Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Veículo Elétrico Ligeiro Passageiros Transformação

Total project amount

25 thousand €

Amount paid

17,5 thousand €

Non-refundable funding

25 thousand €

Loan funding

0 €

Start date

01.04.2025

Expected end date

30.09.2025

Dimension

Resilience

Component

Social Intervention

Investment

New Generation of Equipment and Social Intervention

Operation code

14/C03-i01/2025.PPRR-RE-C03-i01-14-000239

Summary

A Santa Casa da Misericórdia de Vila Verde (SCMVV) tem pautado a sua atuação pelo princípio da solidariedade, não como um conceito abstrato, mas como um valor essencial que orienta todas as suas ações. Enquanto Instituição Particular de Solidariedade Social (IPSS), a SCMVV tem assumido, desde a sua fundação, um papel fundamental no apoio à comunidade, promovendo o bem-estar e a inclusão social.No entanto, a nossa missão vai além do apoio social. Num mundo em constante mudança, onde os desafios ambientais se tornam cada vez mais evidentes, a SCMVV assume também uma postura de responsabilidade ecológica. Conscientes do impacto ambiental e da necessidade de adotar práticas sustentáveis, estamos empenhados em reduzir a nossa pegada ecológica, promovendo soluções inovadoras e amigas do ambiente.Neste sentido, e como parte do nosso compromisso com a sustentabilidade, a SCMVV pretende adquirir veículos 100% elétricos. Esta iniciativa visa não só modernizar a frota da instituição, mas também contribuir para um futuro mais verde, reduzindo emissões poluentes e promovendo uma mobilidade sustentável.Com este passo, reafirmamos o nosso compromisso com a comunidade e com o planeta, demonstrando que é possível aliar a solidariedade à sustentabilidade. Porque cuidar do próximo também passa por cuidar do mundo que deixamos para as futuras gerações.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

100,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

25 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 70 %,

Where was the money spent

By county

1 county financed .

  • Vila Verde 25 thousand € ,
Source EMRP
10.02.2026