Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Programa de Modernização Tecnólogica do SNS

Total project amount

1,09 million €

Amount paid

0 €

Non-refundable funding

1,09 million €

Loan funding

0 €

Start date

31.10.2024

Expected end date

30.06.2026

Dimension

Resilience

Component

National Health Service

Investment

National Health Service Technological Modernization Programme

Operation code

01/C01-i10/2024.P8828

Summary

A ULSAM dispõe atualmente de 3 equipamentos de tomografia computorizada (TC), 2 sediados no HSLVC e 1 no HCB, respondendo a pedidos de realização de exames, provenientes das urgências, internamentos e consultas externas.O equipamento localizado no HCB apoia em proximidade os habitantes dos municípios de Arcos de Valdevez, Ponte da Barca e Ponte de Lima, num total estimado em 72 782 habitantes (INE, 2024), tendo realizado em 2023, em média, por dia, cerca de 38 exames (Siima).Os 2 equipamentos sediados no HSLVC realizaram em 2023, em média, por dia, cerca de 135 exames (Siima). Neste ritmo diário acelerado, o equipamento mais antigo (Philips Brilliance 16 cortes) demonstra dificuldade em acompanhar esta volumetria de trabalho. Trata-se de um equipamento adquirido em 2014, estando a laborar praticamente há 10 anos.De salientar que este equipamento esteve inoperacional, durante o ano de 2023 e de forma cumulativa 10 dias.O presente aviso enquadra-se na intenção de reforço do parque tecnológico da ULSAM, através do investimento na aquisição de um equipamento de TC com apoio de radiologia de intervenção, contribuindo assim para a melhoria quer do acesso, quer da qualidade dos serviços prestados aos utentes. A introdução de inovação tecnológica com esta aquisição tem como objetivo aumentar a rapidez e a qualidade dos exames realizados, apoiando o diagnóstico precoce da doença, e, dessa forma, contribuindo para o aumento do sucesso do tratamento. Além disso, aumentará a capacidade de resposta do SNS e a promoção de ganhos em saúde devido à maior eficiência alcançada, permitindo a diminuição dos exames em lista de espera. Por último é muito importante destacar que os novos equipamentos apresentam tecnologia mais avançada, tornando-os mais seguros devido à redução das substâncias de contraste utilizadas e aos menores níveis de radiação emitidos, melhorando as condições de segurança quer para os utentes, quer para os profissionais de saúde.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

5,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

1,09 million €

Total amount of the project

Where was the money spent

By county

1 county financed .

  • Viana do Castelo 1,09 million € ,
Source EMRP
10.02.2026
All themes
Transparency without leading