PRR Project
Eficiência Energética em Edifícios da Administração Pública Central
Project sheet
Name
Eficiência Energética em Edifícios da Administração Pública CentralTotal project amount
743,7 thousand €Amount paid
23,9 thousand €Non-refundable funding
743,7 thousand €Loan funding
0 €Start date
07.12.2021Expected end date
31.12.2025Dimension
Climate TransitionComponent
Energy efficiency in buildingsInvestment
Energy efficiency in central public administration buildingsOperation code
01/C13-i02/2021.P129Summary
O presente projeto visa a melhoria da eficiência energética do Museu do Côa, afeto à Côa Parque Fundação para a salvaguarda e valorização do Vale do Côa, por forma a contribuir para as metas da UE no que diz respeito a reabilitar e tornar os edifícios energeticamente mais eficientes. Esta intervenção tem como objetivos principais a melhoria dos níveis de conforto para os seus utilizadores e residentes, nomeadamente o térmico, a melhoria da qualidade do ar interior, o benefício para a saúde, a extensão da vida útil dos edifícios, o aumento da sua resiliência, a redução da fatura e da dependência energética do país, bem como a redução de emissões de gases com efeito de estufa (GEE). Assim, este projeto tem englobado diversas medidas, das quais se destacam a substituição de envidraçados exteriores por mais eficientes, substituição do sistema de Teto Radiante por ventiloconvectores de chão na zona de escritórios, substituição da caldeira existente por uma de condensação, implementação de um sistema de Gestão Técnica Centralizada (GTC), sistemas de iluminação, instalação de sistema solar fotovoltaico para produção de energia elétrica para autoconsumo, que vão potenciar uma redução anual do consumo de energia primária no Edifício em causa de 453.058,62 kWhEP/ano (55,3%), que equivale a uma diminuição anual estimada das emissões de gases com efeito de estufa de 50,03 tCO2eq/ano (46,16%). Através de um investimento elegível de 743.700,00, a classe energética do edifício passará de B para A.
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
743,7 thousand €
Total amount of the project
Percentage of the amount already paid for implementing projects
, 3,2 %,Where was the money spent
By county
1 county financed .
-
Vila Nova de Foz Côa 743,7 thousand € ,