Name
CRECHETotal project amount
21,32 thousand €Amount paid
0 €Non-refundable funding
21,32 thousand €Loan funding
0 €Start date
11.09.2025Expected end date
11.02.2026Dimension
ResilienceComponent
Social InterventionInvestment
New Generation of Equipment and Social InterventionOperation code
16/C03-i01/2025.PPRR-RE-C03-i01-16-000268Summary
Na sequência da candidatura aprovada no âmbito do aviso 09-C03-i01-2023, que permitiu a reabilitação de um edifício municipal em Vila de Rei com vista à criação de uma resposta social de creche, a presente operação tem como finalidade complementar este investimento com a aquisição de equipamento móvel indispensável ao arranque e funcionamento pleno do novo equipamento social.A criação desta creche, com capacidade para acolher 40 crianças, visa responder à carência de oferta de estruturas de apoio à infância no concelho, contribuindo para a redução das desigualdades territoriais no acesso a serviços sociais, promovendo a coesão social e territorial. Esta resposta social é particularmente relevante em contextos de baixa densidade populacional, como é o caso de Vila de Rei, onde a fixação de famílias e a conciliação entre vida familiar e profissional dependem fortemente da existência de serviços de proximidade de qualidade.A fase de reabilitação do edifício está em fase final, sendo agora necessário dotar o espaço com equipamentos móveis adequados, incluindo mobiliário, utensílios, equipamentos pedagógicos, lúdicos e de apoio à alimentação, que permitam a entrada em funcionamento da creche de acordo com os requisitos legais e técnicos definidos pela Segurança Social.Assim, a presente candidatura, submetida ao abrigo do aviso 16-C03-i01-2025, tem por objetivo garantir a plena operacionalização do equipamento reabilitado, assegurando o cumprimento dos objetivos definidos na Componente C03 – Respostas Sociais do Plano de Recuperação e Resiliência (PRR), nomeadamente o aumento da cobertura da rede de creches e a promoção de respostas de qualidade no apoio à infância.
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
21,32 thousand €
Total amount of the project
Where was the money spent
By county
1 county financed .
-
Vila de Rei 21,32 thousand € ,