Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Veículo Elétrico de 9 lugares com Transformação

Total project amount

40 thousand €

Amount paid

28 thousand €

Non-refundable funding

40 thousand €

Loan funding

0 €

Start date

10.03.2025

Expected end date

31.10.2025

Dimension

Resilience

Component

Social Intervention

Investment

New Generation of Equipment and Social Intervention

Operation code

12/C03-i01/2024.PPRR-RE-C03-i01-12-000421

Summary

FundamentaçãoA CERCIG, enquanto instituição dedicada à promoção da inclusão social e à melhoria da qualidade de vida de pessoas com deficiência, desempenha um papel crucial na comunidade. O Centro de Atividades e Capacitação para a Inclusão (CACI) é um dos serviços essenciais oferecidos pela CERCIG, proporcionando atividades de capacitação e inclusão que são fundamentais para o desenvolvimento pessoal e social dos seus utentes.A necessidade de uma viatura elétrica adaptada surge do compromisso da CERCIG com a sustentabilidade ambiental e a acessibilidade. A aquisição de um veículo elétrico não só reduz a pegada ecológica da instituição, alinhando-se com as metas ambientais do PRR, como também garante um transporte seguro e confortável para os utentes do CACI. Muitos destes utentes possuem mobilidade reduzida ou necessitam de apoio especializado para se deslocarem, e uma viatura adaptada para 9 lugares possibilita a participação em atividades comunitárias, terapias e outros eventos essenciais para a sua inclusão social.Além disso, o financiamento de uma viatura elétrica adaptada permitirá à CERCIG otimizar os seus recursos, reduzindo custos operacionais a longo prazo com a manutenção e combustíveis, e destinando mais verbas para o desenvolvimento de programas e serviços diretos aos utentes. Objetivo GeralAdquirir uma viatura elétrica adaptada para 9 lugares, visando promover a inclusão social e a acessibilidade das pessoas com deficiência atendidas pelo CACI da CERCIG, ao mesmo tempo que se contribui para a sustentabilidade ambiental, em consonância com os objetivos do Plano de Recuperação e Resiliência.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

90,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

40 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 70 %,

Where was the money spent

By county

1 county financed .

  • Guarda 40 thousand € ,
Source EMRP
10.02.2026
All themes