PRR Project
Inclusão no Património: Acessibilidades no Panteão
Project sheet
Name
Inclusão no Património: Acessibilidades no PanteãoTotal project amount
13 thousand €Amount paid
6,5 thousand €Non-refundable funding
13 thousand €Loan funding
0 €Start date
01.01.2025Expected end date
31.12.2025Dimension
ResilienceComponent
Social InterventionInvestment
360° AccessibilityOperation code
08/C03-i02/2024.P13659Summary
É intenção da proposta a colocação de um corrimão na rampa exterior e a criação de duas rampas permanentes nas portas de entrada e saída. O edifício é acessível a pessoas de mobilidade condicionada apenas no piso térreo, dado o único ascensor existente funcionar do primeiro ao terceiro piso. O piso térreo concentra as maiores atrações do monumento, a Rotunda e as Salas Tumulares. Nos pisos superiores situam-se o Coro-Alto, a Sala de Exposições Temporárias e o Terraço. Toda a visita ao Panteão é feita através de escadas. São elas que dão acesso a todos os Pisos, Terraço e Zimbório. De todos os lances só dois, muito ingremes e perigosos, localizado no Piso3 têm corrimão. Alguns degraus encontram-se em mau estado com o focinho degradado e partido. Degraus com alturas diferentes também têm causado problemas de desequilíbrios.Com esta intervenção, o monumento passará a ser mais inclusivo e responder melhor a todos os visitantes. A intervenção consiste em colocar corrimão contínuo a auxiliar a subida no Torreão Poente e outro corrimão contínuo no Torreão Norte a auxiliar a descida. O investimento do projeto totaliza um investimento total de 29 971,00 euros que é revertido em rampas e Corrimãos: total de 91,2 m nos Torreões Norte e Poente + 1,93 m na rampa de acesso exterior + 5,84 m nas escadas de acesso à I.S. do piso 1. Fitas de cor contrastante para sinalizar os focinhos dos degraus: Rampas com 6% de inclinação: 2 rampas de 1,25x2,5 m, área de 3,125 m2 cada. Que totalizam 5000 m2 de área totalmente acessível.
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
13 thousand €
Total amount of the project
Percentage of the amount already paid for implementing projects
, 50 %,Where was the money spent
By county
1 county financed .
-
Lisboa 13 thousand € ,