Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

ESTRUTURA RESIDENCIAL PARA PESSOAS IDOSAS

Total project amount

409,85 thousand €

Amount paid

122,95 thousand €

Non-refundable funding

409,85 thousand €

Loan funding

0 €

Start date

30.12.2025

Expected end date

30.06.2026

Dimension

Resilience

Component

Social Intervention

Investment

New Generation of Equipment and Social Intervention

Operation code

15/C03-i01/2025.PPRR-RE-C03-i01-15-000251

Summary

O edifício da Casa dos Pobres de Coimbra edificado em 2008, aloja atualmente 63 utentes, encontra-se a decorrer obras de ampliação e tem autorizado o aumento de capacidade para mais 52 utentes. Assim sendo, torna-se imperativo a realização de melhorias que permitam o aumento da qualidade dos espaços e dos serviços prestados, assim implica: 1. Remodelação e adaptação das infraestruturas de apoio ao serviço de refeições, nomeadamente o aumento da área da sala de refeições e a execução de uma copa limpa. Tal obra permite uma melhor mobilidade dos utentes com cada vez mais exigências de espaço físico; resultante desta ampliação, é exigível a execução de uma copa limpa de apoio. 2. Substituição das janelas existentes, vãos exteriores, por outras mais eficientes de classe energética (A+). Refere-se que as atuais janelas exteriores, pela sua qualidade, idade e tempo de utilização, requerem custos energéticos muito altos no tratamento térmico do espaço, bem como não garantem total segurança aos utentes. 3. Remodelação da cobertura existente por outra em painel de chapa sandwich. Refere-se que a atual cobertura e seu sistema de impermeabilização e corte térmico encontra-se degradado, promovendo infiltrações por degradação dos materiais de impermeabilização. O painel sandwich proposto com núcleo em lã de rocha de 80mm, é um material de base natural, com resistência ao fogo.Objetivo Geral: Remodelar e adaptar as infraestruturas existentes para aumento da qualidade dos serviços prestados tornando-se o edifício mais eficientes energeticamente.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

100,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

409,85 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 30 %,

Where was the money spent

By county

1 county financed .

  • Coimbra 409,85 thousand € ,
Source EMRP