PRR Project
ESTRUTURA RESIDENCIAL PARA PESSOAS IDOSAS
Project sheet
Name
ESTRUTURA RESIDENCIAL PARA PESSOAS IDOSASTotal project amount
350,68 thousand €Amount paid
105,2 thousand €Non-refundable funding
350,68 thousand €Loan funding
0 €Start date
30.09.2025Expected end date
30.06.2026Dimension
ResilienceComponent
Social InterventionInvestment
New Generation of Equipment and Social InterventionOperation code
15/C03-i01/2025.PPRR-RE-C03-i01-15-000078Summary
A Misericórdia da Trofa tem em funcionamento o Lar Imaculada Conceição que foi construído com financiamento da Medida 6.12 do POPH com data de TA de 16.6.2010 e Conta Final de obra de Julho de 2014.Ao longo dos anos decorridos foram realizadas intervenções que visaram a melhoria contínua de espaços, materiais e equipamentos entre os quais se destacam a remodelação de cozinha, de WC’s e intervenção no sistema de AVAC. Estas intervenções decorreram no período de elegibilidade do presente aviso, ou seja, após 1 de Fevereiro de 2020 e constam discriminadas em MQT, Orçamentos, Autos, facturas, comprovativos de pagamento, etc, constantes em “Documentos”. Estas intervenções integram um conjunto de outras obras. Porém, para efeitos da presente candidatura, houve a preocupação de considerar apenas e só as despesas das intervenções elegíveis para financiamento público no âmbito do presente aviso.Com a presente candidatura pretende-se ainda incluir outros novas intervenções, a saber: Substituição integral da cobertura do edifício em apreço; Substituição de portas corta-fogo e sistemas adicionais de segurança com a instalação de grupo de emergência (gerador); Substituição e apetrechamento de equipamentos hoteleiros instalados e a instalar na cozinha, anteriormente, remodelada.Esta candidatura permitirá a execução das obras urgentes e necessárias e que garantem a melhoria/eficiência dos serviços prestados com consequência na elevação dos padrões de qualidade de vida dos 60 residentes, ao nível da segurança e conforto e, também, no que diz respeito à eficiência dos equipamentos ao nível dos consumos e rentabilidade/ produtividade. Esta resposta social situa-se num território com taxa de cobertura de cooperação (TCCSC) reduzida (91,5). Refira-se que obteve parecer do CLAS em 2009, data de formalização da candidatura acima referida.
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
350,68 thousand €
Total amount of the project
Percentage of the amount already paid for implementing projects
, 30 %,Where was the money spent
By county
1 county financed .
-
Trofa 350,68 thousand € ,