Name

Melhoria da Acessibilidade - Edifício da Câmara Municipal de Sátão

Total project amount

13 thousand €

Amount paid

6,5 thousand €

Non-refundable funding

13 thousand €

Loan funding

0 €

Start date

24.09.2024

Expected end date

18.12.2025

Dimension

Resilience

Component

Social Intervention

Investment

360° Accessibility

Operation code

11/C03-i02/2025.P15993

Summary

Para atender às normas NTA 2.5.7, 2.5.8 e 2.5.9, propõe-se a instalação de corrimãos duplos (0,75m e 0,90m) em ambos os lados da rampa, com prolongamento de 30cm no início e no fim. A porta dupla de acesso ao átrio principal será substituída por uma porta de correr automática com sensor, garantindo vedação térmica e acústica e uma largura útil superior a 0,87m. O mesmo tipo de porta será instalado no "Gabinete de Apoio ao Munícipe", correndo sobre a parede interna para permitir uma passagem útil superior a 0,77m.As portas automáticas serão de vidro laminado de segurança transparente (10mm) e contarão com marcas de segurança visíveis entre 1,20m e 1,50m do piso, conforme NTA 4.9.14. Propõe-se ainda o alargamento da abertura de atendimento na divisória de vidro temperado para uma altura entre 0,75m e 0,85m e uma largura mínima de 0,80m. O balcão existente será adaptado para atender às dimensões exigidas na NTA 2.12.As divisórias de vidro entre o átrio e o balcão de atendimento também receberão marcas de segurança conforme NTA 4.9.14. Além disso, o ressalto de 2cm no pavimento da porta de acesso ao Salão Nobre será chanfrado com inclinação máxima de 50%, conforme NTA 4.8.2.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

100,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

13 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 50 %,

Where was the money spent

By county

1 county financed .

  • Sátão 13 thousand € ,
Source EMRP