Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Aquisição de veículos elétricos - Sousel

Total project amount

33,64 thousand €

Amount paid

23,55 thousand €

Non-refundable funding

33,64 thousand €

Loan funding

0 €

Start date

01.09.2025

Expected end date

30.11.2025

Dimension

Resilience

Component

Social Intervention

Investment

360° Accessibility

Operation code

12/C03-i02/2025.P18194

Summary

O Município de Sousel propõe-se a executar uma operação de aquisição de 15 veículos 100% elétricos novos, distribuídos pelas quatro freguesias do concelho (Sousel, Casa Branca, Cano e Santo Amaro), com o objetivo de reforçar a acessibilidade e mobilidade de pessoas com deficiência ou mobilidade condicionada, em especial nos centros históricos e espaços públicos.As ações incluem:- Aquisição e implementação de veículos elétricos, com as seguintes tipologias: - Cadeiras de rodas elétricas com comando elétrico;Os veículos obedecem aos códigos ISO definidos no aviso (ISO 9999:2022).- Distribuição estratégica dos veículos por freguesia, com base em critérios de: - Densidade populacional e número de idosos; - Existência de centros históricos e percursos públicos com barreiras de mobilidade; - Serviços de apoio social, centros de dia, espaços culturais e áreas de feiras e eventos locais.- Integração dos veículos em programas sociais e de mobilidade local, nomeadamente: - Apoio domiciliário, transporte de proximidade e acesso a equipamentos culturais e de saúde; - Apoio a eventos públicos e deslocações em centros históricos com declive acentuado.- Promoção da sustentabilidade ambiental e da mobilidade inclusiva: - Os veículos serão zero emissões; - As baterias e resíduos serão geridos de acordo com a legislação nacional.- Execução conforme contratação pública, com procedimentos iniciados após 1 de fevereiro de 2020, e enquadrados no Código dos Contratos Públicos.Este investimento permitirá um impacto social direto e mensurável, com melhoria do acesso físico, redução do isolamento e promoção da equidade territorial, estando alinhado com os objetivos do Aviso n.º 12/C03-i02/2025 - Programa de Intervenções em Vias Públicas (PIVP) - Aquisição de veículos elétricos e do Plano de Recuperação e Resiliência.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

100,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

33,64 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 70 %,

Where was the money spent

By county

1 county financed .

  • Sousel 33,64 thousand € ,
Source EMRP
10.02.2026
All themes
Transparency without leading