CENTRO DE DIA;ESTRUTURA RESIDENCIAL PARA PESSOAS IDOSAS

Total project amount

334,07 thousand €

Amount paid

0 €

Non-refundable funding

334,07 thousand €

Loan funding

0 €

Start date

01.01.2026

Expected end date

30.06.2026

Dimension

Resilience

Component

Social Intervention

Investment

New Generation of Equipment and Social Intervention

Operation code

16/C03-i01/2025.PPRR-RE-C03-i01-16-000411

Summary

A Santa Casa da Misericórdia de Albufeira tem assinado o contrato de comparticipação financeira no âmbito do aviso n.º 02/C03-i01/2021 referente à candidatura de requalificação da Estrutura Residencial para Pessoas Idosas, pelo que vem submeter a presente candidatura, a fim de se poder adquirir o equipamento necessário para o seu apetrechamento.A candidatura teve como objetivo a requalificação e ampliação da Estrutura Residencial para Pessoas Idosas, ao abrigo do Programa de Recuperação e Resiliência, através do Programa de Requalificação e Alargamento da rede de equipamentos e respostas sociais, nomeadamente no que diz respeito ao reforço dos lugares nas respostas sociais dirigidas às pessoas idosas. Pretende-se, com esta intervenção, aumentar a capacidade instalada e, simultaneamente,melhorar as instalações já existentes. Trata-se da alteração e reorganização da compartimentação de interiores, de forma a promover o melhor funcionamento da resposta social existente e ainda, a ampliação do edifício, proporcionando, assim, o aumento de capacidade em 18 camas, com as condições necessárias aos utentes. Também será garantida uma adequada luminosidade e ventilação dos vários compartimentos, maior conforto térmico e consequentemente maior sustentabilidade energética. Com a ampliação a estrutura residencial terá capacidade para 78 utentes e será necessário proceder ao seu apetrechamento para que se possa iniciar o seu funcionamento em pleno, pelo que é necessário a realização de um investimento de valor significativo para a aquisição do equipamento adaptado à resposta social. Trata-se essencialmente da aquisição de mobiliário para os quartos, refeitórios, salas de estar, salas de atividades, gabinetes técnicos, sala de enfermagem, salas terapêuticas, sala do pessoal, entre outras, bem como a aquisição de equipamentos informáticos para os registos e monotorização dos utentes.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

80,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

334,07 thousand €

Total amount of the project

Where was the money spent

By county

1 county financed .

  • Albufeira 334,07 thousand € ,
Source EMRP