PRR Project
ESTRUTURA RESIDENCIAL PARA PESSOAS IDOSAS
Project sheet
Name
ESTRUTURA RESIDENCIAL PARA PESSOAS IDOSASTotal project amount
119,99 thousand €Amount paid
36 thousand €Non-refundable funding
119,99 thousand €Loan funding
0 €Start date
03.02.2026Expected end date
26.06.2026Dimension
ResilienceComponent
Social InterventionInvestment
New Generation of Equipment and Social InterventionOperation code
15/C03-i01/2025.PPRR-RE-C03-i01-15-000242Summary
A Santa Casa da Misericórdia da Pampilhosa da Serra apresenta esta candidatura com o objetivo de requalificar as infraestruturas da sua Estrutura Residencial para Pessoas Idosas - ERPI Foz da Moura, localizada na Rua Rangel de Lima 12, 3320-229 Pampilhosa da Serra, no edifício onde se encontra também instalada a Unidade de Cuidados Continuados Integrados (UCCI), respondendo às exigências técnicas e funcionais previstas no âmbito do investimento RE-C03-i01 do Plano de Recuperação e Resiliência.Esta intervenção visa melhorar a eficiência energética e funcionalidade dos espaços, com especial enfoque nas áreas técnicas (climatização, produção de águas quentes sanitárias e iluminação), contribuindo para a redução dos custos de operação e para o aumento do conforto térmico dos utentes e profissionais. A necessidade de intervenção decorre da existência de sistemas obsoletos, com elevado consumo energético, bem como de uma iluminação interior ineficiente, como comprovado no certificado energético atualizado (classe C, com consumos anuais estimados de 524.109 kWh e emissões de 137,9 toneladas de CO2/ano).O projeto contempla a instalação de um sistema solar fotovoltaico para autoconsumo, a substituição integral da iluminação interior por tecnologia LED, e a renovação do sistema de climatização com recurso a bomba de calor de elevada eficiência. Estas ações encontram-se detalhadas no projeto técnico e inserem-se plenamente nas tipologias de intervenção elegíveis no presente aviso (alínea a) do ponto 4.2 e alíneas c) e d) do ponto 4.3).O objetivo geral do projeto consiste em assegurar a modernização e sustentabilidade da resposta social ERPI Foz da Moura, promovendo a sua resiliência funcional e energética, com impactos positivos ao nível da qualidade dos cuidados prestados, da redução da pegada ambiental e da melhoria das condições de trabalho das equipas técnicas.
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
119,99 thousand €
Total amount of the project
Percentage of the amount already paid for implementing projects
, 30 %,Where was the money spent
By county
1 county financed .
-
Pampilhosa da Serra 119,99 thousand € ,