Project sheet

Name

Veículo Elétrico até 7 lugares com Transformação

Total project amount

30 thousand €

Amount paid

21 thousand €

Non-refundable funding

30 thousand €

Loan funding

0 €

Start date

17.03.2025

Expected end date

16.03.2026

Dimension

Resilience

Component

Social Intervention

Investment

New Generation of Equipment and Social Intervention

Operation code

12/C03-i01/2024.PPRR-RE-C03-i01-12-000238

Summary

A Casa do Povo de Alferce é uma IPSS , que se localiza no concelho de Monchique. Concelho este que se carateriza por um tecido socioeconómico desfavorável/ precário, baseado em baixas pensões de sobrevivência, fracas condições habitacionais, muitas destas sem as mínimas condições de salubridade/ habitabilidade; número de respostas sociais e as capacidades existentes reduzidas; deteriorização significativa e progressiva das condições socioeconómicas das famílias locais, agravado pela crise económica geral e das atividades locais em particular; desfragmentação das famílias, e/ou morte do cônjuge, registando assim, um aumento significativo e progressivo de pessoas a viver em isolamento total, agravado em muitos casos pelo isolamento geográfico e pela inexistência de rede de suporte familiar. Desta forma as duas respostas sociais que a instituição promove, nomeadamente o Centro de Dia e Serviço de Apoio Domiciliário são muitas vezes os únicos apoios que os utentes beneficiam, procurando assim minimizar o isolamento social. A frota da instituição atualmente apresenta-se insuficiente e obsoleta para as respetivas necessidades, sendo que o acréscimo de uma viatura de passageiros com mobilidade reduzida é uma mais valia para a promoção das diferentes atividades e serviços prestados, contribuindo para o apoio aos utentes e respeitando o ambiente e garantido a igualdade de oportunidades no acesso aos serviços.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

60,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

30 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 70 %,

Where was the money spent

By county

1 county financed .

  • Monchique 30 thousand € ,
Source EMRP