Project sheet

Name

ESTRUTURA RESIDENCIAL PARA PESSOAS IDOSAS;CENTRO DE DIA

Total project amount

116,12 thousand €

Amount paid

0 €

Non-refundable funding

116,12 thousand €

Loan funding

0 €

Start date

01.09.2025

Expected end date

28.02.2026

Dimension

Resilience

Component

Social Intervention

Investment

New Generation of Equipment and Social Intervention

Operation code

16/C03-i01/2025.PPRR-RE-C03-i01-16-000450

Summary

A operação aqui candidata corresponde ao apetrechamento do complexo da Casa dos Beirões no Ribatejo. A Associação Casa dos Beirões no Ribatejo tem em curso a edificação de um complexo social alargado a várias respostas sociais destinadas à população sénior. A concretização deste complexo é um sonho tornado realizado, e só possível com o apoio do PRR.A empreitada do complexo não contempla o fornecimento e instalação dos equipamentos de cozinha e lavandaria, por um lado porque não é uma componente da empreitada de obras (por isso mesmo dissociável) e quando fornecida e instalada na empreitada eleva substancialmente o custo. Assim, foi tomada a consideração de promover a contratação a empresas especialistas.A mesma opção é aplicada ao fornecimento do mobiliário, que aqui se candidata, em total respeito à listagem anexa ao Aviso. A oportunidade destes equipamentos serem financiados é extraordinária, porque permite concluir o Complexo Social dos Beirões no Ribatejo com maior segurança, dignidade e celeridade (entre a conclusão da obra e o início da atividade).

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

70,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

116,12 thousand €

Total amount of the project

Where was the money spent

By county

1 county financed .

  • Santarém 116,12 thousand € ,
Source EMRP
10.02.2026