Project sheet

Name

Acessibilidade nas Centralidades - Rua Estação Velha à Rua de Madrid

Total project amount

14,84 thousand €

Amount paid

4,45 thousand €

Non-refundable funding

14,84 thousand €

Loan funding

0 €

Start date

01.01.2021

Expected end date

31.12.2025

Dimension

Resilience

Component

Social Intervention

Investment

360° Accessibility

Operation code

01/C03-i02/2021.P596

Summary

A edificação da estrutura será em quatro lanços (rampas), cada uma com sensivelmente 10m de comprimento e sem nunca ultrapassar uma inclinação de 6%, em conformidade com que está estipulado na alínea 1) do 2.5.1 secção 2.5 rampas do Dec. Lei n.º 163/2006 de 8 de Agosto. Em cada momento de paragem/patamar será criado uma pequena zona de lazer/descanso permitindo que seja muito mais do que um mero local de passagem. Estes momentos vão ao encontro igualmente do que está estabelecido em sede da alínea 2.5.5 que referem que as zonas de descanso deverão ter um comprimento nunca inferior a 1.50m. A envolvente ajardinada que compõe o local e a inclusão no meio do quarteirão proporciona ao local ser um momento de claro sossego. Uma das laterais do percurso terá um muro de suporte que ficará a cerca de 50cm do muro existente que na sua base se apresenta bastante irregular com uma base de pedra solta que se pretende salvaguardar para evitar quaisquer danos. Os postes de iluminação serão localizados em plataformas próprias e localizam-se junto aos muros de vedação/limites dos terrenos privados ou da rampa a edificar, ficando por isso fora do referido canal de circulação. A norte da proposta para a rampa, terá igualmente uma intervenção ao nível das passadeiras para peões existentes com o rebaixe da mesma e a colocação de pavimentos tácteis. Estes serão na sua totalidade, nesta primeira fase da intervenção, para 7 passagens de peões onde está previsto a aplicação de um Pavimento direcional e de um Pavimento de perigo conforme o anexo A e anexo B da Norma Portuguesa 4564 de 2019 que define os critérios para a aplicação de pavimentos táteis em espaço público exterior.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

75,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

14,84 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 30 %,

Where was the money spent

By county

1 county financed .

  • Matosinhos 14,84 thousand € ,