Jump to main page content
Loading...

Project sheet

Name

Rua da Cancela e Rua Alexandre Herculano

Total project amount

37,71 thousand €

Amount paid

0 €

Non-refundable funding

37,71 thousand €

Loan funding

0 €

Start date

01.01.2021

Expected end date

31.12.2025

Dimension

Resilience

Component

Social Intervention

Investment

360° Accessibility

Operation code

01/C03-i02/2021.P837

Summary

As ações já concretizadas e as demais a concretizar seguem os princípios orientadores explanados no Decreto-Lei 163/2006, de 8 de agosto, e nas suas Normas Técnicas de Acessibilidade (NTA), com variadas soluções, desde intervenções pontuais (muitas delas já realizadas) a intervenções profundas de cariz transformativo do desenho dos arruamentos e das características das vias, a saber: - Reperfilamento de arruamentos, alterações dos sentidos de tráfego e novos desenhos viários, por forma a privilegiar as deslocações pedonais; - Introdução de modalidade partilhada recorrendo ao nivelamento dos passeios com a via e sinalização; - Introdução de novos limites máximos de velocidade; - Introdução de medidas de acalmia de tráfego; - Ordenamento do estacionamento, libertando uma área maior destinada a privilegiar os modos suaves de transporte; - Construção de passeios onde eram inexistentes; - Alargamento de passeios por forma a, sempre que possível, possuírem uma largura livre não inferior a 1,5m; - Relocalização de barreiras que condicionavam a largura livre dos passeios; - Substituição dos materiais de revestimento; - Criação de novas passagens de peões, onde eram inexistentes; - Rebaixamento dos passeios nas passagens de peões, com as inclinações de acordo com as NTA; - Introdução de pavimentos podotáteis nas aproximações às passagens de peões, em concordância com as NTA; - Construção de separadores centrais nas passagens de peões, quando justificável; - Criação de lugares de estacionamento para pessoas com mobilidade condicionada, seguindo as NTA;

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

55,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

37,71 thousand €

Total amount of the project

Where was the money spent

By county

1 county financed .

  • Valongo 37,71 thousand € ,
Source AD&C, EMRP
17.05.2024