Barometer
Find out in detail the main strategic areas and mechanisms to respond to the most pressing needs of a post-pandemic Portugal.
An immediate response
The pandemic caused by the SARS-CoV-2 virus had worldwide repercussions, inevitably impacting all Member States and consequently the daily lives of all citizens, resulting in severe economic and social consequences.
The urgency to recover from a pandemic crisis and the need to ensure a sustainable future led Europe to quickly create an unprecedented recovery instrument, the Next Generation EU, which includes, among others, the REACT-EU mechanisms and the strengthening of Rural Development. Both programs provided a quick response to society's most pressing needs.
750
billion € available
to all Member States
2,1
billion € assigned to
Portugal through REACT-EU
353,5
Million € assigned to
Portugal to boost
Rural Development
Immediate support programs
Immediate action mechanisms, made available to promptly respond to the challenges and needs of society in a pandemic context.
REACT-EU
Program that promotes recovery from the pandemic crisis, as well as investments that contribute to preparing a climate, digital and resilient recovery of the economy.
Rural Development
Additional reinforcements to effect structural changes and assist the social, environmental and economic sustainability of rural areas.
Support programmes in one minute
REACT-EU
Percentage of the approved amount to be invested in implementing projects This indicator is known as the commitment rate. To make sure that the available funds are fully spent, higher figures than those available can be authorised, thereby preventing projects from using all of the money allocated to them.
, 104,4 %,Percentage of the executed amount compared to the planned This indicator is known as the realization rate.
, 96,7 %,Percentage of the amount executed compared to the planned amount This indicator is known as the execution rate.
, 100,9 %,REACT-EU
| Amount | |
|---|---|
| Total amount | 2138770000 € 2 138 770 000,00 € |
| Approved amount | 2233173392,27 € 2 233 173 392,27 € |
| Executed amount | 2158863312 € 2 158 863 312,00 € |
| Percentage of the approved amount to be invested in implementing projects | 104,41 % 104,41 % |
| Percentage of the amount executed compared to the planned amount | 100,94 % 100,94 % |
| Percentage of the executed amount compared to the planned | 96,67 % 96,67 % |
REACT-EU
Total amount
2138770000 €2 138 770 000,00 €
Approved amount
2233173392,27 €2 233 173 392,27 €
Executed amount
2158863312 €
2 158 863 312,00 €
Percentage of the approved amount to be invested in implementing projects
104,41 %
104,41 %
Percentage of the amount executed compared to the planned amount
100,94 %
100,94 %
Percentage of the executed amount compared to the planned
96,67 %
96,67 %
Rural Development
Percentage of the approved amount to be invested in implementing projects This indicator is known as the commitment rate. To make sure that the available funds are fully spent, higher figures than those available can be authorised, thereby preventing projects from using all of the money allocated to them.
, 101,6 %,Percentage of the executed amount compared to the planned This indicator is known as the realization rate.
, 79,7 %,Percentage of the amount executed compared to the planned amount This indicator is known as the execution rate.
, 81 %,Rural Development
| Amount | |
|---|---|
| Total amount | 353547000 € 353 547 000,00 € |
| Approved amount | 359150838,13 € 359 150 838,13 € |
| Executed amount | 286258311 € 286 258 311,00 € |
| Percentage of the approved amount to be invested in implementing projects | 101,59 % 101,59 % |
| Percentage of the amount executed compared to the planned amount | 80,97 % 80,97 % |
| Percentage of the executed amount compared to the planned | 79,7 % 79,70 % |
Rural Development
Total amount
353547000 €353 547 000,00 €
Approved amount
359150838,13 €359 150 838,13 €
Executed amount
286258311 €
286 258 311,00 €
Percentage of the approved amount to be invested in implementing projects
101,59 %
101,59 %
Percentage of the amount executed compared to the planned amount
80,97 %
80,97 %
Percentage of the executed amount compared to the planned
79,7 %
79,70 %
Investments by area
REACT-EU – Investment breakdown by area
REACT-EU – Investment breakdown by area
| Investment area | Approved amount | Executed amount | Percentage of investment |
|---|---|---|---|
| Business survival | 1271190183,97€ 1 271 190 183,97 € | 1270917141,69€ 1 270 917 141,69 € | 56,92 % 56,92 % |
| ️Learning recovery and other social measures | 284443117,72€ 284 443 117,72 € | 220950728,19€ 220 950 728,19 € | 12,74 % 12,74 % |
| Maintaining and creating jobs | 266801749,49€ 266 801 749,49 € | 263984060,61€ 263 984 060,61 € | 11,95 % 11,95 % |
| Health including Vaccines | 249486215,75€ 249 486 215,75 € | 249486215,75€ 249 486 215,75 € | 11,17 % 11,17 % |
| Climate transition and the environment | 130814647,36€ 130 814 647,36 € | 130121304,42€ 130 121 304,42 € | 5,86 % 5,86 % |
| Health | 18437477,98€ 18 437 477,98 € | 18437477,98€ 18 437 477,98 € | 0,83 % 0,83 % |
| ️Refugees from Ukraine | 12000000,00€ 12 000 000,00 € | 4966383,92€ 4 966 383,92 € | 0,54 % 0,54 % |
REACT-EU – Investment breakdown by area
Investment area
Business survival
Approved amount
1271190183,97 €
1 271 190 183,97 €
Executed amount
1270917141,69 €
1 270 917 141,69 €
Percentage of investment
56,92 %
56,92 %
Investment area
️Learning recovery and other social measures
Approved amount
284443117,72 €
284 443 117,72 €
Executed amount
220950728,19 €
220 950 728,19 €
Percentage of investment
12,74 %
12,74 %
Investment area
Maintaining and creating jobs
Approved amount
266801749,49 €
266 801 749,49 €
Executed amount
263984060,61 €
263 984 060,61 €
Percentage of investment
11,95 %
11,95 %
Investment area
Health including Vaccines
Approved amount
249486215,75 €
249 486 215,75 €
Executed amount
249486215,75 €
249 486 215,75 €
Percentage of investment
11,17 %
11,17 %
Investment area
Climate transition and the environment
Approved amount
130814647,36 €
130 814 647,36 €
Executed amount
130121304,42 €
130 121 304,42 €
Percentage of investment
5,86 %
5,86 %
Investment area
Health
Approved amount
18437477,98 €
18 437 477,98 €
Executed amount
18437477,98 €
18 437 477,98 €
Percentage of investment
0,83 %
0,83 %
Investment area
️Refugees from Ukraine
Approved amount
12000000 €
12 000 000,00 €
Executed amount
4966383,92 €
4 966 383,92 €
Percentage of investment
0,54 %
0,54 %
Rural Development – Investment breakdown by area
Rural Development – Investment breakdown by area
| Investment area | Approved amount | Executed amount | Percentage of investment |
|---|---|---|---|
| Viability of agricultural holdings and competitiveness | 178037967,16€ 178 037 967,16 € | 122260053,26€ 122 260 053,26 € | 49,57 % 49,57 % |
| Ecosystems dependent on agriculture and forests | 161730856,06€ 161 730 856,06 € | 156021464,72€ 156 021 464,72 € | 45,03 % 45,03 % |
| Agricultural market and sustainability | 10137545,03€ 10 137 545,03 € | 3256343,39€ 3 256 343,39 € | 2,82 % 2,82 % |
| Efficient use of resources and low carbon economy | 9210904,33€ 9 210 904,33 € | 4720449,62€ 4 720 449,62 € | 2,56 % 2,56 % |
| Social Inclusion and Employment | 33565,55€ 33 565,55 € | 0,00€ 0,00 € | 0,01 % 0,01 % |
Rural Development – Investment breakdown by area
Investment area
Viability of agricultural holdings and competitiveness
Approved amount
178037967,16 €
178 037 967,16 €
Executed amount
122260053,26 €
122 260 053,26 €
Percentage of investment
49,57 %
49,57 %
Investment area
Ecosystems dependent on agriculture and forests
Approved amount
161730856,06 €
161 730 856,06 €
Executed amount
156021464,72 €
156 021 464,72 €
Percentage of investment
45,03 %
45,03 %
Investment area
Agricultural market and sustainability
Approved amount
10137545,03 €
10 137 545,03 €
Executed amount
3256343,39 €
3 256 343,39 €
Percentage of investment
2,82 %
2,82 %
Investment area
Efficient use of resources and low carbon economy
Approved amount
9210904,33 €
9 210 904,33 €
Executed amount
4720449,62 €
4 720 449,62 €
Percentage of investment
2,56 %
2,56 %
Investment area
Social Inclusion and Employment
Approved amount
33565,55 €
33 565,55 €
Executed amount
0 €
0,00 €
Percentage of investment
0,01 %
0,01 %
Investments by regions
REACT-EU – Investment breakdown by region
REACT-EU – Investment breakdown by region
| Region | Sub-region | Municipality | Approved amount | Executed amount | Percentage of investment |
|---|---|---|---|---|---|
| North |
Alto Minho
Cávado
Ave
Área Metropolitana do Porto
Alto Tâmega
Tâmega e Sousa
Douro
Terras de Trás-os-Montes
|
Arcos de Valdevez
Caminha
Melgaço
Monção
Paredes de Coura
Ponte da Barca
Ponte de Lima
Valença
Viana do Castelo
Vila Nova de Cerveira
Total
Amares
Barcelos
Braga
Esposende
Terras de Bouro
Vila Verde
Total
Cabeceiras de Basto
Fafe
Guimarães
Mondim de Basto
Póvoa de Lanhoso
Vieira do Minho
Vila Nova de Famalicão
Vizela
Total
Arouca
Espinho
Gondomar
Maia
Matosinhos
Oliveira de Azeméis
Paredes
Porto
Póvoa de Varzim
Santa Maria da Feira
Santo Tirso
São João da Madeira
Trofa
Vale de Cambra
Valongo
Vila do Conde
Vila Nova de Gaia
Total
Boticas
Chaves
Montalegre
Ribeira de Pena
Valpaços
Vila Pouca de Aguiar
Total
Amarante
Baião
Castelo de Paiva
Celorico de Basto
Cinfães
Felgueiras
Lousada
Marco de Canaveses
Paços de Ferreira
Penafiel
Resende
Total
Alijó
Armamar
Carrazeda de Ansiães
Freixo de Espada à Cinta
Lamego
Mesão Frio
Moimenta da Beira
Murça
Penedono
Peso da Régua
Sabrosa
Santa Marta de Penaguião
São João da Pesqueira
Sernancelhe
Tabuaço
Tarouca
Torre de Moncorvo
Vila Nova de Foz Côa
Vila Real
Total
Alfândega da Fé
Bragança
Macedo de Cavaleiros
Miranda do Douro
Mirandela
Mogadouro
Vila Flor
Vimioso
Vinhais
Total
|
4 261 976,30 €
2 341 109,47 €
670 593,66 €
1 899 725,68 €
2 208 469,51 €
909 345,59 €
4 780 810,24 €
3 460 108,74 €
14 988 663,69 €
1 975 979,50 €
37 496 782,39 €
1 411 930,94 €
20 975 859,63 €
39 918 784,77 €
5 573 259,23 €
1 157 611,35 €
8 205 174,23 €
77 242 620,14 €
1 332 110,20 €
8 276 653,49 €
26 585 659,88 €
1 579 135,65 €
1 587 521,55 €
1 106 256,74 €
20 258 252,25 €
3 513 418,29 €
64 239 008,04 €
3 170 433,91 €
4 001 781,16 €
15 651 911,01 €
21 829 284,64 €
31 527 946,42 €
6 596 974,67 €
11 004 137,55 €
111 567 018,95 €
12 231 260,54 €
14 455 495,14 €
13 574 770,98 €
4 886 312,49 €
7 497 726,70 €
1 889 475,26 €
8 997 147,69 €
12 800 217,66 €
43 137 843,90 €
324 819 738,67 €
2 395 243,06 €
5 058 026,22 €
3 043 969,84 €
676 203,98 €
1 257 007,24 €
2 256 984,95 €
14 687 435,30 €
9 215 621,44 €
2 904 945,63 €
748 929,25 €
2 612 975,41 €
2 793 481,02 €
8 558 181,49 €
4 019 506,35 €
5 491 840,86 €
9 118 885,40 €
8 458 317,07 €
514 068,00 €
54 436 751,91 €
1 734 632,59 €
537 285,51 €
434 662,17 €
161 793,06 €
2 556 197,93 €
239 497,79 €
1 021 355,66 €
874 551,13 €
120 981,96 €
1 632 297,06 €
498 437,00 €
257 586,71 €
406 091,46 €
297 872,86 €
226 160,32 €
303 074,46 €
871 047,21 €
521 092,58 €
8 790 483,68 €
21 485 101,17 €
1 270 379,37 €
6 507 230,44 €
1 502 682,50 €
2 294 219,02 €
1 752 180,05 €
1 120 418,62 €
839 546,33 €
775 968,33 €
403 404,53 €
16 466 029,19 €
|
4 142 439,55 €
2 251 456,91 €
628 755,80 €
1 810 073,12 €
2 160 654,81 €
843 600,37 €
4 493 922,03 €
3 376 433,01 €
14 391 840,31 €
1 928 164,80 €
36 027 340,70 €
1 298 371,02 €
20 268 042,21 €
38 665 953,45 €
5 331 911,75 €
1 115 773,48 €
7 909 845,71 €
74 589 897,61 €
1 230 503,96 €
7 989 765,28 €
25 661 918,31 €
1 531 320,94 €
1 450 054,28 €
1 034 534,69 €
19 472 735,94 €
3 352 043,67 €
61 722 877,06 €
3 110 665,53 €
3 744 777,14 €
14 870 184,65 €
21 013 694,64 €
30 570 720,20 €
6 193 494,58 €
10 485 771,06 €
106 699 681,02 €
11 766 875,09 €
13 768 829,70 €
13 165 882,54 €
4 638 798,67 €
7 284 936,92 €
1 746 031,15 €
8 444 246,65 €
12 300 350,17 €
41 578 853,64 €
311 383 793,35 €
2 377 312,54 €
4 830 906,38 €
2 990 178,30 €
634 366,12 €
1 185 285,19 €
2 191 239,74 €
14 209 288,28 €
8 962 130,78 €
2 791 385,71 €
623 415,66 €
2 499 415,49 €
2 661 990,59 €
8 149 103,55 €
3 684 803,43 €
5 105 722,79 €
8 732 577,83 €
7 977 138,09 €
442 345,95 €
51 630 029,86 €
1 662 910,54 €
507 401,32 €
404 777,98 €
143 862,55 €
2 406 776,98 €
209 613,60 €
949 633,61 €
838 690,11 €
103 051,45 €
1 512 760,31 €
462 575,98 €
227 702,52 €
314 243,60 €
273 965,51 €
196 276,13 €
255 259,76 €
835 186,19 €
485 231,56 €
8 463 565,49 €
20 253 485,18 €
1 246 472,02 €
6 289 032,32 €
1 424 983,61 €
2 246 404,32 €
1 620 689,62 €
1 078 580,76 €
803 685,30 €
758 037,82 €
367 543,50 €
15 835 429,26 €
|
11,37 %
6,24 %
1,79 %
5,07 %
5,89 %
2,43 %
12,75 %
9,23 %
39,97 %
5,27 %
1,83 %
27,16 %
51,68 %
7,22 %
1,50 %
10,62 %
2,07 %
12,88 %
41,39 %
2,46 %
2,47 %
1,72 %
31,54 %
5,47 %
0,98 %
1,23 %
4,82 %
6,72 %
9,71 %
2,03 %
3,39 %
34,35 %
3,77 %
4,45 %
4,18 %
1,50 %
2,31 %
0,58 %
2,77 %
3,94 %
13,28 %
16,31 %
34,44 %
20,72 %
4,60 %
8,56 %
15,37 %
16,93 %
5,34 %
1,38 %
4,80 %
5,13 %
15,72 %
7,38 %
10,09 %
16,75 %
15,54 %
0,94 %
8,07 %
2,50 %
2,02 %
0,75 %
11,90 %
1,11 %
4,75 %
4,07 %
0,56 %
7,60 %
2,32 %
1,20 %
1,89 %
1,39 %
1,05 %
1,41 %
4,05 %
2,43 %
40,91 %
7,72 %
39,52 %
9,13 %
13,93 %
10,64 %
6,80 %
5,10 %
4,71 %
2,45 %
|
| Center |
Oeste
Região de Aveiro
Região de Coimbra
Região de Leiria
Viseu Dão Lafões
Beira Baixa
Médio Tejo
Beiras e Serra da Estrela
|
Alcobaça
Alenquer
Arruda dos Vinhos
Bombarral
Cadaval
Caldas da Rainha
Lourinhã
Nazaré
Óbidos
Peniche
Sobral de Monte Agraço
Torres Vedras
Total
Águeda
Albergaria-a-Velha
Anadia
Aveiro
Estarreja
Ílhavo
Murtosa
Oliveira do Bairro
Ovar
Sever do Vouga
Vagos
Total
Arganil
Cantanhede
Coimbra
Condeixa-a-Nova
Figueira da Foz
Góis
Lousã
Mealhada
Mira
Miranda do Corvo
Montemor-o-Velho
Mortágua
Oliveira do Hospital
Pampilhosa da Serra
Penacova
Penela
Soure
Tábua
Vila Nova de Poiares
Total
Alvaiázere
Ansião
Batalha
Castanheira de Pêra
Figueiró dos Vinhos
Leiria
Marinha Grande
Pedrógão Grande
Pombal
Porto de Mós
Total
Aguiar da Beira
Carregal do Sal
Castro Daire
Mangualde
Nelas
Oliveira de Frades
Penalva do Castelo
Santa Comba Dão
São Pedro do Sul
Sátão
Tondela
Vila Nova de Paiva
Viseu
Vouzela
Total
Castelo Branco
Idanha-a-Nova
Oleiros
Penamacor
Proença-a-Nova
Vila Velha de Ródão
Total
Abrantes
Alcanena
Constância
Entroncamento
Ferreira do Zêzere
Mação
Ourém
Sardoal
Sertã
Tomar
Torres Novas
Vila de Rei
Vila Nova da Barquinha
Total
Almeida
Belmonte
Celorico da Beira
Covilhã
Figueira de Castelo Rodrigo
Fornos de Algodres
Fundão
Gouveia
Guarda
Manteigas
Mêda
Pinhel
Sabugal
Seia
Trancoso
Total
|
12 442 760,21 €
2 814 547,98 €
1 034 704,16 €
996 155,05 €
861 757,87 €
8 337 001,28 €
1 939 397,35 €
3 022 533,09 €
2 620 386,03 €
3 873 983,35 €
1 259 035,94 €
9 487 366,19 €
48 689 628,49 €
7 391 179,37 €
4 124 509,35 €
3 903 187,67 €
19 656 409,19 €
2 232 895,20 €
7 178 164,37 €
579 069,26 €
3 071 410,94 €
6 859 140,09 €
9 298 789,59 €
2 973 923,51 €
67 268 678,53 €
1 669 118,33 €
5 026 194,67 €
29 680 145,14 €
1 252 212,55 €
12 285 084,09 €
465 414,37 €
2 733 949,83 €
3 551 225,73 €
1 216 389,73 €
883 849,01 €
1 265 045,55 €
1 323 280,30 €
3 199 498,27 €
204 380,17 €
736 325,44 €
1 132 793,78 €
749 466,91 €
1 511 284,71 €
548 772,92 €
69 434 431,50 €
566 358,97 €
1 006 531,87 €
2 846 141,48 €
127 352,15 €
714 317,96 €
22 721 925,96 €
8 221 330,02 €
349 200,32 €
4 813 436,41 €
5 309 952,56 €
46 676 547,71 €
407 580,12 €
722 312,11 €
789 731,92 €
2 360 369,53 €
931 840,01 €
1 818 621,27 €
436 924,25 €
656 813,07 €
1 462 237,96 €
579 279,14 €
2 558 348,00 €
700 938,21 €
18 841 291,55 €
2 402 173,86 €
34 668 461,01 €
9 115 897,86 €
1 217 521,94 €
584 887,19 €
203 031,86 €
384 183,62 €
67 719,44 €
11 573 241,92 €
4 229 771,47 €
6 049 626,77 €
344 451,98 €
1 287 599,91 €
463 495,64 €
277 762,14 €
16 532 581,25 €
190 018,64 €
1 391 245,67 €
6 469 481,84 €
3 922 820,94 €
286 761,03 €
792 965,61 €
42 238 582,90 €
496 222,98 €
517 065,11 €
496 326,91 €
7 517 292,40 €
940 675,82 €
402 729,77 €
3 995 688,39 €
679 413,43 €
7 025 285,21 €
220 709,89 €
381 927,48 €
1 535 389,72 €
1 363 097,38 €
3 461 517,80 €
481 200,50 €
29 514 542,81 €
|
12 104 084,94 €
2 527 659,77 €
992 866,30 €
918 456,16 €
790 035,81 €
7 993 458,56 €
1 772 045,90 €
2 950 811,03 €
2 554 640,81 €
3 694 678,22 €
1 181 337,05 €
9 012 977,25 €
46 493 051,79 €
7 077 055,66 €
3 952 827,50 €
3 732 150,02 €
18 964 993,36 €
2 035 194,37 €
6 916 185,75 €
507 347,21 €
2 912 971,17 €
6 524 151,01 €
9 233 044,37 €
2 835 346,86 €
64 691 267,29 €
1 597 396,28 €
4 829 961,27 €
28 737 380,71 €
1 156 583,15 €
11 916 524,64 €
447 483,86 €
2 622 680,56 €
3 429 291,19 €
1 144 667,68 €
800 173,28 €
1 145 508,79 €
1 267 735,18 €
3 053 191,20 €
186 449,66 €
664 603,38 €
1 102 444,41 €
665 791,18 €
1 432 476,44 €
500 958,22 €
66 701 301,06 €
536 474,78 €
928 832,97 €
2 750 512,07 €
115 398,47 €
684 433,77 €
21 920 064,08 €
7 939 488,29 €
331 269,81 €
4 538 501,88 €
5 184 438,96 €
44 929 415,10 €
377 695,93 €
662 543,73 €
706 056,19 €
2 239 079,19 €
836 210,60 €
1 746 899,22 €
389 109,55 €
591 067,86 €
1 372 585,39 €
507 557,09 €
2 398 619,82 €
671 054,02 €
18 157 033,82 €
2 342 405,48 €
32 997 917,91 €
8 768 668,95 €
1 181 660,92 €
560 979,84 €
179 124,51 €
348 322,60 €
55 765,77 €
11 094 522,58 €
3 994 921,21 €
5 959 974,20 €
308 590,95 €
1 150 132,64 €
421 657,78 €
247 877,96 €
16 303 886,85 €
160 134,45 €
1 313 546,77 €
6 218 812,70 €
3 705 901,19 €
268 830,52 €
745 150,91 €
40 799 418,14 €
466 338,79 €
481 204,09 €
454 489,05 €
7 155 353,99 €
904 814,79 €
372 845,58 €
3 822 252,96 €
607 691,37 €
6 774 974,11 €
202 779,38 €
358 020,13 €
1 479 200,40 €
1 315 282,68 €
3 322 941,15 €
433 385,80 €
28 151 574,27 €
|
25,56 %
5,78 %
2,13 %
2,05 %
1,77 %
17,12 %
3,98 %
6,21 %
5,38 %
7,96 %
2,59 %
19,49 %
10,99 %
6,13 %
5,80 %
29,22 %
3,32 %
10,67 %
0,86 %
4,57 %
10,20 %
13,82 %
4,42 %
2,40 %
7,24 %
42,75 %
1,80 %
17,69 %
0,67 %
3,94 %
5,11 %
1,75 %
1,27 %
1,82 %
1,91 %
4,61 %
0,29 %
1,06 %
1,63 %
1,08 %
2,18 %
0,79 %
1,21 %
2,16 %
6,10 %
0,27 %
1,53 %
48,68 %
17,61 %
0,75 %
10,31 %
11,38 %
1,18 %
2,08 %
2,28 %
6,81 %
2,69 %
5,25 %
1,26 %
1,89 %
4,22 %
1,67 %
7,38 %
2,02 %
54,35 %
6,93 %
78,77 %
10,52 %
5,05 %
1,75 %
3,32 %
0,59 %
10,01 %
14,32 %
0,82 %
3,05 %
1,10 %
0,66 %
39,14 %
0,45 %
3,29 %
15,32 %
9,29 %
0,68 %
1,88 %
1,68 %
1,75 %
1,68 %
25,47 %
3,19 %
1,36 %
13,54 %
2,30 %
23,80 %
0,75 %
1,29 %
5,20 %
4,62 %
11,73 %
1,63 %
|
| Lisbon Metropolitan Area |
Lisbon Metropolitan Area
|
Alcochete
Almada
Amadora
Barreiro
Cascais
Lisboa
Loures
Mafra
Moita
Montijo
Odivelas
Oeiras
Palmela
Seixal
Sesimbra
Setúbal
Sintra
Vila Franca de Xira
Total
|
2 171 775,57 €
19 233 147,39 €
17 241 973,71 €
6 170 414,37 €
44 797 536,13 €
511 177 501,19 €
24 913 343,15 €
13 347 363,82 €
3 964 131,90 €
4 863 365,27 €
14 900 571,55 €
31 664 203,37 €
5 654 625,39 €
13 017 813,60 €
4 678 942,59 €
12 811 350,28 €
44 881 769,75 €
12 767 368,00 €
788 257 197,02 €
|
2 022 354,63 €
18 085 594,54 €
16 229 454,09 €
5 620 545,30 €
43 859 172,60 €
504 770 221,90 €
23 771 767,14 €
12 795 911,79 €
3 569 660,61 €
4 510 731,84 €
13 980 138,53 €
30 713 886,16 €
5 242 223,58 €
12 073 473,23 €
4 314 355,49 €
12 004 477,18 €
42 628 501,92 €
11 882 796,01 €
768 075 266,54 €
|
0,28 %
2,44 %
2,19 %
0,78 %
5,68 %
64,85 %
3,16 %
1,69 %
0,50 %
0,62 %
1,89 %
4,02 %
0,72 %
1,65 %
0,59 %
1,63 %
5,69 %
1,62 %
|
| Alentejo |
Alentejo Litoral
Baixo Alentejo
Lezíria do Tejo
Alto Alentejo
Alentejo Central
|
Alcácer do Sal
Grândola
Odemira
Santiago do Cacém
Sines
Total
Aljustrel
Almodôvar
Alvito
Barrancos
Beja
Castro Verde
Cuba
Ferreira do Alentejo
Mértola
Moura
Ourique
Serpa
Vidigueira
Total
Almeirim
Alpiarça
Azambuja
Benavente
Cartaxo
Chamusca
Coruche
Golegã
Rio Maior
Salvaterra de Magos
Santarém
Total
Alter do Chão
Arronches
Avis
Campo Maior
Castelo de Vide
Crato
Elvas
Fronteira
Gavião
Marvão
Monforte
Nisa
Ponte de Sor
Portalegre
Sousel
Total
Alandroal
Arraiolos
Borba
Estremoz
Évora
Montemor-o-Novo
Mora
Mourão
Portel
Redondo
Reguengos de Monsaraz
Vendas Novas
Viana do Alentejo
Vila Viçosa
Total
|
2 127 623,80 €
2 163 513,21 €
2 498 212,45 €
2 454 273,96 €
14 326 797,36 €
23 570 420,78 €
674 477,25 €
305 017,47 €
217 250,83 €
343 860,85 €
4 858 815,95 €
1 295 161,94 €
2 743 017,51 €
685 955,32 €
839 273,97 €
1 949 789,06 €
508 147,21 €
1 557 395,95 €
591 894,95 €
16 570 058,25 €
2 036 265,08 €
340 553,74 €
1 763 995,74 €
4 578 301,99 €
2 112 269,61 €
424 827,54 €
1 307 134,69 €
253 635,53 €
4 622 287,79 €
1 095 184,75 €
6 518 732,03 €
25 053 188,49 €
166 993,59 €
140 635,24 €
488 479,55 €
739 621,91 €
402 102,86 €
153 373,30 €
2 701 998,51 €
95 150,96 €
190 934,18 €
295 835,79 €
210 123,85 €
1 148 813,24 €
2 427 057,17 €
3 140 419,08 €
546 024,86 €
12 847 564,09 €
459 424,27 €
1 142 653,41 €
530 063,51 €
2 108 588,63 €
12 292 377,35 €
1 651 230,35 €
262 308,82 €
99 492,08 €
272 829,81 €
444 722,31 €
1 409 550,84 €
3 522 421,43 €
519 577,66 €
1 209 621,31 €
25 924 861,78 €
|
2 049 924,91 €
2 061 906,97 €
2 360 745,18 €
2 268 991,99 €
14 219 214,28 €
22 960 783,32 €
608 732,04 €
257 202,77 €
205 297,16 €
337 884,01 €
4 607 788,77 €
1 235 393,56 €
2 719 110,16 €
638 140,62 €
803 412,94 €
1 836 229,14 €
478 263,02 €
1 443 836,04 €
556 033,92 €
15 727 324,13 €
1 874 890,46 €
292 739,03 €
1 620 551,63 €
4 363 135,83 €
1 962 848,67 €
365 059,17 €
1 199 551,61 €
223 751,35 €
4 472 866,85 €
951 740,65 €
6 118 283,90 €
23 445 419,13 €
131 132,57 €
122 704,73 €
470 549,03 €
661 923,02 €
384 172,35 €
141 419,62 €
2 540 623,89 €
77 220,45 €
167 026,83 €
283 882,12 €
186 216,50 €
1 118 929,05 €
2 325 450,93 €
2 961 113,95 €
510 163,83 €
12 082 528,85 €
435 516,92 €
1 100 815,54 €
494 202,49 €
2 018 936,06 €
11 909 859,73 €
1 549 624,11 €
238 401,47 €
75 584,73 €
242 945,62 €
402 884,45 €
1 325 875,11 €
3 450 699,38 €
477 739,80 €
1 155 829,77 €
24 878 915,17 €
|
9,03 %
9,18 %
10,60 %
10,41 %
60,78 %
4,07 %
1,84 %
1,31 %
2,08 %
29,32 %
7,82 %
16,55 %
4,14 %
5,07 %
11,77 %
3,07 %
9,40 %
3,57 %
8,13 %
1,36 %
7,04 %
18,27 %
8,43 %
1,70 %
5,22 %
1,01 %
18,45 %
4,37 %
26,02 %
1,30 %
1,09 %
3,80 %
5,76 %
3,13 %
1,19 %
21,03 %
0,74 %
1,49 %
2,30 %
1,64 %
8,94 %
18,89 %
24,44 %
4,25 %
1,77 %
4,41 %
2,04 %
8,13 %
47,42 %
6,37 %
1,01 %
0,38 %
1,05 %
1,72 %
5,44 %
13,59 %
2,00 %
4,67 %
|
| Algarve |
Algarve
|
Albufeira
Alcoutim
Aljezur
Castro Marim
Faro
Lagoa
Lagos
Loulé
Monchique
Olhão
Portimão
São Brás de Alportel
Silves
Tavira
Vila do Bispo
Vila Real de Santo António
Total
|
37 971 410,65 €
328 280,25 €
1 026 791,29 €
1 822 999,33 €
15 967 633,78 €
9 895 170,02 €
15 738 233,42 €
26 012 718,77 €
715 703,20 €
5 349 368,76 €
17 023 508,65 €
1 829 414,31 €
8 392 299,19 €
5 650 889,67 €
3 889 034,12 €
4 116 502,80 €
155 729 958,22 €
|
37 618 777,22 €
316 326,58 €
996 907,10 €
1 787 138,30 €
15 543 278,30 €
9 739 772,23 €
15 475 252,56 €
25 410 846,02 €
685 819,01 €
5 020 642,68 €
16 569 268,98 €
1 745 738,58 €
8 147 248,84 €
5 471 584,54 €
3 865 126,77 €
3 955 128,18 €
152 348 855,91 €
|
24,38 %
0,21 %
0,66 %
1,17 %
10,25 %
6,35 %
10,11 %
16,70 %
0,46 %
3,44 %
10,93 %
1,17 %
5,39 %
3,63 %
2,50 %
2,64 %
|
| Autonomous Region of the Azores |
Autonomous Region of the Azores
|
Angra do Heroísmo
Calheta
Corvo
Horta
Lagoa
Lajes das Flores
Lajes do Pico
Madalena
Nordeste
Ponta Delgada
Povoação
Praia da Vitória
Ribeira Grande
Santa Cruz da Graciosa
Santa Cruz das Flores
São Roque do Pico
Velas
Vila do Porto
Vila Franca do Campo
Nation-wide investment
Total
|
12 727 280,64 €
1 404 009,03 €
102 315,59 €
3 787 642,41 €
5 207 785,04 €
737 841,47 €
1 150 689,49 €
2 596 397,76 €
2 315 217,53 €
39 728 235,44 €
3 794 767,52 €
5 148 613,44 €
9 992 828,41 €
1 417 064,58 €
670 300,01 €
1 383 452,87 €
2 373 429,14 €
2 114 505,34 €
3 372 479,20 €
33 565 568,99 €
133 590 423,91 €
|
12 430 981,06 €
1 337 921,15 €
102 315,59 €
3 787 642,41 €
5 071 571,47 €
737 841,47 €
1 150 689,49 €
2 588 897,76 €
2 282 586,30 €
38 000 796,55 €
3 745 820,68 €
4 985 457,28 €
9 715 462,95 €
1 410 971,68 €
670 300,01 €
1 383 452,87 €
1 939 152,41 €
2 071 527,79 €
3 274 585,51 €
32 861 657,68 €
129 549 632,10 €
|
9,53 %
1,05 %
0,08 %
2,84 %
3,90 %
0,55 %
0,86 %
1,94 %
1,73 %
29,74 %
2,84 %
3,85 %
7,48 %
1,06 %
0,50 %
1,04 %
1,78 %
1,58 %
2,52 %
25,13 %
|
| Autonomous Region of Madeira |
Autonomous Region of Madeira
|
Calheta
Câmara de Lobos
Funchal
Machico
Ponta do Sol
Porto Moniz
Porto Santo
Ribeira Brava
Santa Cruz
Santana
São Vicente
Total
|
3 218 828,20 €
6 456 605,74 €
55 052 893,33 €
5 359 151,62 €
1 628 858,43 €
1 180 239,76 €
1 703 711,59 €
3 456 357,91 €
9 593 045,97 €
1 526 705,61 €
1 515 739,90 €
90 692 138,06 €
|
3 205 024,84 €
5 913 059,98 €
53 713 544,76 €
5 313 003,52 €
1 611 152,47 €
1 160 544,91 €
1 703 280,54 €
3 397 313,26 €
9 342 058,45 €
1 476 062,45 €
1 448 932,77 €
88 283 977,94 €
|
3,55 %
7,12 %
60,70 %
5,91 %
1,80 %
1,30 %
1,88 %
3,81 %
10,58 %
1,68 %
1,67 %
|
REACT-EU – Investment breakdown by region
Region
North
:Sub-region
Alto Minho
:Municipality
Arcos de Valdevez
:Approved amount
: 4261976,30 €,4 261 976,30 €
Executed amount
: 4142439,55 €,4 142 439,55 €
Percentage of investment
: 11,37 %11,37 %
Municipality
Caminha
:Approved amount
: 2341109,47 €,2 341 109,47 €
Executed amount
: 2251456,91 €,2 251 456,91 €
Percentage of investment
: 6,24 %6,24 %
Municipality
Melgaço
:Approved amount
: 670593,66 €,670 593,66 €
Executed amount
: 628755,80 €,628 755,80 €
Percentage of investment
: 1,79 %1,79 %
Municipality
Monção
:Approved amount
: 1899725,68 €,1 899 725,68 €
Executed amount
: 1810073,12 €,1 810 073,12 €
Percentage of investment
: 5,07 %5,07 %
Municipality
Paredes de Coura
:Approved amount
: 2208469,51 €,2 208 469,51 €
Executed amount
: 2160654,81 €,2 160 654,81 €
Percentage of investment
: 5,89 %5,89 %
Municipality
Ponte da Barca
:Approved amount
: 909345,59 €,909 345,59 €
Executed amount
: 843600,37 €,843 600,37 €
Percentage of investment
: 2,43 %2,43 %
Municipality
Ponte de Lima
:Approved amount
: 4780810,24 €,4 780 810,24 €
Executed amount
: 4493922,03 €,4 493 922,03 €
Percentage of investment
: 12,75 %12,75 %
Municipality
Valença
:Approved amount
: 3460108,74 €,3 460 108,74 €
Executed amount
: 3376433,01 €,3 376 433,01 €
Percentage of investment
: 9,23 %9,23 %
Municipality
Viana do Castelo
:Approved amount
: 14988663,69 €,14 988 663,69 €
Executed amount
: 14391840,31 €,14 391 840,31 €
Percentage of investment
: 39,97 %39,97 %
Municipality
Vila Nova de Cerveira
:Approved amount
: 1975979,50 €,1 975 979,50 €
Executed amount
: 1928164,80 €,1 928 164,80 €
Percentage of investment
: 5,27 %5,27 %
Total
Approved amount
: 37496782,39 €,37 496 782,39 €
Executed amount
: 36027340,70 €,36 027 340,70 €
Percentage of investment
Sub-region
Cávado
:Municipality
Amares
:Approved amount
: 1411930,94 €,1 411 930,94 €
Executed amount
: 1298371,02 €,1 298 371,02 €
Percentage of investment
: 1,83 %1,83 %
Municipality
Barcelos
:Approved amount
: 20975859,63 €,20 975 859,63 €
Executed amount
: 20268042,21 €,20 268 042,21 €
Percentage of investment
: 27,16 %27,16 %
Municipality
Braga
:Approved amount
: 39918784,77 €,39 918 784,77 €
Executed amount
: 38665953,45 €,38 665 953,45 €
Percentage of investment
: 51,68 %51,68 %
Municipality
Esposende
:Approved amount
: 5573259,23 €,5 573 259,23 €
Executed amount
: 5331911,75 €,5 331 911,75 €
Percentage of investment
: 7,22 %7,22 %
Municipality
Terras de Bouro
:Approved amount
: 1157611,35 €,1 157 611,35 €
Executed amount
: 1115773,48 €,1 115 773,48 €
Percentage of investment
: 1,5 %1,50 %
Municipality
Vila Verde
:Approved amount
: 8205174,23 €,8 205 174,23 €
Executed amount
: 7909845,71 €,7 909 845,71 €
Percentage of investment
: 10,62 %10,62 %
Total
Approved amount
: 77242620,14 €,77 242 620,14 €
Executed amount
: 74589897,61 €,74 589 897,61 €
Percentage of investment
Sub-region
Ave
:Municipality
Cabeceiras de Basto
:Approved amount
: 1332110,20 €,1 332 110,20 €
Executed amount
: 1230503,96 €,1 230 503,96 €
Percentage of investment
: 2,07 %2,07 %
Municipality
Fafe
:Approved amount
: 8276653,49 €,8 276 653,49 €
Executed amount
: 7989765,28 €,7 989 765,28 €
Percentage of investment
: 12,88 %12,88 %
Municipality
Guimarães
:Approved amount
: 26585659,88 €,26 585 659,88 €
Executed amount
: 25661918,31 €,25 661 918,31 €
Percentage of investment
: 41,39 %41,39 %
Municipality
Mondim de Basto
:Approved amount
: 1579135,65 €,1 579 135,65 €
Executed amount
: 1531320,94 €,1 531 320,94 €
Percentage of investment
: 2,46 %2,46 %
Municipality
Póvoa de Lanhoso
:Approved amount
: 1587521,55 €,1 587 521,55 €
Executed amount
: 1450054,28 €,1 450 054,28 €
Percentage of investment
: 2,47 %2,47 %
Municipality
Vieira do Minho
:Approved amount
: 1106256,74 €,1 106 256,74 €
Executed amount
: 1034534,69 €,1 034 534,69 €
Percentage of investment
: 1,72 %1,72 %
Municipality
Vila Nova de Famalicão
:Approved amount
: 20258252,25 €,20 258 252,25 €
Executed amount
: 19472735,94 €,19 472 735,94 €
Percentage of investment
: 31,54 %31,54 %
Municipality
Vizela
:Approved amount
: 3513418,29 €,3 513 418,29 €
Executed amount
: 3352043,67 €,3 352 043,67 €
Percentage of investment
: 5,47 %5,47 %
Total
Approved amount
: 64239008,04 €,64 239 008,04 €
Executed amount
: 61722877,06 €,61 722 877,06 €
Percentage of investment
Sub-region
Área Metropolitana do Porto
:Municipality
Arouca
:Approved amount
: 3170433,91 €,3 170 433,91 €
Executed amount
: 3110665,53 €,3 110 665,53 €
Percentage of investment
: 0,98 %0,98 %
Municipality
Espinho
:Approved amount
: 4001781,16 €,4 001 781,16 €
Executed amount
: 3744777,14 €,3 744 777,14 €
Percentage of investment
: 1,23 %1,23 %
Municipality
Gondomar
:Approved amount
: 15651911,01 €,15 651 911,01 €
Executed amount
: 14870184,65 €,14 870 184,65 €
Percentage of investment
: 4,82 %4,82 %
Municipality
Maia
:Approved amount
: 21829284,64 €,21 829 284,64 €
Executed amount
: 21013694,64 €,21 013 694,64 €
Percentage of investment
: 6,72 %6,72 %
Municipality
Matosinhos
:Approved amount
: 31527946,42 €,31 527 946,42 €
Executed amount
: 30570720,20 €,30 570 720,20 €
Percentage of investment
: 9,71 %9,71 %
Municipality
Oliveira de Azeméis
:Approved amount
: 6596974,67 €,6 596 974,67 €
Executed amount
: 6193494,58 €,6 193 494,58 €
Percentage of investment
: 2,03 %2,03 %
Municipality
Paredes
:Approved amount
: 11004137,55 €,11 004 137,55 €
Executed amount
: 10485771,06 €,10 485 771,06 €
Percentage of investment
: 3,39 %3,39 %
Municipality
Porto
:Approved amount
: 111567018,95 €,111 567 018,95 €
Executed amount
: 106699681,02 €,106 699 681,02 €
Percentage of investment
: 34,35 %34,35 %
Municipality
Póvoa de Varzim
:Approved amount
: 12231260,54 €,12 231 260,54 €
Executed amount
: 11766875,09 €,11 766 875,09 €
Percentage of investment
: 3,77 %3,77 %
Municipality
Santa Maria da Feira
:Approved amount
: 14455495,14 €,14 455 495,14 €
Executed amount
: 13768829,70 €,13 768 829,70 €
Percentage of investment
: 4,45 %4,45 %
Municipality
Santo Tirso
:Approved amount
: 13574770,98 €,13 574 770,98 €
Executed amount
: 13165882,54 €,13 165 882,54 €
Percentage of investment
: 4,18 %4,18 %
Municipality
São João da Madeira
:Approved amount
: 4886312,49 €,4 886 312,49 €
Executed amount
: 4638798,67 €,4 638 798,67 €
Percentage of investment
: 1,5 %1,50 %
Municipality
Trofa
:Approved amount
: 7497726,70 €,7 497 726,70 €
Executed amount
: 7284936,92 €,7 284 936,92 €
Percentage of investment
: 2,31 %2,31 %
Municipality
Vale de Cambra
:Approved amount
: 1889475,26 €,1 889 475,26 €
Executed amount
: 1746031,15 €,1 746 031,15 €
Percentage of investment
: 0,58 %0,58 %
Municipality
Valongo
:Approved amount
: 8997147,69 €,8 997 147,69 €
Executed amount
: 8444246,65 €,8 444 246,65 €
Percentage of investment
: 2,77 %2,77 %
Municipality
Vila do Conde
:Approved amount
: 12800217,66 €,12 800 217,66 €
Executed amount
: 12300350,17 €,12 300 350,17 €
Percentage of investment
: 3,94 %3,94 %
Municipality
Vila Nova de Gaia
:Approved amount
: 43137843,90 €,43 137 843,90 €
Executed amount
: 41578853,64 €,41 578 853,64 €
Percentage of investment
: 13,28 %13,28 %
Total
Approved amount
: 324819738,67 €,324 819 738,67 €
Executed amount
: 311383793,35 €,311 383 793,35 €
Percentage of investment
Sub-region
Alto Tâmega
:Municipality
Boticas
:Approved amount
: 2395243,06 €,2 395 243,06 €
Executed amount
: 2377312,54 €,2 377 312,54 €
Percentage of investment
: 16,31 %16,31 %
Municipality
Chaves
:Approved amount
: 5058026,22 €,5 058 026,22 €
Executed amount
: 4830906,38 €,4 830 906,38 €
Percentage of investment
: 34,44 %34,44 %
Municipality
Montalegre
:Approved amount
: 3043969,84 €,3 043 969,84 €
Executed amount
: 2990178,30 €,2 990 178,30 €
Percentage of investment
: 20,72 %20,72 %
Municipality
Ribeira de Pena
:Approved amount
: 676203,98 €,676 203,98 €
Executed amount
: 634366,12 €,634 366,12 €
Percentage of investment
: 4,6 %4,60 %
Municipality
Valpaços
:Approved amount
: 1257007,24 €,1 257 007,24 €
Executed amount
: 1185285,19 €,1 185 285,19 €
Percentage of investment
: 8,56 %8,56 %
Municipality
Vila Pouca de Aguiar
:Approved amount
: 2256984,95 €,2 256 984,95 €
Executed amount
: 2191239,74 €,2 191 239,74 €
Percentage of investment
: 15,37 %15,37 %
Total
Approved amount
: 14687435,30 €,14 687 435,30 €
Executed amount
: 14209288,28 €,14 209 288,28 €
Percentage of investment
Sub-region
Tâmega e Sousa
:Municipality
Amarante
:Approved amount
: 9215621,44 €,9 215 621,44 €
Executed amount
: 8962130,78 €,8 962 130,78 €
Percentage of investment
: 16,93 %16,93 %
Municipality
Baião
:Approved amount
: 2904945,63 €,2 904 945,63 €
Executed amount
: 2791385,71 €,2 791 385,71 €
Percentage of investment
: 5,34 %5,34 %
Municipality
Castelo de Paiva
:Approved amount
: 748929,25 €,748 929,25 €
Executed amount
: 623415,66 €,623 415,66 €
Percentage of investment
: 1,38 %1,38 %
Municipality
Celorico de Basto
:Approved amount
: 2612975,41 €,2 612 975,41 €
Executed amount
: 2499415,49 €,2 499 415,49 €
Percentage of investment
: 4,8 %4,80 %
Municipality
Cinfães
:Approved amount
: 2793481,02 €,2 793 481,02 €
Executed amount
: 2661990,59 €,2 661 990,59 €
Percentage of investment
: 5,13 %5,13 %
Municipality
Felgueiras
:Approved amount
: 8558181,49 €,8 558 181,49 €
Executed amount
: 8149103,55 €,8 149 103,55 €
Percentage of investment
: 15,72 %15,72 %
Municipality
Lousada
:Approved amount
: 4019506,35 €,4 019 506,35 €
Executed amount
: 3684803,43 €,3 684 803,43 €
Percentage of investment
: 7,38 %7,38 %
Municipality
Marco de Canaveses
:Approved amount
: 5491840,86 €,5 491 840,86 €
Executed amount
: 5105722,79 €,5 105 722,79 €
Percentage of investment
: 10,09 %10,09 %
Municipality
Paços de Ferreira
:Approved amount
: 9118885,40 €,9 118 885,40 €
Executed amount
: 8732577,83 €,8 732 577,83 €
Percentage of investment
: 16,75 %16,75 %
Municipality
Penafiel
:Approved amount
: 8458317,07 €,8 458 317,07 €
Executed amount
: 7977138,09 €,7 977 138,09 €
Percentage of investment
: 15,54 %15,54 %
Municipality
Resende
:Approved amount
: 514068,00 €,514 068,00 €
Executed amount
: 442345,95 €,442 345,95 €
Percentage of investment
: 0,94 %0,94 %
Total
Approved amount
: 54436751,91 €,54 436 751,91 €
Executed amount
: 51630029,86 €,51 630 029,86 €
Percentage of investment
Sub-region
Douro
:Municipality
Alijó
:Approved amount
: 1734632,59 €,1 734 632,59 €
Executed amount
: 1662910,54 €,1 662 910,54 €
Percentage of investment
: 8,07 %8,07 %
Municipality
Armamar
:Approved amount
: 537285,51 €,537 285,51 €
Executed amount
: 507401,32 €,507 401,32 €
Percentage of investment
: 2,5 %2,50 %
Municipality
Carrazeda de Ansiães
:Approved amount
: 434662,17 €,434 662,17 €
Executed amount
: 404777,98 €,404 777,98 €
Percentage of investment
: 2,02 %2,02 %
Municipality
Freixo de Espada à Cinta
:Approved amount
: 161793,06 €,161 793,06 €
Executed amount
: 143862,55 €,143 862,55 €
Percentage of investment
: 0,75 %0,75 %
Municipality
Lamego
:Approved amount
: 2556197,93 €,2 556 197,93 €
Executed amount
: 2406776,98 €,2 406 776,98 €
Percentage of investment
: 11,9 %11,90 %
Municipality
Mesão Frio
:Approved amount
: 239497,79 €,239 497,79 €
Executed amount
: 209613,60 €,209 613,60 €
Percentage of investment
: 1,11 %1,11 %
Municipality
Moimenta da Beira
:Approved amount
: 1021355,66 €,1 021 355,66 €
Executed amount
: 949633,61 €,949 633,61 €
Percentage of investment
: 4,75 %4,75 %
Municipality
Murça
:Approved amount
: 874551,13 €,874 551,13 €
Executed amount
: 838690,11 €,838 690,11 €
Percentage of investment
: 4,07 %4,07 %
Municipality
Penedono
:Approved amount
: 120981,96 €,120 981,96 €
Executed amount
: 103051,45 €,103 051,45 €
Percentage of investment
: 0,56 %0,56 %
Municipality
Peso da Régua
:Approved amount
: 1632297,06 €,1 632 297,06 €
Executed amount
: 1512760,31 €,1 512 760,31 €
Percentage of investment
: 7,6 %7,60 %
Municipality
Sabrosa
:Approved amount
: 498437,00 €,498 437,00 €
Executed amount
: 462575,98 €,462 575,98 €
Percentage of investment
: 2,32 %2,32 %
Municipality
Santa Marta de Penaguião
:Approved amount
: 257586,71 €,257 586,71 €
Executed amount
: 227702,52 €,227 702,52 €
Percentage of investment
: 1,2 %1,20 %
Municipality
São João da Pesqueira
:Approved amount
: 406091,46 €,406 091,46 €
Executed amount
: 314243,60 €,314 243,60 €
Percentage of investment
: 1,89 %1,89 %
Municipality
Sernancelhe
:Approved amount
: 297872,86 €,297 872,86 €
Executed amount
: 273965,51 €,273 965,51 €
Percentage of investment
: 1,39 %1,39 %
Municipality
Tabuaço
:Approved amount
: 226160,32 €,226 160,32 €
Executed amount
: 196276,13 €,196 276,13 €
Percentage of investment
: 1,05 %1,05 %
Municipality
Tarouca
:Approved amount
: 303074,46 €,303 074,46 €
Executed amount
: 255259,76 €,255 259,76 €
Percentage of investment
: 1,41 %1,41 %
Municipality
Torre de Moncorvo
:Approved amount
: 871047,21 €,871 047,21 €
Executed amount
: 835186,19 €,835 186,19 €
Percentage of investment
: 4,05 %4,05 %
Municipality
Vila Nova de Foz Côa
:Approved amount
: 521092,58 €,521 092,58 €
Executed amount
: 485231,56 €,485 231,56 €
Percentage of investment
: 2,43 %2,43 %
Municipality
Vila Real
:Approved amount
: 8790483,68 €,8 790 483,68 €
Executed amount
: 8463565,49 €,8 463 565,49 €
Percentage of investment
: 40,91 %40,91 %
Total
Approved amount
: 21485101,17 €,21 485 101,17 €
Executed amount
: 20253485,18 €,20 253 485,18 €
Percentage of investment
Sub-region
Terras de Trás-os-Montes
:Municipality
Alfândega da Fé
:Approved amount
: 1270379,37 €,1 270 379,37 €
Executed amount
: 1246472,02 €,1 246 472,02 €
Percentage of investment
: 7,72 %7,72 %
Municipality
Bragança
:Approved amount
: 6507230,44 €,6 507 230,44 €
Executed amount
: 6289032,32 €,6 289 032,32 €
Percentage of investment
: 39,52 %39,52 %
Municipality
Macedo de Cavaleiros
:Approved amount
: 1502682,50 €,1 502 682,50 €
Executed amount
: 1424983,61 €,1 424 983,61 €
Percentage of investment
: 9,13 %9,13 %
Municipality
Miranda do Douro
:Approved amount
: 2294219,02 €,2 294 219,02 €
Executed amount
: 2246404,32 €,2 246 404,32 €
Percentage of investment
: 13,93 %13,93 %
Municipality
Mirandela
:Approved amount
: 1752180,05 €,1 752 180,05 €
Executed amount
: 1620689,62 €,1 620 689,62 €
Percentage of investment
: 10,64 %10,64 %
Municipality
Mogadouro
:Approved amount
: 1120418,62 €,1 120 418,62 €
Executed amount
: 1078580,76 €,1 078 580,76 €
Percentage of investment
: 6,8 %6,80 %
Municipality
Vila Flor
:Approved amount
: 839546,33 €,839 546,33 €
Executed amount
: 803685,30 €,803 685,30 €
Percentage of investment
: 5,1 %5,10 %
Municipality
Vimioso
:Approved amount
: 775968,33 €,775 968,33 €
Executed amount
: 758037,82 €,758 037,82 €
Percentage of investment
: 4,71 %4,71 %
Municipality
Vinhais
:Approved amount
: 403404,53 €,403 404,53 €
Executed amount
: 367543,50 €,367 543,50 €
Percentage of investment
: 2,45 %2,45 %
Total
Approved amount
: 16466029,19 €,16 466 029,19 €
Executed amount
: 15835429,26 €,15 835 429,26 €
Percentage of investment
Region
Center
:Sub-region
Oeste
:Municipality
Alcobaça
:Approved amount
: 12442760,21 €,12 442 760,21 €
Executed amount
: 12104084,94 €,12 104 084,94 €
Percentage of investment
: 25,56 %25,56 %
Municipality
Alenquer
:Approved amount
: 2814547,98 €,2 814 547,98 €
Executed amount
: 2527659,77 €,2 527 659,77 €
Percentage of investment
: 5,78 %5,78 %
Municipality
Arruda dos Vinhos
:Approved amount
: 1034704,16 €,1 034 704,16 €
Executed amount
: 992866,30 €,992 866,30 €
Percentage of investment
: 2,13 %2,13 %
Municipality
Bombarral
:Approved amount
: 996155,05 €,996 155,05 €
Executed amount
: 918456,16 €,918 456,16 €
Percentage of investment
: 2,05 %2,05 %
Municipality
Cadaval
:Approved amount
: 861757,87 €,861 757,87 €
Executed amount
: 790035,81 €,790 035,81 €
Percentage of investment
: 1,77 %1,77 %
Municipality
Caldas da Rainha
:Approved amount
: 8337001,28 €,8 337 001,28 €
Executed amount
: 7993458,56 €,7 993 458,56 €
Percentage of investment
: 17,12 %17,12 %
Municipality
Lourinhã
:Approved amount
: 1939397,35 €,1 939 397,35 €
Executed amount
: 1772045,90 €,1 772 045,90 €
Percentage of investment
: 3,98 %3,98 %
Municipality
Nazaré
:Approved amount
: 3022533,09 €,3 022 533,09 €
Executed amount
: 2950811,03 €,2 950 811,03 €
Percentage of investment
: 6,21 %6,21 %
Municipality
Óbidos
:Approved amount
: 2620386,03 €,2 620 386,03 €
Executed amount
: 2554640,81 €,2 554 640,81 €
Percentage of investment
: 5,38 %5,38 %
Municipality
Peniche
:Approved amount
: 3873983,35 €,3 873 983,35 €
Executed amount
: 3694678,22 €,3 694 678,22 €
Percentage of investment
: 7,96 %7,96 %
Municipality
Sobral de Monte Agraço
:Approved amount
: 1259035,94 €,1 259 035,94 €
Executed amount
: 1181337,05 €,1 181 337,05 €
Percentage of investment
: 2,59 %2,59 %
Municipality
Torres Vedras
:Approved amount
: 9487366,19 €,9 487 366,19 €
Executed amount
: 9012977,25 €,9 012 977,25 €
Percentage of investment
: 19,49 %19,49 %
Total
Approved amount
: 48689628,49 €,48 689 628,49 €
Executed amount
: 46493051,79 €,46 493 051,79 €
Percentage of investment
Sub-region
Região de Aveiro
:Municipality
Águeda
:Approved amount
: 7391179,37 €,7 391 179,37 €
Executed amount
: 7077055,66 €,7 077 055,66 €
Percentage of investment
: 10,99 %10,99 %
Municipality
Albergaria-a-Velha
:Approved amount
: 4124509,35 €,4 124 509,35 €
Executed amount
: 3952827,50 €,3 952 827,50 €
Percentage of investment
: 6,13 %6,13 %
Municipality
Anadia
:Approved amount
: 3903187,67 €,3 903 187,67 €
Executed amount
: 3732150,02 €,3 732 150,02 €
Percentage of investment
: 5,8 %5,80 %
Municipality
Aveiro
:Approved amount
: 19656409,19 €,19 656 409,19 €
Executed amount
: 18964993,36 €,18 964 993,36 €
Percentage of investment
: 29,22 %29,22 %
Municipality
Estarreja
:Approved amount
: 2232895,20 €,2 232 895,20 €
Executed amount
: 2035194,37 €,2 035 194,37 €
Percentage of investment
: 3,32 %3,32 %
Municipality
Ílhavo
:Approved amount
: 7178164,37 €,7 178 164,37 €
Executed amount
: 6916185,75 €,6 916 185,75 €
Percentage of investment
: 10,67 %10,67 %
Municipality
Murtosa
:Approved amount
: 579069,26 €,579 069,26 €
Executed amount
: 507347,21 €,507 347,21 €
Percentage of investment
: 0,86 %0,86 %
Municipality
Oliveira do Bairro
:Approved amount
: 3071410,94 €,3 071 410,94 €
Executed amount
: 2912971,17 €,2 912 971,17 €
Percentage of investment
: 4,57 %4,57 %
Municipality
Ovar
:Approved amount
: 6859140,09 €,6 859 140,09 €
Executed amount
: 6524151,01 €,6 524 151,01 €
Percentage of investment
: 10,2 %10,20 %
Municipality
Sever do Vouga
:Approved amount
: 9298789,59 €,9 298 789,59 €
Executed amount
: 9233044,37 €,9 233 044,37 €
Percentage of investment
: 13,82 %13,82 %
Municipality
Vagos
:Approved amount
: 2973923,51 €,2 973 923,51 €
Executed amount
: 2835346,86 €,2 835 346,86 €
Percentage of investment
: 4,42 %4,42 %
Total
Approved amount
: 67268678,53 €,67 268 678,53 €
Executed amount
: 64691267,29 €,64 691 267,29 €
Percentage of investment
Sub-region
Região de Coimbra
:Municipality
Arganil
:Approved amount
: 1669118,33 €,1 669 118,33 €
Executed amount
: 1597396,28 €,1 597 396,28 €
Percentage of investment
: 2,4 %2,40 %
Municipality
Cantanhede
:Approved amount
: 5026194,67 €,5 026 194,67 €
Executed amount
: 4829961,27 €,4 829 961,27 €
Percentage of investment
: 7,24 %7,24 %
Municipality
Coimbra
:Approved amount
: 29680145,14 €,29 680 145,14 €
Executed amount
: 28737380,71 €,28 737 380,71 €
Percentage of investment
: 42,75 %42,75 %
Municipality
Condeixa-a-Nova
:Approved amount
: 1252212,55 €,1 252 212,55 €
Executed amount
: 1156583,15 €,1 156 583,15 €
Percentage of investment
: 1,8 %1,80 %
Municipality
Figueira da Foz
:Approved amount
: 12285084,09 €,12 285 084,09 €
Executed amount
: 11916524,64 €,11 916 524,64 €
Percentage of investment
: 17,69 %17,69 %
Municipality
Góis
:Approved amount
: 465414,37 €,465 414,37 €
Executed amount
: 447483,86 €,447 483,86 €
Percentage of investment
: 0,67 %0,67 %
Municipality
Lousã
:Approved amount
: 2733949,83 €,2 733 949,83 €
Executed amount
: 2622680,56 €,2 622 680,56 €
Percentage of investment
: 3,94 %3,94 %
Municipality
Mealhada
:Approved amount
: 3551225,73 €,3 551 225,73 €
Executed amount
: 3429291,19 €,3 429 291,19 €
Percentage of investment
: 5,11 %5,11 %
Municipality
Mira
:Approved amount
: 1216389,73 €,1 216 389,73 €
Executed amount
: 1144667,68 €,1 144 667,68 €
Percentage of investment
: 1,75 %1,75 %
Municipality
Miranda do Corvo
:Approved amount
: 883849,01 €,883 849,01 €
Executed amount
: 800173,28 €,800 173,28 €
Percentage of investment
: 1,27 %1,27 %
Municipality
Montemor-o-Velho
:Approved amount
: 1265045,55 €,1 265 045,55 €
Executed amount
: 1145508,79 €,1 145 508,79 €
Percentage of investment
: 1,82 %1,82 %
Municipality
Mortágua
:Approved amount
: 1323280,30 €,1 323 280,30 €
Executed amount
: 1267735,18 €,1 267 735,18 €
Percentage of investment
: 1,91 %1,91 %
Municipality
Oliveira do Hospital
:Approved amount
: 3199498,27 €,3 199 498,27 €
Executed amount
: 3053191,20 €,3 053 191,20 €
Percentage of investment
: 4,61 %4,61 %
Municipality
Pampilhosa da Serra
:Approved amount
: 204380,17 €,204 380,17 €
Executed amount
: 186449,66 €,186 449,66 €
Percentage of investment
: 0,29 %0,29 %
Municipality
Penacova
:Approved amount
: 736325,44 €,736 325,44 €
Executed amount
: 664603,38 €,664 603,38 €
Percentage of investment
: 1,06 %1,06 %
Municipality
Penela
:Approved amount
: 1132793,78 €,1 132 793,78 €
Executed amount
: 1102444,41 €,1 102 444,41 €
Percentage of investment
: 1,63 %1,63 %
Municipality
Soure
:Approved amount
: 749466,91 €,749 466,91 €
Executed amount
: 665791,18 €,665 791,18 €
Percentage of investment
: 1,08 %1,08 %
Municipality
Tábua
:Approved amount
: 1511284,71 €,1 511 284,71 €
Executed amount
: 1432476,44 €,1 432 476,44 €
Percentage of investment
: 2,18 %2,18 %
Municipality
Vila Nova de Poiares
:Approved amount
: 548772,92 €,548 772,92 €
Executed amount
: 500958,22 €,500 958,22 €
Percentage of investment
: 0,79 %0,79 %
Total
Approved amount
: 69434431,50 €,69 434 431,50 €
Executed amount
: 66701301,06 €,66 701 301,06 €
Percentage of investment
Sub-region
Região de Leiria
:Municipality
Alvaiázere
:Approved amount
: 566358,97 €,566 358,97 €
Executed amount
: 536474,78 €,536 474,78 €
Percentage of investment
: 1,21 %1,21 %
Municipality
Ansião
:Approved amount
: 1006531,87 €,1 006 531,87 €
Executed amount
: 928832,97 €,928 832,97 €
Percentage of investment
: 2,16 %2,16 %
Municipality
Batalha
:Approved amount
: 2846141,48 €,2 846 141,48 €
Executed amount
: 2750512,07 €,2 750 512,07 €
Percentage of investment
: 6,1 %6,10 %
Municipality
Castanheira de Pêra
:Approved amount
: 127352,15 €,127 352,15 €
Executed amount
: 115398,47 €,115 398,47 €
Percentage of investment
: 0,27 %0,27 %
Municipality
Figueiró dos Vinhos
:Approved amount
: 714317,96 €,714 317,96 €
Executed amount
: 684433,77 €,684 433,77 €
Percentage of investment
: 1,53 %1,53 %
Municipality
Leiria
:Approved amount
: 22721925,96 €,22 721 925,96 €
Executed amount
: 21920064,08 €,21 920 064,08 €
Percentage of investment
: 48,68 %48,68 %
Municipality
Marinha Grande
:Approved amount
: 8221330,02 €,8 221 330,02 €
Executed amount
: 7939488,29 €,7 939 488,29 €
Percentage of investment
: 17,61 %17,61 %
Municipality
Pedrógão Grande
:Approved amount
: 349200,32 €,349 200,32 €
Executed amount
: 331269,81 €,331 269,81 €
Percentage of investment
: 0,75 %0,75 %
Municipality
Pombal
:Approved amount
: 4813436,41 €,4 813 436,41 €
Executed amount
: 4538501,88 €,4 538 501,88 €
Percentage of investment
: 10,31 %10,31 %
Municipality
Porto de Mós
:Approved amount
: 5309952,56 €,5 309 952,56 €
Executed amount
: 5184438,96 €,5 184 438,96 €
Percentage of investment
: 11,38 %11,38 %
Total
Approved amount
: 46676547,71 €,46 676 547,71 €
Executed amount
: 44929415,10 €,44 929 415,10 €
Percentage of investment
Sub-region
Viseu Dão Lafões
:Municipality
Aguiar da Beira
:Approved amount
: 407580,12 €,407 580,12 €
Executed amount
: 377695,93 €,377 695,93 €
Percentage of investment
: 1,18 %1,18 %
Municipality
Carregal do Sal
:Approved amount
: 722312,11 €,722 312,11 €
Executed amount
: 662543,73 €,662 543,73 €
Percentage of investment
: 2,08 %2,08 %
Municipality
Castro Daire
:Approved amount
: 789731,92 €,789 731,92 €
Executed amount
: 706056,19 €,706 056,19 €
Percentage of investment
: 2,28 %2,28 %
Municipality
Mangualde
:Approved amount
: 2360369,53 €,2 360 369,53 €
Executed amount
: 2239079,19 €,2 239 079,19 €
Percentage of investment
: 6,81 %6,81 %
Municipality
Nelas
:Approved amount
: 931840,01 €,931 840,01 €
Executed amount
: 836210,60 €,836 210,60 €
Percentage of investment
: 2,69 %2,69 %
Municipality
Oliveira de Frades
:Approved amount
: 1818621,27 €,1 818 621,27 €
Executed amount
: 1746899,22 €,1 746 899,22 €
Percentage of investment
: 5,25 %5,25 %
Municipality
Penalva do Castelo
:Approved amount
: 436924,25 €,436 924,25 €
Executed amount
: 389109,55 €,389 109,55 €
Percentage of investment
: 1,26 %1,26 %
Municipality
Santa Comba Dão
:Approved amount
: 656813,07 €,656 813,07 €
Executed amount
: 591067,86 €,591 067,86 €
Percentage of investment
: 1,89 %1,89 %
Municipality
São Pedro do Sul
:Approved amount
: 1462237,96 €,1 462 237,96 €
Executed amount
: 1372585,39 €,1 372 585,39 €
Percentage of investment
: 4,22 %4,22 %
Municipality
Sátão
:Approved amount
: 579279,14 €,579 279,14 €
Executed amount
: 507557,09 €,507 557,09 €
Percentage of investment
: 1,67 %1,67 %
Municipality
Tondela
:Approved amount
: 2558348,00 €,2 558 348,00 €
Executed amount
: 2398619,82 €,2 398 619,82 €
Percentage of investment
: 7,38 %7,38 %
Municipality
Vila Nova de Paiva
:Approved amount
: 700938,21 €,700 938,21 €
Executed amount
: 671054,02 €,671 054,02 €
Percentage of investment
: 2,02 %2,02 %
Municipality
Viseu
:Approved amount
: 18841291,55 €,18 841 291,55 €
Executed amount
: 18157033,82 €,18 157 033,82 €
Percentage of investment
: 54,35 %54,35 %
Municipality
Vouzela
:Approved amount
: 2402173,86 €,2 402 173,86 €
Executed amount
: 2342405,48 €,2 342 405,48 €
Percentage of investment
: 6,93 %6,93 %
Total
Approved amount
: 34668461,01 €,34 668 461,01 €
Executed amount
: 32997917,91 €,32 997 917,91 €
Percentage of investment
Sub-region
Beira Baixa
:Municipality
Castelo Branco
:Approved amount
: 9115897,86 €,9 115 897,86 €
Executed amount
: 8768668,95 €,8 768 668,95 €
Percentage of investment
: 78,77 %78,77 %
Municipality
Idanha-a-Nova
:Approved amount
: 1217521,94 €,1 217 521,94 €
Executed amount
: 1181660,92 €,1 181 660,92 €
Percentage of investment
: 10,52 %10,52 %
Municipality
Oleiros
:Approved amount
: 584887,19 €,584 887,19 €
Executed amount
: 560979,84 €,560 979,84 €
Percentage of investment
: 5,05 %5,05 %
Municipality
Penamacor
:Approved amount
: 203031,86 €,203 031,86 €
Executed amount
: 179124,51 €,179 124,51 €
Percentage of investment
: 1,75 %1,75 %
Municipality
Proença-a-Nova
:Approved amount
: 384183,62 €,384 183,62 €
Executed amount
: 348322,60 €,348 322,60 €
Percentage of investment
: 3,32 %3,32 %
Municipality
Vila Velha de Ródão
:Approved amount
: 67719,44 €,67 719,44 €
Executed amount
: 55765,77 €,55 765,77 €
Percentage of investment
: 0,59 %0,59 %
Total
Approved amount
: 11573241,92 €,11 573 241,92 €
Executed amount
: 11094522,58 €,11 094 522,58 €
Percentage of investment
Sub-region
Médio Tejo
:Municipality
Abrantes
:Approved amount
: 4229771,47 €,4 229 771,47 €
Executed amount
: 3994921,21 €,3 994 921,21 €
Percentage of investment
: 10,01 %10,01 %
Municipality
Alcanena
:Approved amount
: 6049626,77 €,6 049 626,77 €
Executed amount
: 5959974,20 €,5 959 974,20 €
Percentage of investment
: 14,32 %14,32 %
Municipality
Constância
:Approved amount
: 344451,98 €,344 451,98 €
Executed amount
: 308590,95 €,308 590,95 €
Percentage of investment
: 0,82 %0,82 %
Municipality
Entroncamento
:Approved amount
: 1287599,91 €,1 287 599,91 €
Executed amount
: 1150132,64 €,1 150 132,64 €
Percentage of investment
: 3,05 %3,05 %
Municipality
Ferreira do Zêzere
:Approved amount
: 463495,64 €,463 495,64 €
Executed amount
: 421657,78 €,421 657,78 €
Percentage of investment
: 1,1 %1,10 %
Municipality
Mação
:Approved amount
: 277762,14 €,277 762,14 €
Executed amount
: 247877,96 €,247 877,96 €
Percentage of investment
: 0,66 %0,66 %
Municipality
Ourém
:Approved amount
: 16532581,25 €,16 532 581,25 €
Executed amount
: 16303886,85 €,16 303 886,85 €
Percentage of investment
: 39,14 %39,14 %
Municipality
Sardoal
:Approved amount
: 190018,64 €,190 018,64 €
Executed amount
: 160134,45 €,160 134,45 €
Percentage of investment
: 0,45 %0,45 %
Municipality
Sertã
:Approved amount
: 1391245,67 €,1 391 245,67 €
Executed amount
: 1313546,77 €,1 313 546,77 €
Percentage of investment
: 3,29 %3,29 %
Municipality
Tomar
:Approved amount
: 6469481,84 €,6 469 481,84 €
Executed amount
: 6218812,70 €,6 218 812,70 €
Percentage of investment
: 15,32 %15,32 %
Municipality
Torres Novas
:Approved amount
: 3922820,94 €,3 922 820,94 €
Executed amount
: 3705901,19 €,3 705 901,19 €
Percentage of investment
: 9,29 %9,29 %
Municipality
Vila de Rei
:Approved amount
: 286761,03 €,286 761,03 €
Executed amount
: 268830,52 €,268 830,52 €
Percentage of investment
: 0,68 %0,68 %
Municipality
Vila Nova da Barquinha
:Approved amount
: 792965,61 €,792 965,61 €
Executed amount
: 745150,91 €,745 150,91 €
Percentage of investment
: 1,88 %1,88 %
Total
Approved amount
: 42238582,90 €,42 238 582,90 €
Executed amount
: 40799418,14 €,40 799 418,14 €
Percentage of investment
Sub-region
Beiras e Serra da Estrela
:Municipality
Almeida
:Approved amount
: 496222,98 €,496 222,98 €
Executed amount
: 466338,79 €,466 338,79 €
Percentage of investment
: 1,68 %1,68 %
Municipality
Belmonte
:Approved amount
: 517065,11 €,517 065,11 €
Executed amount
: 481204,09 €,481 204,09 €
Percentage of investment
: 1,75 %1,75 %
Municipality
Celorico da Beira
:Approved amount
: 496326,91 €,496 326,91 €
Executed amount
: 454489,05 €,454 489,05 €
Percentage of investment
: 1,68 %1,68 %
Municipality
Covilhã
:Approved amount
: 7517292,40 €,7 517 292,40 €
Executed amount
: 7155353,99 €,7 155 353,99 €
Percentage of investment
: 25,47 %25,47 %
Municipality
Figueira de Castelo Rodrigo
:Approved amount
: 940675,82 €,940 675,82 €
Executed amount
: 904814,79 €,904 814,79 €
Percentage of investment
: 3,19 %3,19 %
Municipality
Fornos de Algodres
:Approved amount
: 402729,77 €,402 729,77 €
Executed amount
: 372845,58 €,372 845,58 €
Percentage of investment
: 1,36 %1,36 %
Municipality
Fundão
:Approved amount
: 3995688,39 €,3 995 688,39 €
Executed amount
: 3822252,96 €,3 822 252,96 €
Percentage of investment
: 13,54 %13,54 %
Municipality
Gouveia
:Approved amount
: 679413,43 €,679 413,43 €
Executed amount
: 607691,37 €,607 691,37 €
Percentage of investment
: 2,3 %2,30 %
Municipality
Guarda
:Approved amount
: 7025285,21 €,7 025 285,21 €
Executed amount
: 6774974,11 €,6 774 974,11 €
Percentage of investment
: 23,8 %23,80 %
Municipality
Manteigas
:Approved amount
: 220709,89 €,220 709,89 €
Executed amount
: 202779,38 €,202 779,38 €
Percentage of investment
: 0,75 %0,75 %
Municipality
Mêda
:Approved amount
: 381927,48 €,381 927,48 €
Executed amount
: 358020,13 €,358 020,13 €
Percentage of investment
: 1,29 %1,29 %
Municipality
Pinhel
:Approved amount
: 1535389,72 €,1 535 389,72 €
Executed amount
: 1479200,40 €,1 479 200,40 €
Percentage of investment
: 5,2 %5,20 %
Municipality
Sabugal
:Approved amount
: 1363097,38 €,1 363 097,38 €
Executed amount
: 1315282,68 €,1 315 282,68 €
Percentage of investment
: 4,62 %4,62 %
Municipality
Seia
:Approved amount
: 3461517,80 €,3 461 517,80 €
Executed amount
: 3322941,15 €,3 322 941,15 €
Percentage of investment
: 11,73 %11,73 %
Municipality
Trancoso
:Approved amount
: 481200,50 €,481 200,50 €
Executed amount
: 433385,80 €,433 385,80 €
Percentage of investment
: 1,63 %1,63 %
Total
Approved amount
: 29514542,81 €,29 514 542,81 €
Executed amount
: 28151574,27 €,28 151 574,27 €
Percentage of investment
Region
Lisbon Metropolitan Area
:Sub-region
Lisbon Metropolitan Area
:Municipality
Alcochete
:Approved amount
: 2171775,57 €,2 171 775,57 €
Executed amount
: 2022354,63 €,2 022 354,63 €
Percentage of investment
: 0,28 %0,28 %
Municipality
Almada
:Approved amount
: 19233147,39 €,19 233 147,39 €
Executed amount
: 18085594,54 €,18 085 594,54 €
Percentage of investment
: 2,44 %2,44 %
Municipality
Amadora
:Approved amount
: 17241973,71 €,17 241 973,71 €
Executed amount
: 16229454,09 €,16 229 454,09 €
Percentage of investment
: 2,19 %2,19 %
Municipality
Barreiro
:Approved amount
: 6170414,37 €,6 170 414,37 €
Executed amount
: 5620545,30 €,5 620 545,30 €
Percentage of investment
: 0,78 %0,78 %
Municipality
Cascais
:Approved amount
: 44797536,13 €,44 797 536,13 €
Executed amount
: 43859172,60 €,43 859 172,60 €
Percentage of investment
: 5,68 %5,68 %
Municipality
Lisboa
:Approved amount
: 511177501,19 €,511 177 501,19 €
Executed amount
: 504770221,90 €,504 770 221,90 €
Percentage of investment
: 64,85 %64,85 %
Municipality
Loures
:Approved amount
: 24913343,15 €,24 913 343,15 €
Executed amount
: 23771767,14 €,23 771 767,14 €
Percentage of investment
: 3,16 %3,16 %
Municipality
Mafra
:Approved amount
: 13347363,82 €,13 347 363,82 €
Executed amount
: 12795911,79 €,12 795 911,79 €
Percentage of investment
: 1,69 %1,69 %
Municipality
Moita
:Approved amount
: 3964131,90 €,3 964 131,90 €
Executed amount
: 3569660,61 €,3 569 660,61 €
Percentage of investment
: 0,5 %0,50 %
Municipality
Montijo
:Approved amount
: 4863365,27 €,4 863 365,27 €
Executed amount
: 4510731,84 €,4 510 731,84 €
Percentage of investment
: 0,62 %0,62 %
Municipality
Odivelas
:Approved amount
: 14900571,55 €,14 900 571,55 €
Executed amount
: 13980138,53 €,13 980 138,53 €
Percentage of investment
: 1,89 %1,89 %
Municipality
Oeiras
:Approved amount
: 31664203,37 €,31 664 203,37 €
Executed amount
: 30713886,16 €,30 713 886,16 €
Percentage of investment
: 4,02 %4,02 %
Municipality
Palmela
:Approved amount
: 5654625,39 €,5 654 625,39 €
Executed amount
: 5242223,58 €,5 242 223,58 €
Percentage of investment
: 0,72 %0,72 %
Municipality
Seixal
:Approved amount
: 13017813,60 €,13 017 813,60 €
Executed amount
: 12073473,23 €,12 073 473,23 €
Percentage of investment
: 1,65 %1,65 %
Municipality
Sesimbra
:Approved amount
: 4678942,59 €,4 678 942,59 €
Executed amount
: 4314355,49 €,4 314 355,49 €
Percentage of investment
: 0,59 %0,59 %
Municipality
Setúbal
:Approved amount
: 12811350,28 €,12 811 350,28 €
Executed amount
: 12004477,18 €,12 004 477,18 €
Percentage of investment
: 1,63 %1,63 %
Municipality
Sintra
:Approved amount
: 44881769,75 €,44 881 769,75 €
Executed amount
: 42628501,92 €,42 628 501,92 €
Percentage of investment
: 5,69 %5,69 %
Municipality
Vila Franca de Xira
:Approved amount
: 12767368,00 €,12 767 368,00 €
Executed amount
: 11882796,01 €,11 882 796,01 €
Percentage of investment
: 1,62 %1,62 %
Total
Approved amount
: 788257197,02 €,788 257 197,02 €
Executed amount
: 768075266,54 €,768 075 266,54 €
Percentage of investment
Region
Alentejo
:Sub-region
Alentejo Litoral
:Municipality
Alcácer do Sal
:Approved amount
: 2127623,80 €,2 127 623,80 €
Executed amount
: 2049924,91 €,2 049 924,91 €
Percentage of investment
: 9,03 %9,03 %
Municipality
Grândola
:Approved amount
: 2163513,21 €,2 163 513,21 €
Executed amount
: 2061906,97 €,2 061 906,97 €
Percentage of investment
: 9,18 %9,18 %
Municipality
Odemira
:Approved amount
: 2498212,45 €,2 498 212,45 €
Executed amount
: 2360745,18 €,2 360 745,18 €
Percentage of investment
: 10,6 %10,60 %
Municipality
Santiago do Cacém
:Approved amount
: 2454273,96 €,2 454 273,96 €
Executed amount
: 2268991,99 €,2 268 991,99 €
Percentage of investment
: 10,41 %10,41 %
Municipality
Sines
:Approved amount
: 14326797,36 €,14 326 797,36 €
Executed amount
: 14219214,28 €,14 219 214,28 €
Percentage of investment
: 60,78 %60,78 %
Total
Approved amount
: 23570420,78 €,23 570 420,78 €
Executed amount
: 22960783,32 €,22 960 783,32 €
Percentage of investment
Sub-region
Baixo Alentejo
:Municipality
Aljustrel
:Approved amount
: 674477,25 €,674 477,25 €
Executed amount
: 608732,04 €,608 732,04 €
Percentage of investment
: 4,07 %4,07 %
Municipality
Almodôvar
:Approved amount
: 305017,47 €,305 017,47 €
Executed amount
: 257202,77 €,257 202,77 €
Percentage of investment
: 1,84 %1,84 %
Municipality
Alvito
:Approved amount
: 217250,83 €,217 250,83 €
Executed amount
: 205297,16 €,205 297,16 €
Percentage of investment
: 1,31 %1,31 %
Municipality
Barrancos
:Approved amount
: 343860,85 €,343 860,85 €
Executed amount
: 337884,01 €,337 884,01 €
Percentage of investment
: 2,08 %2,08 %
Municipality
Beja
:Approved amount
: 4858815,95 €,4 858 815,95 €
Executed amount
: 4607788,77 €,4 607 788,77 €
Percentage of investment
: 29,32 %29,32 %
Municipality
Castro Verde
:Approved amount
: 1295161,94 €,1 295 161,94 €
Executed amount
: 1235393,56 €,1 235 393,56 €
Percentage of investment
: 7,82 %7,82 %
Municipality
Cuba
:Approved amount
: 2743017,51 €,2 743 017,51 €
Executed amount
: 2719110,16 €,2 719 110,16 €
Percentage of investment
: 16,55 %16,55 %
Municipality
Ferreira do Alentejo
:Approved amount
: 685955,32 €,685 955,32 €
Executed amount
: 638140,62 €,638 140,62 €
Percentage of investment
: 4,14 %4,14 %
Municipality
Mértola
:Approved amount
: 839273,97 €,839 273,97 €
Executed amount
: 803412,94 €,803 412,94 €
Percentage of investment
: 5,07 %5,07 %
Municipality
Moura
:Approved amount
: 1949789,06 €,1 949 789,06 €
Executed amount
: 1836229,14 €,1 836 229,14 €
Percentage of investment
: 11,77 %11,77 %
Municipality
Ourique
:Approved amount
: 508147,21 €,508 147,21 €
Executed amount
: 478263,02 €,478 263,02 €
Percentage of investment
: 3,07 %3,07 %
Municipality
Serpa
:Approved amount
: 1557395,95 €,1 557 395,95 €
Executed amount
: 1443836,04 €,1 443 836,04 €
Percentage of investment
: 9,4 %9,40 %
Municipality
Vidigueira
:Approved amount
: 591894,95 €,591 894,95 €
Executed amount
: 556033,92 €,556 033,92 €
Percentage of investment
: 3,57 %3,57 %
Total
Approved amount
: 16570058,25 €,16 570 058,25 €
Executed amount
: 15727324,13 €,15 727 324,13 €
Percentage of investment
Sub-region
Lezíria do Tejo
:Municipality
Almeirim
:Approved amount
: 2036265,08 €,2 036 265,08 €
Executed amount
: 1874890,46 €,1 874 890,46 €
Percentage of investment
: 8,13 %8,13 %
Municipality
Alpiarça
:Approved amount
: 340553,74 €,340 553,74 €
Executed amount
: 292739,03 €,292 739,03 €
Percentage of investment
: 1,36 %1,36 %
Municipality
Azambuja
:Approved amount
: 1763995,74 €,1 763 995,74 €
Executed amount
: 1620551,63 €,1 620 551,63 €
Percentage of investment
: 7,04 %7,04 %
Municipality
Benavente
:Approved amount
: 4578301,99 €,4 578 301,99 €
Executed amount
: 4363135,83 €,4 363 135,83 €
Percentage of investment
: 18,27 %18,27 %
Municipality
Cartaxo
:Approved amount
: 2112269,61 €,2 112 269,61 €
Executed amount
: 1962848,67 €,1 962 848,67 €
Percentage of investment
: 8,43 %8,43 %
Municipality
Chamusca
:Approved amount
: 424827,54 €,424 827,54 €
Executed amount
: 365059,17 €,365 059,17 €
Percentage of investment
: 1,7 %1,70 %
Municipality
Coruche
:Approved amount
: 1307134,69 €,1 307 134,69 €
Executed amount
: 1199551,61 €,1 199 551,61 €
Percentage of investment
: 5,22 %5,22 %
Municipality
Golegã
:Approved amount
: 253635,53 €,253 635,53 €
Executed amount
: 223751,35 €,223 751,35 €
Percentage of investment
: 1,01 %1,01 %
Municipality
Rio Maior
:Approved amount
: 4622287,79 €,4 622 287,79 €
Executed amount
: 4472866,85 €,4 472 866,85 €
Percentage of investment
: 18,45 %18,45 %
Municipality
Salvaterra de Magos
:Approved amount
: 1095184,75 €,1 095 184,75 €
Executed amount
: 951740,65 €,951 740,65 €
Percentage of investment
: 4,37 %4,37 %
Municipality
Santarém
:Approved amount
: 6518732,03 €,6 518 732,03 €
Executed amount
: 6118283,90 €,6 118 283,90 €
Percentage of investment
: 26,02 %26,02 %
Total
Approved amount
: 25053188,49 €,25 053 188,49 €
Executed amount
: 23445419,13 €,23 445 419,13 €
Percentage of investment
Sub-region
Alto Alentejo
:Municipality
Alter do Chão
:Approved amount
: 166993,59 €,166 993,59 €
Executed amount
: 131132,57 €,131 132,57 €
Percentage of investment
: 1,3 %1,30 %
Municipality
Arronches
:Approved amount
: 140635,24 €,140 635,24 €
Executed amount
: 122704,73 €,122 704,73 €
Percentage of investment
: 1,09 %1,09 %
Municipality
Avis
:Approved amount
: 488479,55 €,488 479,55 €
Executed amount
: 470549,03 €,470 549,03 €
Percentage of investment
: 3,8 %3,80 %
Municipality
Campo Maior
:Approved amount
: 739621,91 €,739 621,91 €
Executed amount
: 661923,02 €,661 923,02 €
Percentage of investment
: 5,76 %5,76 %
Municipality
Castelo de Vide
:Approved amount
: 402102,86 €,402 102,86 €
Executed amount
: 384172,35 €,384 172,35 €
Percentage of investment
: 3,13 %3,13 %
Municipality
Crato
:Approved amount
: 153373,30 €,153 373,30 €
Executed amount
: 141419,62 €,141 419,62 €
Percentage of investment
: 1,19 %1,19 %
Municipality
Elvas
:Approved amount
: 2701998,51 €,2 701 998,51 €
Executed amount
: 2540623,89 €,2 540 623,89 €
Percentage of investment
: 21,03 %21,03 %
Municipality
Fronteira
:Approved amount
: 95150,96 €,95 150,96 €
Executed amount
: 77220,45 €,77 220,45 €
Percentage of investment
: 0,74 %0,74 %
Municipality
Gavião
:Approved amount
: 190934,18 €,190 934,18 €
Executed amount
: 167026,83 €,167 026,83 €
Percentage of investment
: 1,49 %1,49 %
Municipality
Marvão
:Approved amount
: 295835,79 €,295 835,79 €
Executed amount
: 283882,12 €,283 882,12 €
Percentage of investment
: 2,3 %2,30 %
Municipality
Monforte
:Approved amount
: 210123,85 €,210 123,85 €
Executed amount
: 186216,50 €,186 216,50 €
Percentage of investment
: 1,64 %1,64 %
Municipality
Nisa
:Approved amount
: 1148813,24 €,1 148 813,24 €
Executed amount
: 1118929,05 €,1 118 929,05 €
Percentage of investment
: 8,94 %8,94 %
Municipality
Ponte de Sor
:Approved amount
: 2427057,17 €,2 427 057,17 €
Executed amount
: 2325450,93 €,2 325 450,93 €
Percentage of investment
: 18,89 %18,89 %
Municipality
Portalegre
:Approved amount
: 3140419,08 €,3 140 419,08 €
Executed amount
: 2961113,95 €,2 961 113,95 €
Percentage of investment
: 24,44 %24,44 %
Municipality
Sousel
:Approved amount
: 546024,86 €,546 024,86 €
Executed amount
: 510163,83 €,510 163,83 €
Percentage of investment
: 4,25 %4,25 %
Total
Approved amount
: 12847564,09 €,12 847 564,09 €
Executed amount
: 12082528,85 €,12 082 528,85 €
Percentage of investment
Sub-region
Alentejo Central
:Municipality
Alandroal
:Approved amount
: 459424,27 €,459 424,27 €
Executed amount
: 435516,92 €,435 516,92 €
Percentage of investment
: 1,77 %1,77 %
Municipality
Arraiolos
:Approved amount
: 1142653,41 €,1 142 653,41 €
Executed amount
: 1100815,54 €,1 100 815,54 €
Percentage of investment
: 4,41 %4,41 %
Municipality
Borba
:Approved amount
: 530063,51 €,530 063,51 €
Executed amount
: 494202,49 €,494 202,49 €
Percentage of investment
: 2,04 %2,04 %
Municipality
Estremoz
:Approved amount
: 2108588,63 €,2 108 588,63 €
Executed amount
: 2018936,06 €,2 018 936,06 €
Percentage of investment
: 8,13 %8,13 %
Municipality
Évora
:Approved amount
: 12292377,35 €,12 292 377,35 €
Executed amount
: 11909859,73 €,11 909 859,73 €
Percentage of investment
: 47,42 %47,42 %
Municipality
Montemor-o-Novo
:Approved amount
: 1651230,35 €,1 651 230,35 €
Executed amount
: 1549624,11 €,1 549 624,11 €
Percentage of investment
: 6,37 %6,37 %
Municipality
Mora
:Approved amount
: 262308,82 €,262 308,82 €
Executed amount
: 238401,47 €,238 401,47 €
Percentage of investment
: 1,01 %1,01 %
Municipality
Mourão
:Approved amount
: 99492,08 €,99 492,08 €
Executed amount
: 75584,73 €,75 584,73 €
Percentage of investment
: 0,38 %0,38 %
Municipality
Portel
:Approved amount
: 272829,81 €,272 829,81 €
Executed amount
: 242945,62 €,242 945,62 €
Percentage of investment
: 1,05 %1,05 %
Municipality
Redondo
:Approved amount
: 444722,31 €,444 722,31 €
Executed amount
: 402884,45 €,402 884,45 €
Percentage of investment
: 1,72 %1,72 %
Municipality
Reguengos de Monsaraz
:Approved amount
: 1409550,84 €,1 409 550,84 €
Executed amount
: 1325875,11 €,1 325 875,11 €
Percentage of investment
: 5,44 %5,44 %
Municipality
Vendas Novas
:Approved amount
: 3522421,43 €,3 522 421,43 €
Executed amount
: 3450699,38 €,3 450 699,38 €
Percentage of investment
: 13,59 %13,59 %
Municipality
Viana do Alentejo
:Approved amount
: 519577,66 €,519 577,66 €
Executed amount
: 477739,80 €,477 739,80 €
Percentage of investment
: 2 %2,00 %
Municipality
Vila Viçosa
:Approved amount
: 1209621,31 €,1 209 621,31 €
Executed amount
: 1155829,77 €,1 155 829,77 €
Percentage of investment
: 4,67 %4,67 %
Total
Approved amount
: 25924861,78 €,25 924 861,78 €
Executed amount
: 24878915,17 €,24 878 915,17 €
Percentage of investment
Region
Algarve
:Sub-region
Algarve
:Municipality
Albufeira
:Approved amount
: 37971410,65 €,37 971 410,65 €
Executed amount
: 37618777,22 €,37 618 777,22 €
Percentage of investment
: 24,38 %24,38 %
Municipality
Alcoutim
:Approved amount
: 328280,25 €,328 280,25 €
Executed amount
: 316326,58 €,316 326,58 €
Percentage of investment
: 0,21 %0,21 %
Municipality
Aljezur
:Approved amount
: 1026791,29 €,1 026 791,29 €
Executed amount
: 996907,10 €,996 907,10 €
Percentage of investment
: 0,66 %0,66 %
Municipality
Castro Marim
:Approved amount
: 1822999,33 €,1 822 999,33 €
Executed amount
: 1787138,30 €,1 787 138,30 €
Percentage of investment
: 1,17 %1,17 %
Municipality
Faro
:Approved amount
: 15967633,78 €,15 967 633,78 €
Executed amount
: 15543278,30 €,15 543 278,30 €
Percentage of investment
: 10,25 %10,25 %
Municipality
Lagoa
:Approved amount
: 9895170,02 €,9 895 170,02 €
Executed amount
: 9739772,23 €,9 739 772,23 €
Percentage of investment
: 6,35 %6,35 %
Municipality
Lagos
:Approved amount
: 15738233,42 €,15 738 233,42 €
Executed amount
: 15475252,56 €,15 475 252,56 €
Percentage of investment
: 10,11 %10,11 %
Municipality
Loulé
:Approved amount
: 26012718,77 €,26 012 718,77 €
Executed amount
: 25410846,02 €,25 410 846,02 €
Percentage of investment
: 16,7 %16,70 %
Municipality
Monchique
:Approved amount
: 715703,20 €,715 703,20 €
Executed amount
: 685819,01 €,685 819,01 €
Percentage of investment
: 0,46 %0,46 %
Municipality
Olhão
:Approved amount
: 5349368,76 €,5 349 368,76 €
Executed amount
: 5020642,68 €,5 020 642,68 €
Percentage of investment
: 3,44 %3,44 %
Municipality
Portimão
:Approved amount
: 17023508,65 €,17 023 508,65 €
Executed amount
: 16569268,98 €,16 569 268,98 €
Percentage of investment
: 10,93 %10,93 %
Municipality
São Brás de Alportel
:Approved amount
: 1829414,31 €,1 829 414,31 €
Executed amount
: 1745738,58 €,1 745 738,58 €
Percentage of investment
: 1,17 %1,17 %
Municipality
Silves
:Approved amount
: 8392299,19 €,8 392 299,19 €
Executed amount
: 8147248,84 €,8 147 248,84 €
Percentage of investment
: 5,39 %5,39 %
Municipality
Tavira
:Approved amount
: 5650889,67 €,5 650 889,67 €
Executed amount
: 5471584,54 €,5 471 584,54 €
Percentage of investment
: 3,63 %3,63 %
Municipality
Vila do Bispo
:Approved amount
: 3889034,12 €,3 889 034,12 €
Executed amount
: 3865126,77 €,3 865 126,77 €
Percentage of investment
: 2,5 %2,50 %
Municipality
Vila Real de Santo António
:Approved amount
: 4116502,80 €,4 116 502,80 €
Executed amount
: 3955128,18 €,3 955 128,18 €
Percentage of investment
: 2,64 %2,64 %
Total
Approved amount
: 155729958,22 €,155 729 958,22 €
Executed amount
: 152348855,91 €,152 348 855,91 €
Percentage of investment
Region
Autonomous Region of the Azores
:Sub-region
Autonomous Region of the Azores
:Municipality
Angra do Heroísmo
:Approved amount
: 12727280,64 €,12 727 280,64 €
Executed amount
: 12430981,06 €,12 430 981,06 €
Percentage of investment
: 9,53 %9,53 %
Municipality
Calheta
:Approved amount
: 1404009,03 €,1 404 009,03 €
Executed amount
: 1337921,15 €,1 337 921,15 €
Percentage of investment
: 1,05 %1,05 %
Municipality
Corvo
:Approved amount
: 102315,59 €,102 315,59 €
Executed amount
: 102315,59 €,102 315,59 €
Percentage of investment
: 0,08 %0,08 %
Municipality
Horta
:Approved amount
: 3787642,41 €,3 787 642,41 €
Executed amount
: 3787642,41 €,3 787 642,41 €
Percentage of investment
: 2,84 %2,84 %
Municipality
Lagoa
:Approved amount
: 5207785,04 €,5 207 785,04 €
Executed amount
: 5071571,47 €,5 071 571,47 €
Percentage of investment
: 3,9 %3,90 %
Municipality
Lajes das Flores
:Approved amount
: 737841,47 €,737 841,47 €
Executed amount
: 737841,47 €,737 841,47 €
Percentage of investment
: 0,55 %0,55 %
Municipality
Lajes do Pico
:Approved amount
: 1150689,49 €,1 150 689,49 €
Executed amount
: 1150689,49 €,1 150 689,49 €
Percentage of investment
: 0,86 %0,86 %
Municipality
Madalena
:Approved amount
: 2596397,76 €,2 596 397,76 €
Executed amount
: 2588897,76 €,2 588 897,76 €
Percentage of investment
: 1,94 %1,94 %
Municipality
Nordeste
:Approved amount
: 2315217,53 €,2 315 217,53 €
Executed amount
: 2282586,30 €,2 282 586,30 €
Percentage of investment
: 1,73 %1,73 %
Municipality
Ponta Delgada
:Approved amount
: 39728235,44 €,39 728 235,44 €
Executed amount
: 38000796,55 €,38 000 796,55 €
Percentage of investment
: 29,74 %29,74 %
Municipality
Povoação
:Approved amount
: 3794767,52 €,3 794 767,52 €
Executed amount
: 3745820,68 €,3 745 820,68 €
Percentage of investment
: 2,84 %2,84 %
Municipality
Praia da Vitória
:Approved amount
: 5148613,44 €,5 148 613,44 €
Executed amount
: 4985457,28 €,4 985 457,28 €
Percentage of investment
: 3,85 %3,85 %
Municipality
Ribeira Grande
:Approved amount
: 9992828,41 €,9 992 828,41 €
Executed amount
: 9715462,95 €,9 715 462,95 €
Percentage of investment
: 7,48 %7,48 %
Municipality
Santa Cruz da Graciosa
:Approved amount
: 1417064,58 €,1 417 064,58 €
Executed amount
: 1410971,68 €,1 410 971,68 €
Percentage of investment
: 1,06 %1,06 %
Municipality
Santa Cruz das Flores
:Approved amount
: 670300,01 €,670 300,01 €
Executed amount
: 670300,01 €,670 300,01 €
Percentage of investment
: 0,5 %0,50 %
Municipality
São Roque do Pico
:Approved amount
: 1383452,87 €,1 383 452,87 €
Executed amount
: 1383452,87 €,1 383 452,87 €
Percentage of investment
: 1,04 %1,04 %
Municipality
Velas
:Approved amount
: 2373429,14 €,2 373 429,14 €
Executed amount
: 1939152,41 €,1 939 152,41 €
Percentage of investment
: 1,78 %1,78 %
Municipality
Vila do Porto
:Approved amount
: 2114505,34 €,2 114 505,34 €
Executed amount
: 2071527,79 €,2 071 527,79 €
Percentage of investment
: 1,58 %1,58 %
Municipality
Vila Franca do Campo
:Approved amount
: 3372479,20 €,3 372 479,20 €
Executed amount
: 3274585,51 €,3 274 585,51 €
Percentage of investment
: 2,52 %2,52 %
Municipality
Nation-wide investment
:Approved amount
: 33565568,99 €,33 565 568,99 €
Executed amount
: 32861657,68 €,32 861 657,68 €
Percentage of investment
: 25,13 %25,13 %
Total
Approved amount
: 133590423,91 €,133 590 423,91 €
Executed amount
: 129549632,10 €,129 549 632,10 €
Percentage of investment
Region
Autonomous Region of Madeira
:Sub-region
Autonomous Region of Madeira
:Municipality
Calheta
:Approved amount
: 3218828,20 €,3 218 828,20 €
Executed amount
: 3205024,84 €,3 205 024,84 €
Percentage of investment
: 3,55 %3,55 %
Municipality
Câmara de Lobos
:Approved amount
: 6456605,74 €,6 456 605,74 €
Executed amount
: 5913059,98 €,5 913 059,98 €
Percentage of investment
: 7,12 %7,12 %
Municipality
Funchal
:Approved amount
: 55052893,33 €,55 052 893,33 €
Executed amount
: 53713544,76 €,53 713 544,76 €
Percentage of investment
: 60,7 %60,70 %
Municipality
Machico
:Approved amount
: 5359151,62 €,5 359 151,62 €
Executed amount
: 5313003,52 €,5 313 003,52 €
Percentage of investment
: 5,91 %5,91 %
Municipality
Ponta do Sol
:Approved amount
: 1628858,43 €,1 628 858,43 €
Executed amount
: 1611152,47 €,1 611 152,47 €
Percentage of investment
: 1,8 %1,80 %
Municipality
Porto Moniz
:Approved amount
: 1180239,76 €,1 180 239,76 €
Executed amount
: 1160544,91 €,1 160 544,91 €
Percentage of investment
: 1,3 %1,30 %
Municipality
Porto Santo
:Approved amount
: 1703711,59 €,1 703 711,59 €
Executed amount
: 1703280,54 €,1 703 280,54 €
Percentage of investment
: 1,88 %1,88 %
Municipality
Ribeira Brava
:Approved amount
: 3456357,91 €,3 456 357,91 €
Executed amount
: 3397313,26 €,3 397 313,26 €
Percentage of investment
: 3,81 %3,81 %
Municipality
Santa Cruz
:Approved amount
: 9593045,97 €,9 593 045,97 €
Executed amount
: 9342058,45 €,9 342 058,45 €
Percentage of investment
: 10,58 %10,58 %
Municipality
Santana
:Approved amount
: 1526705,61 €,1 526 705,61 €
Executed amount
: 1476062,45 €,1 476 062,45 €
Percentage of investment
: 1,68 %1,68 %
Municipality
São Vicente
:Approved amount
: 1515739,90 €,1 515 739,90 €
Executed amount
: 1448932,77 €,1 448 932,77 €
Percentage of investment
: 1,67 %1,67 %
Total
Approved amount
: 90692138,06 €,90 692 138,06 €
Executed amount
: 88283977,94 €,88 283 977,94 €
Percentage of investment
The execution amount of each project per municipality is calculated assuming that the project execution speed is the same in all the municipalities concerned.
Main beneficiaries
DIRECÇÃO GERAL DA SAUDE
INSTITUTO DO EMPREGO E FORMAÇÃO PROFISSIONAL, I.P.
INSTITUTO DE GESTÃO FINANCEIRA DA EDUCAÇÃO, I.P.
FUNDO REGIONAL DO EMPREGO
INSTITUTO DE EMPREGO DA MADEIRA, IP-RAM
75 237
Total beneficiaries
Main projects
COVID-19: Vacinação e Tratamento
Recuperação e consolidação de aprendizagens
ATIVAR.PT Estágio
ATIVAR.PT Estágio
Recuperação e consolidação de aprendizagens
100 612
Total projects