Project sheet

Name

Eficiência Energética em Edifícios da Administração Pública Central

Total project amount

866,83 thousand €

Amount paid

0 €

Non-refundable funding

866,83 thousand €

Loan funding

0 €

Start date

07.12.2021

Expected end date

31.12.2025

Dimension

Climate Transition

Component

Energy efficiency in buildings

Investment

Energy efficiency in central public administration buildings

Operation code

01/C13-i02/2021.P111

Summary

A presente candidatura, apresentada pela Instituto Superior de Agronomia, tem como objetivo a intervenção no edifício BISA contemplando a implementação de medidas compatíveis com as tipologias de intervenção, de acordo com o previsto no ponto 6 do Aviso n.º 01/C13-i02/2021. Assim, e de forma sintética, enumeram-se abaixo as medidas que se pretendem submeter a apoio, no âmbito da presente candidatura e que se encontram devidamente identificados no Relatório de Auditoria Energética e de Eficiência Hídrica do edifício (em anexo à presente candidatura): MM1: Alteração do sistema de climatização (AVAC) existente; MM2: Instalação de um Sistema Fotovoltaico para Autoconsumo; MM3: Sistema de controlo, comando e GTC; MM4: Instalação de um sistema de monitorização e gestão remota dos consumos de água do edifício; MM5: Otimização dos dispositivos de água (As soluções consideradas são devidamente certificadas com classificação A ou superior de acordo com a ANQIP). Estão ainda abrangidas pela presente operação, as seguintes medidas, integradas na tipologia de intervenção 5: MM6: Auditoria energética e emissão de Certificado Energético (CE) ex-ante no âmbito do SCE; MM7: Auditoria energética e emissão de Certificado Energético (CE) ex-post no âmbito do SCE; MM8: Plano de comunicação e de sensibilização aos utilizadores do edifício. A candidatura apresenta uma redução estimada de energia primária de 318.007,50 kWhEP/ano (56,3 %) e uma redução das emissões de Gases com Efeito de Estufa (GEE) de 31,80 tCO2eq/ano.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

3,7
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

866,83 thousand €

Total amount of the project

Where was the money spent

By county

1 county financed .

  • Lisboa 866,83 thousand € ,
Source AD&C, EMRP
16.05.2024