Barometer
Discover with clarity and detail the main data and status of the application of European Funds in the country through Portugal 2030.
Portugal 2030 in a minute
Percentage of funding approved for investment in implementing projects This indicator is known as the commitment rate. In order to ensure full use of available funds, higher amounts than those available may be approved as a way to anticipate projects that do not use all the amounts allocated to them.
, 17,2 %,Percentage of funding already used to implement projects This indicator is known as the execution rate.
, 4 %,Days left until the end of the Portugal 2030 implementation period
European Regional Development Fund
Percentage of funding approved for investment in implementing projects This indicator is known as the commitment rate. In order to ensure full use of available funds, higher amounts than those available may be approved as a way to anticipate projects that do not use all the amounts allocated to them.
, 7,6 %,Percentage of the amount executed compared to the amount approved for the ERDF This indicator is known as the realization rate.
, 9,4 %,Percentage of funding spent on implementing projects This indicator is known as the execution rate.
, 0,7 %,Distribution of European Regional Development Fund
Strategic objective
+ Smart
Approved amount
604,3 million €
Executed amount
7,8 thousand €
Amount executed compared to the amount approved
Strategic objective
+ Green
Approved amount
36,5 million €
Executed amount
1,6 million €
Amount executed compared to the amount approved
Strategic objective
+ Connected
Approved amount
58,1 million €
Executed amount
58,1 million €
Amount executed compared to the amount approved
Strategic objective
+ Social
Approved amount
33,5 million €
Executed amount
461,2 thousand €
Amount executed compared to the amount approved
Strategic objective
+ Proximo
Approved amount
31,7 million €
Executed amount
2,1 million €
Amount executed compared to the amount approved
Measure Financial complement that serves as technical support for each of the programmes.
Technical assistance
Approved amount
113 million €
Executed amount
20,1 million €
Amount executed compared to the amount approved
European Regional Development Fund
Amount | |
---|---|
Programmed amount | 11496728210,00 € 11 496 728 210,00 € |
Approved amount | 877096663,44 € 877 096 663,44 € |
Executed amount | 82394145,20 € 82 394 145,20 € |
Percentage of funding approved for investment in implementing projects | 7,63 % 7,63 % |
Percentage of funding spent on implementing projects | 0,72 % 0,72 % |
Percentage of the amount executed compared to the amount approved for the ERDF | 9,39 % 9,39 % |
Programmed amount
11496728210,00 €
11 496 728 210,00 €
Approved amount
877096663,44 €
877 096 663,44 €
Executed amount
82394145,20 €
82 394 145,20 €
Percentage of funding approved for investment in implementing projects
7,63 % 7,63 %
Percentage of funding spent on implementing projects
0,72 % 0,72 %
Percentage of the amount executed compared to the amount approved for the ERDF
9,39 % 9,39 %
Distribution of European Regional Development Fund
Strategic objective
+ Smart
Approved amount
604,3 million €
Executed amount
7,8 thousand €
Amount executed compared to the amount approved
Strategic objective
+ Green
Approved amount
36,5 million €
Executed amount
1,6 million €
Amount executed compared to the amount approved
Strategic objective
+ Connected
Approved amount
58,1 million €
Executed amount
58,1 million €
Amount executed compared to the amount approved
Strategic objective
+ Social
Approved amount
33,5 million €
Executed amount
461,2 thousand €
Amount executed compared to the amount approved
Strategic objective
+ Proximo
Approved amount
31,7 million €
Executed amount
2,1 million €
Amount executed compared to the amount approved
Measure Financial complement that serves as technical support for each of the programmes.
Technical assistance
Approved amount
113 million €
Executed amount
20,1 million €
Amount executed compared to the amount approved
Fundo Social Europeu Mais
Percentage of funding approved for investment in implementing projects This indicator is known as the commitment rate. In order to ensure full use of available funds, higher amounts than those available may be approved as a way to anticipate projects that do not use all the amounts allocated to them.
, 28,7 %,Percentage of the amount executed compared to the amount approved for the FSE+ This indicator is known as the realization rate.
, 36,1 %,Percentage of funding spent on implementing projects This indicator is known as the execution rate.
, 10,3 %,Distribution of Fundo Social Europeu Mais
Strategic objective
+ Social
Approved amount
2,2 billion €
Executed amount
792,9 million €
Amount executed compared to the amount approved
Measure Financial complement that serves as technical support for each of the programmes.
Technical assistance
Approved amount
66,5 million €
Executed amount
12 million €
Amount executed compared to the amount approved
Fundo Social Europeu Mais
Amount | |
---|---|
Programmed amount | 7776520960,00 € 7 776 520 960,00 € |
Approved amount | 2230330404,87 € 2 230 330 404,87 € |
Executed amount | 804852350,61 € 804 852 350,61 € |
Percentage of funding approved for investment in implementing projects | 28,68 % 28,68 % |
Percentage of funding spent on implementing projects | 10,35 % 10,35 % |
Percentage of the amount executed compared to the amount approved for the FSE+ | 36,09 % 36,09 % |
Programmed amount
7776520960,00 €
7 776 520 960,00 €
Approved amount
2230330404,87 €
2 230 330 404,87 €
Executed amount
804852350,61 €
804 852 350,61 €
Percentage of funding approved for investment in implementing projects
28,68 % 28,68 %
Percentage of funding spent on implementing projects
10,35 % 10,35 %
Percentage of the amount executed compared to the amount approved for the FSE+
36,09 % 36,09 %
Distribution of Fundo Social Europeu Mais
Strategic objective
+ Social
Approved amount
2,2 billion €
Executed amount
792,9 million €
Amount executed compared to the amount approved
Measure Financial complement that serves as technical support for each of the programmes.
Technical assistance
Approved amount
66,5 million €
Executed amount
12 million €
Amount executed compared to the amount approved
Cohesion Fund
Percentage of funding approved for investment in implementing projects This indicator is known as the commitment rate. In order to ensure full use of available funds, higher amounts than those available may be approved as a way to anticipate projects that do not use all the amounts allocated to them.
, 26,1 %,Percentage of the amount executed compared to the amount approved for the CF This indicator is known as the realization rate.
, 3,4 %,Percentage of funding spent on implementing projects This indicator is known as the execution rate.
, 0,9 %,Distribution of Cohesion Fund
Strategic objective
+ Green
Approved amount
500,1 million €
Executed amount
25 million €
Amount executed compared to the amount approved
Strategic objective
+ Connected
Approved amount
287,3 million €
Executed amount
0 €
Amount executed compared to the amount approved
Measure Financial complement that serves as technical support for each of the programmes.
Technical assistance
Approved amount
22,5 million €
Executed amount
2,3 million €
Amount executed compared to the amount approved
Cohesion Fund
Amount | |
---|---|
Programmed amount | 3105340566,00 € 3 105 340 566,00 € |
Approved amount | 809877855,38 € 809 877 855,38 € |
Executed amount | 27325351,26 € 27 325 351,26 € |
Percentage of funding approved for investment in implementing projects | 26,08 % 26,08 % |
Percentage of funding spent on implementing projects | 0,88 % 0,88 % |
Percentage of the amount executed compared to the amount approved for the CF | 3,37 % 3,37 % |
Programmed amount
3105340566,00 €
3 105 340 566,00 €
Approved amount
809877855,38 €
809 877 855,38 €
Executed amount
27325351,26 €
27 325 351,26 €
Percentage of funding approved for investment in implementing projects
26,08 % 26,08 %
Percentage of funding spent on implementing projects
0,88 % 0,88 %
Percentage of the amount executed compared to the amount approved for the CF
3,37 % 3,37 %
Distribution of Cohesion Fund
Strategic objective
+ Green
Approved amount
500,1 million €
Executed amount
25 million €
Amount executed compared to the amount approved
Strategic objective
+ Connected
Approved amount
287,3 million €
Executed amount
0 €
Amount executed compared to the amount approved
Measure Financial complement that serves as technical support for each of the programmes.
Technical assistance
Approved amount
22,5 million €
Executed amount
2,3 million €
Amount executed compared to the amount approved
Fundo para uma Transição Justa
Percentage of funding approved for investment in implementing projects This indicator is known as the commitment rate. In order to ensure full use of available funds, higher amounts than those available may be approved as a way to anticipate projects that do not use all the amounts allocated to them.
, 19,9 %,Percentage of the amount executed compared to the amount approved for the FTJ This indicator is known as the realization rate.
, 0 %,Percentage of funding spent on implementing projects This indicator is known as the execution rate.
, 0 %,Distribution of Fundo para uma Transição Justa
Strategic objective
+ Just Transition
Approved amount
44,5 million €
Executed amount
0 €
Amount executed compared to the amount approved
Fundo para uma Transição Justa
Amount | |
---|---|
Programmed amount | 223839015,00 € 223 839 015,00 € |
Approved amount | 44532056,60 € 44 532 056,60 € |
Executed amount | 0,00 € 0,00 € |
Percentage of funding approved for investment in implementing projects | 19,89 % 19,89 % |
Percentage of funding spent on implementing projects | 0 % 0,00 % |
Percentage of the amount executed compared to the amount approved for the FTJ | 0 % 0,00 % |
Programmed amount
223839015,00 €
223 839 015,00 €
Approved amount
44532056,60 €
44 532 056,60 €
Executed amount
0,00 €
0,00 €
Percentage of funding approved for investment in implementing projects
19,89 % 19,89 %
Percentage of funding spent on implementing projects
0 % 0,00 %
Percentage of the amount executed compared to the amount approved for the FTJ
0 % 0,00 %
Distribution of Fundo para uma Transição Justa
Strategic objective
+ Just Transition
Approved amount
44,5 million €
Executed amount
0 €
Amount executed compared to the amount approved
Investments by strategic objectives and programs
Investment values by strategic objectives
Investment values by strategic objectives
Strategic Objective | Specific Objective | Approved amount | Executed amount |
---|---|---|---|
+ Smart |
Research and innovation
|
148784704,25 €
148 784 704,25 €
|
0,00 €
0,00 €
|
SME growth and competitiveness
|
454659657,18 €
454 659 657,18 €
|
7795,98 €
7 795,98 €
|
|
Smart specialisation
|
902853,39 €
902 853,39 €
|
0,00 €
0,00 €
|
|
Total
|
604347214,82 €
604 347 214,82 €
|
7795,98 €
7 795,98 €
|
|
+ Green |
Climate change adjustment
|
63183155,65 €
63 183 155,65 €
|
0,00 €
0,00 €
|
Circular economy
|
8132552,07 €
8 132 552,07 €
|
0,00 €
0,00 €
|
|
Nature and biodiversity protection
|
17692689,42 €
17 692 689,42 €
|
1624296,23 €
1 624 296,23 €
|
|
Sustainable urban mobility
|
447554732,52 €
447 554 732,52 €
|
25001649,66 €
25 001 649,66 €
|
|
Total
|
536563129,66 €
536 563 129,66 €
|
26625945,89 €
26 625 945,89 €
|
|
+ Connected |
Trans-European transport network
|
287258698,65 €
287 258 698,65 €
|
0,00 €
0,00 €
|
National Transport Network
|
58104369,00 €
58 104 369,00 €
|
58104369,01 €
58 104 369,01 €
|
|
Total
|
345363067,65 €
345 363 067,65 €
|
58104369,01 €
58 104 369,01 €
|
|
+ Social |
Access to employment
|
278488487,02 €
278 488 487,02 €
|
83118024,62 €
83 118 024,62 €
|
Access to quality services
|
486107855,71 €
486 107 855,71 €
|
334844701,49 €
334 844 701,49 €
|
|
Tackling material deprivation
|
89597081,86 €
89 597 081,86 €
|
0,00 €
0,00 €
|
|
Adapting workers to change
|
27541579,02 €
27 541 579,02 €
|
0,00 €
0,00 €
|
|
Access to education and training
|
784675637,88 €
784 675 637,88 €
|
339907518,35 €
339 907 518,35 €
|
|
Lifelong learning
|
368102434,88 €
368 102 434,88 €
|
16618302,88 €
16 618 302,88 €
|
|
Active inclusion and employability
|
129303481,15 €
129 303 481,15 €
|
18413667,34 €
18 413 667,34 €
|
|
Access to healthcare
|
30500000,00 €
30 500 000,00 €
|
0,00 €
0,00 €
|
|
Cultura e turismo sustentáveis
|
2978749,97 €
2 978 749,97 €
|
461169,06 €
461 169,06 €
|
|
Total
|
2197295307,49 €
2 197 295 307,49 €
|
793363383,74 €
793 363 383,74 €
|
|
+ Proximo |
Integrated development in urban areas
|
25548459,51 €
25 548 459,51 €
|
2090549,10 €
2 090 549,10 €
|
Desenvolvimento integrado nas zonas não urbanas
|
6114841,93 €
6 114 841,93 €
|
0,00 €
0,00 €
|
|
Total
|
31663301,44 €
31 663 301,44 €
|
2090549,10 €
2 090 549,10 €
|
|
Technical assistance |
Technical Assistance
|
202072902,63 €
202 072 902,63 €
|
34379803,36 €
34 379 803,36 €
|
Total
|
202072902,63 €
202 072 902,63 €
|
34379803,36 €
34 379 803,36 €
|
|
+ Just Transition |
Just Transition funding
|
44532056,60 €
44 532 056,60 €
|
0,00 €
0,00 €
|
Total
|
44532056,60 €
44 532 056,60 €
|
0 €
0,00 €
|
|
Total | 3961836980,29 € 3 961 836 980,29 € | 914571847,07 € 914 571 847,07 € |
Strategic Objective
+ Smart
:Specific Objective
Research and innovation
:Approved amount
148784704,25 €148 784 704,25 €
Executed amount
0,00 €0,00 €
Specific Objective
SME growth and competitiveness
:Approved amount
454659657,18 €454 659 657,18 €
Executed amount
7795,98 €7 795,98 €
Specific Objective
Smart specialisation
:Approved amount
902853,39 €902 853,39 €
Executed amount
0,00 €0,00 €
Total
Approved amount
604347214,82 €604 347 214,82 €
Executed amount
7795,98 €7 795,98 €
Strategic Objective
+ Green
:Specific Objective
Climate change adjustment
:Approved amount
63183155,65 €63 183 155,65 €
Executed amount
0,00 €0,00 €
Specific Objective
Circular economy
:Approved amount
8132552,07 €8 132 552,07 €
Executed amount
0,00 €0,00 €
Specific Objective
Nature and biodiversity protection
:Approved amount
17692689,42 €17 692 689,42 €
Executed amount
1624296,23 €1 624 296,23 €
Specific Objective
Sustainable urban mobility
:Approved amount
447554732,52 €447 554 732,52 €
Executed amount
25001649,66 €25 001 649,66 €
Total
Approved amount
536563129,66 €536 563 129,66 €
Executed amount
26625945,89 €26 625 945,89 €
Strategic Objective
+ Connected
:Specific Objective
Trans-European transport network
:Approved amount
287258698,65 €287 258 698,65 €
Executed amount
0,00 €0,00 €
Specific Objective
National Transport Network
:Approved amount
58104369,00 €58 104 369,00 €
Executed amount
58104369,01 €58 104 369,01 €
Total
Approved amount
345363067,65 €345 363 067,65 €
Executed amount
58104369,01 €58 104 369,01 €
Strategic Objective
+ Social
:Specific Objective
Access to employment
:Approved amount
278488487,02 €278 488 487,02 €
Executed amount
83118024,62 €83 118 024,62 €
Specific Objective
Access to quality services
:Approved amount
486107855,71 €486 107 855,71 €
Executed amount
334844701,49 €334 844 701,49 €
Specific Objective
Tackling material deprivation
:Approved amount
89597081,86 €89 597 081,86 €
Executed amount
0,00 €0,00 €
Specific Objective
Adapting workers to change
:Approved amount
27541579,02 €27 541 579,02 €
Executed amount
0,00 €0,00 €
Specific Objective
Access to education and training
:Approved amount
784675637,88 €784 675 637,88 €
Executed amount
339907518,35 €339 907 518,35 €
Specific Objective
Lifelong learning
:Approved amount
368102434,88 €368 102 434,88 €
Executed amount
16618302,88 €16 618 302,88 €
Specific Objective
Active inclusion and employability
:Approved amount
129303481,15 €129 303 481,15 €
Executed amount
18413667,34 €18 413 667,34 €
Specific Objective
Access to healthcare
:Approved amount
30500000,00 €30 500 000,00 €
Executed amount
0,00 €0,00 €
Specific Objective
Cultura e turismo sustentáveis
:Approved amount
2978749,97 €2 978 749,97 €
Executed amount
461169,06 €461 169,06 €
Total
Approved amount
2197295307,49 €2 197 295 307,49 €
Executed amount
793363383,74 €793 363 383,74 €
Strategic Objective
+ Proximo
:Specific Objective
Integrated development in urban areas
:Approved amount
25548459,51 €25 548 459,51 €
Executed amount
2090549,10 €2 090 549,10 €
Specific Objective
Desenvolvimento integrado nas zonas não urbanas
:Approved amount
6114841,93 €6 114 841,93 €
Executed amount
0,00 €0,00 €
Total
Approved amount
31663301,44 €31 663 301,44 €
Executed amount
2090549,10 €2 090 549,10 €
Strategic Objective
Technical assistance
:Specific Objective
Technical Assistance
:Approved amount
202072902,63 €202 072 902,63 €
Executed amount
34379803,36 €34 379 803,36 €
Total
Approved amount
202072902,63 €202 072 902,63 €
Executed amount
34379803,36 €34 379 803,36 €
Strategic Objective
+ Just Transition
:Specific Objective
Just Transition funding
:Approved amount
44532056,60 €44 532 056,60 €
Executed amount
0,00 €0,00 €
Total
Approved amount
44532056,60 €44 532 056,60 €
Executed amount
0,00 €0,00 €
Strategic Objective
TotalTotal
Approved amount
3961836980,29 €3 961 836 980,29 €
Executed amount
914571847,07 €914 571 847,07 €
Investment values by programs
Investment values by programs
Scope | Programme | Approved amount | Executed amount |
---|---|---|---|
Thematic |
Innovation and Digital Transition
|
434308104,31 €
434 308 104,31 €
|
1449344,40 €
1 449 344,40 €
|
Climate Action and Sustainability
|
809877855,38 €
809 877 855,38 €
|
27325351,26 €
27 325 351,26 €
|
|
Demographics, Qualifications and Inclusion
|
2031478426,83 €
2 031 478 426,83 €
|
766183152,77 €
766 183 152,77 €
|
|
Regionais |
North
|
90902427,81 €
90 902 427,81 €
|
8830811,51 €
8 830 811,51 €
|
Center
|
205280196,90 €
205 280 196,90 €
|
12465118,32 €
12 465 118,32 €
|
|
Lisboa
|
47846083,08 €
47 846 083,08 €
|
4184095,10 €
4 184 095,10 €
|
|
Alentejo
|
69394788,06 €
69 394 788,06 €
|
3492769,54 €
3 492 769,54 €
|
|
Algarve
|
53709330,88 €
53 709 330,88 €
|
1152107,02 €
1 152 107,02 €
|
|
Azores
|
85507779,58 €
85 507 779,58 €
|
58112164,99 €
58 112 164,99 €
|
|
Madeira
|
65875953,09 €
65 875 953,09 €
|
12720310,73 €
12 720 310,73 €
|
|
Technical Assistance |
Technical Assistance
|
67656034,37 €
67 656 034,37 €
|
18656621,42 €
18 656 621,42 €
|
Scope
Thematic
:Programme
Innovation and Digital Transition
:Approved amount
434308104,31 €434 308 104,31 €
Executed amount
1449344,40 €1 449 344,40 €
Programme
Climate Action and Sustainability
:Approved amount
809877855,38 €809 877 855,38 €
Executed amount
27325351,26 €27 325 351,26 €
Programme
Demographics, Qualifications and Inclusion
:Approved amount
2031478426,83 €2 031 478 426,83 €
Executed amount
766183152,77 €766 183 152,77 €
Scope
Regionais
:Programme
North
:Approved amount
90902427,81 €90 902 427,81 €
Executed amount
8830811,51 €8 830 811,51 €
Programme
Center
:Approved amount
205280196,90 €205 280 196,90 €
Executed amount
12465118,32 €12 465 118,32 €
Programme
Lisboa
:Approved amount
47846083,08 €47 846 083,08 €
Executed amount
4184095,10 €4 184 095,10 €
Programme
Alentejo
:Approved amount
69394788,06 €69 394 788,06 €
Executed amount
3492769,54 €3 492 769,54 €
Programme
Algarve
:Approved amount
53709330,88 €53 709 330,88 €
Executed amount
1152107,02 €1 152 107,02 €
Programme
Azores
:Approved amount
85507779,58 €85 507 779,58 €
Executed amount
58112164,99 €58 112 164,99 €
Programme
Madeira
:Approved amount
65875953,09 €65 875 953,09 €
Executed amount
12720310,73 €12 720 310,73 €
Scope
Technical Assistance
:Programme
Technical Assistance
:Approved amount
67656034,37 €67 656 034,37 €
Executed amount
18656621,42 €18 656 621,42 €
Top beneficiaries
INFRAESTRUTURAS DE PORTUGAL, S.A.
INSTITUTO DO EMPREGO E FORMAÇÃO PROFISSIONAL, I.P.
DIRECÇÃO-GERAL DO ENSINO SUPERIOR
FUNDAÇÃO PARA A CIÊNCIA E A TECNOLOGIA
METROPOLITANO DE LISBOA, E.P.E.
2 077
Total beneficiaries
Top projects
Linha do Alentejo: Duplicação Poceirão-Bombel
Formação Avançada - Bolsas de Doutoramento
Modernização da Linha de Vendas Novas
Quadruplicação da Linha Ferroviária do Minho, no troço Contumil - Ermesinde
Expansão do Sistema do Metropolitano de Lisboa - 2ªFase
4 144
Total projects
See PT2030 implementation in detail
You can consult in detail the PT2030 implementation reports provided by the Agency for Development and Cohesion.
Consult reports Consult reports