem como a melhoria da eficiência global dos sistemas e instalação de sistemas de energia renovável, quer ao nível da energia solar térmica bem como da energia fotovoltaica. Estas intervenções além das melhorias significativas ao nível do conforto dos Utentes e Colaboradores, permitirá uma substancial redução nos consumos de energia primária estimada em 41,72% (4.517.048,81kWhEP/ano), redução de emissão de CO2 estimada em 40,64% (636,85 tCO2 eq/ano), redução dos custos operacionais dos sistemas energéticos de climatização e melhoria da Classe Energética de C para B, parâmetros estes imprescindíveis para esta candidatura.
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
3,47 million €
Total amount of the project
Where was the money spent
By county
1 county financed .
-
Chaves 3,47 million € ,