PRR Project
Eficiência Energética em Edifícios da Administração Pública Central
Project sheet
Name
Eficiência Energética em Edifícios da Administração Pública CentralTotal project amount
308,94 thousand €Amount paid
0 €Non-refundable funding
308,94 thousand €Loan funding
0 €Start date
01.03.2022Expected end date
30.11.2025Dimension
Climate TransitionComponent
Energy efficiency in buildingsInvestment
Energy efficiency in central public administration buildingsOperation code
01/C13-i02/2021.P134Summary
A presente candidatura pretende intervencionar o Edifício da ESEC do Instituto Politécnico de Coimbra ao nível da eficiência energética e hídrica. O edifício caracteriza-se assim como um edifício com necessidade de aquecimento ambiente na estação fria e de arrefecimento na estação quente e um edifício semelhante à referência no que toca à iluminação aquecimento de águas quentes sanitárias. A substituição dos atuais materiais e tecnologias por outros mais eficientes resultará num edifício com melhor conforto, menores necessidades de energia e consequentemente com menor pegada carbónica, passando de uma classificação de eficiência energética de C para A. A candidatura apresenta uma redução estimada de energia primária de 430.874,5 kWhEP/ano (51,6 %) e uma redução das emissões de Gases com Efeito de Estufa (GEE) de 44,37 tCO2 eq/ano.
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
308,94 thousand €
Total amount of the project
Where was the money spent
By county
1 county financed .
-
Porto 308,94 thousand € ,