Jump to main page content
Loading...

Project sheet

Name

Otimização da Adução do Sistema Adutor Machico Funchal – EE de Santa Quitéria

Total project amount

3 million €

Amount paid

438,76 thousand €

Non-refundable funding

3 million €

Loan funding

0 €

Start date

01.02.2020

Expected end date

30.12.2025

Dimension

Resilience

Component

Water management

Investment

Water efficiency and reinforcement plan for RAM's supply and irrigation systems

Operation code

01/C09-i03-RAM/2022.PC09-i03-RAM-m04

Summary

O projeto tem por principal objetivo reforçar os caudais do Sistema adutor Machico- Funchal até 1000 m3/h. O sistema adutor Machico-Funchal integra um conjunto de infraestruturas de captação, tratamento e transporte de água que, no seu conjunto, garantem o abastecimento dos principais reservatórios municipais dos concelhos do Funchal, Santa Cruz e Machico, onde se encontra mais de 65% da população da RAM. A principal origem é o Sistema Aproveitamento dos Tornos (600 l/s a 1000 l/s), que permitem o desvio de caudais nas linhas de água atravessadas a Norte para o abastecimento público e regadio. Este sistema é complementado com um conjunto de furos de captação na costa Sul, mas que se encontram severamente pressionados pelas condições de abastecimento. Com as obras executadas de reforço de adução ao Canal do Norte, é possível interligar os sistemas de abastecimento aduzidos pelos Canais do Norte e dos Tornos e, através da ETA de Santa Quitéria, proceder ao reforço dos caudais ao Sistema adutor Machico- Funchal, aliviando a pressão nos furos de captação. Assim, prevê-se a execução de um sistema elevatório que inclui uma Estação Elevatória, conduta elevatória com cerca de 1500m e a construção de um reservatório com capacidade estimada de 4000m3.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

Not applicable
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

3 million €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 14,6 %,

Where was the money spent

By county

1 county financed .

  • Funchal 3 million € ,
Source AD&C, EMRP