Information portal on various topics of management of public resources of the Portuguese State

PRR Project

Empreitada de reparação / modernização de elevadores – Eixo acessibilidades /Mobilidade- R. Prof Maria Leonor Bue

Project sheet

Name

Empreitada de reparação / modernização de elevadores – Eixo acessibilidades /Mobilidade- R. Prof Maria Leonor Bue

Total project amount

10,5 thousand €

Amount paid

0 €

Non-refundable funding

10,5 thousand €

Loan funding

0 €

Start date

24.03.2024

Expected end date

24.08.2025

Dimension

Resilience

Component

Social Intervention

Investment

360° Accessibility

Operation code

09/C03-i02/2024.P13791

Summary

Trata-se entre outras das seguintes atividades: • Substituição do quadro de comando existente, por novo comando eletrónico, • Nova instalação elétrica geral• Nova unidade de cabina• Novas botoneiras de revisão sobre a cobertura da cabina e poço, • Novo cabo de manobras para ligação comando/cabina• Montagem de interruptor de emergência no poço do elevador• Montagem de nova botoneira de cabina • Novo conjunto de botoneiras de patamar, • Montagem de circuito de iluminação de caixa regulamentar - NP-81-1• Reparação da máquina de tração, • Fornecimento e montagem de novo conjunto completo de cabos de suspensão, tirantes com molas, amarrações, e marcação dos pisos• Montagem de nova iluminação regulamentar na casa da máquina de modo a garantir 200 lux ao nível do pavimento• Montagem de armadura para iluminação de emergência na casa da máquina• Montagem de novo quadro geral elétrico na casa da máquina, • Fornecimento e montagem de novo limitador de velocidade completo, roda tensora, cabo de aço, amarrações e proteção• Revisão e afinação de todas as portas de patamarEstas obras visam melhorar a acessibilidade para chegar á sua fração do destinatário final Elvira Maria Madeira Pedro Gomes, que mora na R. Prof Maria Leonor Buescu 119 - 3º A (Intervenções mais detalhadas na memória descritiva)

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

85,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

10,5 thousand €

Total amount of the project

Where was the money spent

By county

1 county financed .

  • Lisboa 10,5 thousand € ,
Source EMRP
10.02.2026
All themes
Transparency without leading