PRR Project
Recuperação do Lanço Norte do Canal do Norte
Project sheet
Name
Recuperação do Lanço Norte do Canal do NorteTotal project amount
7 million €Amount paid
915,43 thousand €Non-refundable funding
7 million €Loan funding
0 €Start date
01.02.2020Expected end date
30.12.2025Dimension
ResilienceComponent
Water managementInvestment
Water efficiency and reinforcement plan for RAM's supply and irrigation systemsOperation code
01/C09-i03-RAM/2022.PC09-i03-RAM-m02Summary
O projeto em causa tem por objeto a recuperação do canal e os túneis existentes, reduzindo, desta forma, as elevadas perdas de água atualmente existentes. Os principias objetivos do projeto correspondem à melhoria da eficiência operacional do canal, o aumento da disponibilidade hídrica, da fiabilidade e segurança da infraestrutura, promovendo, assim, uma gestão da água mais eficiente e a adaptação às “mudanças climáticas”. A Levada do Norte é uma das maiores e mais importantes levadas da ilha da Madeira. Tem uma extensão total aproximada de 61km, e foi construída entre 1947 e 1952 pela antiga Comissão Administrativa dos Aproveitamentos Hidráulicos da Madeira com o objetivo de transportar água para rega, desde o norte da ilha até ao sul, nomeadamente até aos concelhos da Ribeira Brava e de Câmara de Lobos, irrigando as freguesias da Ribeira Brava, Campanário, Quinta Grande, Estreito e Câmara de Lobos, no sentido Oeste - Leste. A Levada do Norte está dividida em dois lanços principais: o lanço Norte, à cota 1000, com cerca de 15 km de extensão, dos quais 8 km em céu aberto e 7 km em túnel e o lanço Sul, à cota 600, com uma extensão aproximada de 35 km, sendo a Central Hidroelétrica da Serra de Água o local de separação dos referidos troços. O Lanço Norte encontra-se sob a gestão da Empresa de Eletricidade da Madeira (EEM), enquanto o Lanço Sul se encontra sob a gestão da ARM.
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
7 million €
Total amount of the project
Percentage of the amount already paid for implementing projects
, 13,1 %,Where was the money spent
By county
1 county financed .
-
São Vicente 7 million € ,