Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Administração Regional Autónoma

Total project amount

598,99 thousand €

Amount paid

119,8 thousand €

Non-refundable funding

598,99 thousand €

Loan funding

0 €

Start date

01.09.2025

Expected end date

30.09.2025

Dimension

Digital Transition

Component

Digital public administration

Investment

Digital transition of the Azorean public administration

Operation code

12/C19-i06-RAA/2023.P16

Summary

SIMA 11 - Monitorização Inteligente dos Fluxos Turísticos dos Açores - visa modernizar e capacitar a Direção Regional do Turismo e outras entidades públicas e privadas do setor turístico, utilizando tecnologias digitais inovadoras para uma gestão eficaz dos fluxos turísticos no arquipélago dos Açores. O aumento da atividade turística nos Açores trouxe desafios relacionados com a distribuição dos turistas, que podem sobrecarregar locais de interesse e comprometer a qualidade de vida dos residentes e a experiência dos visitantes.Para enfrentar esses desafios, o projeto utilizará ferramentas digitais e tecnologias inovadoras para analisar o perfil e a mobilidade dos visitantes nas nove ilhas dos Açores, apoiando a tomada de decisões fundamentadas e contribuindo para a sustentabilidade do território a longo prazo. As atividades previstas incluem a contratação de serviços de consultoria e desenvolvimento de uma plataforma digital inteligente, que permitirá monitorizar em tempo real os padrões de mobilidade, preferências e comportamentos dos turistas.A plataforma fornecerá uma interface para a comunidade local, turistas e empresas do setor, promovendo a dispersão dos fluxos turísticos e evitando a sobrelotação de alguns pontos de interesse. Além disso, a integração com outros sistemas de informação da Administração Pública Regional permitirá uma maior interoperabilidade entre diferentes áreas governamentais, otimizando a gestão dos recursos e dos custos operacionais.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

0,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

598,99 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 20 %,

Where was the money spent

By county

1 county financed .

  • Ponta Delgada 598,99 thousand € ,
Source EMRP
10.02.2026
All themes
Transparency without leading