Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Veículo Elétrico até 7 lugares com Transformação

Total project amount

30 thousand €

Amount paid

21 thousand €

Non-refundable funding

30 thousand €

Loan funding

0 €

Start date

13.06.2025

Expected end date

13.03.2026

Dimension

Resilience

Component

Social Intervention

Investment

New Generation of Equipment and Social Intervention

Operation code

12/C03-i01/2024.PPRR-RE-C03-i01-12-000452

Summary

A Santa Casa da Misericórdia de Santiago do Cacém (SCM Santiago do Cacém), fundada em 1499, assume-se como uma IPSS, integrada na UMP. Orientada pelos princípios da doutrina e morais cristãs, tem como missão primordial satisfazer carências sociais e praticar atos de culto católico, sempre em conformidade com os seus estatutos.A Missão da entidade é assegurar cuidados de apoio social e de saúde individualizados, promovendo a autonomia e o bem-estar dos utentes, envolvendo famílias, profissionais, parceiros e a própria comunidade. A SCM Santiago do Cacém pretende oferecer à comunidade uma resposta social e de saúde de excelência, transmitindo credibilidade e qualidade nos serviços, promovendo a inclusão e a justiça social.A SCM Santiago do Cacém abrange uma diversidade de valências, demonstrando o seu compromisso com a comunidade local. Atualmente, a instituição oferece uma variedade de respostas, incluindo a UCCI São João de Deus, UCCI Conde Bracial, ERPI Residências do Pinhal, ERPI Santa Maria, Creche/Jardim de Infância Montinho, Creche Santa Teresinha, Creche/Jardim de Infância O Ninho e Serviço de Apoio Domiciliário.Considerando que temos 2 ERPI com um total de 196 utentes e centro de dia com acordo para 12, sentimos a necessidade de uma viatura adaptada para cadeira de rodas para deslocações com utentes com esta limitação, sobretudo quando têm consultas no exterior, assim como o transporte dos mesmos no serviço de centro de dia. Preocupamo-nos com o ambiente pelo que a aquisição de uma viatura elétrica será uma mais valia para além que será necessário a substituição de viaturas com elevado estado de desgaste e com muito consumo de combustível.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

100,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

30 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 70 %,

Where was the money spent

By county

1 county financed .

  • Santiago do Cacém 30 thousand € ,
Source EMRP
30.03.2026