Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Melhoria da Acessibilidade ao Edifício “Consulta Externa III

Total project amount

9,69 thousand €

Amount paid

4,84 thousand €

Non-refundable funding

9,69 thousand €

Loan funding

0 €

Start date

24.09.2025

Expected end date

18.12.2025

Dimension

Resilience

Component

Social Intervention

Investment

360° Accessibility

Operation code

11/C03-i02/2025.P16057

Summary

O projeto de melhora de acessibilidades propõe duas soluções com vista a permitir o acesso seguro e acessível a todos os utilizadores. A instalação de uma pala/cobertura em policarbonato cristalino que permite a entrada da luz natural e estrutura em aço inox tornado a estrutura mais duradoura e fácil manutenção. Esta cobertura vai permitir que o acesso ao edifício seja feito de forma mais confortável e segura para todos os utilizadores em especial para os utentes com mobilidade reduzida que ficam protegidos das intempéries na entrada e saída das viaturas e ambulâncias uma vez que a cobertura vai proteger a área de carga e descarga de utentes.Colocação de duas portas, automáticas, deslizantes retas, em vidro, com sensores de aproximação de ambos os lados. Uma porta colocada na entrada externa do edifício, e outra porta colocada mais dentro do edifico permitindo criar entre ambas uma antecâmara reduzindo o impacto da abertura das portas no interior do edifico no que diz respeito à climatização e perda da energia do ar condicionado no ambiente. A colocação deste tipo de portas possibilitando maior vão útil de passagem, e a abertura por sensor de aproximação, permite que a entrada/saída dos utilizadores com mobilidade reduzida seja feita de forma autónoma e segura.Com estas ações de melhoria no acesso ao edifício serão criadas as condições de acesso necessárias, garantindo-se assim a mobilidade sem condicionamentos e faz-se cumprir com o disposto legislativo no que diz respeito ao Decreto-Lei n.º 163/2006, de 8 de agosto, e respetivas Normas Técnicas de Acessibilidade (NTA), nomeadamente, na promoção da acessibilidade como um elemento fundamental na qualidade de vida das pessoas, sendo um meio imprescindível para o exercício dos seus direitos.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

90,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

9,69 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 50 %,

Where was the money spent

By county

1 county financed .

  • Guimarães 9,69 thousand € ,
Source EMRP
10.02.2026
All themes