Project sheet

Name

Escola Básica António Gedeão

Total project amount

13 thousand €

Amount paid

6,5 thousand €

Non-refundable funding

13 thousand €

Loan funding

0 €

Start date

01.08.2024

Expected end date

01.09.2024

Dimension

Resilience

Component

Social Intervention

Investment

360° Accessibility

Operation code

08/C03-i02/2024.P13332

Summary

A intervenção consiste na instalação de uma plataforma elevatória do piso 0 para o piso 1 e uma outra plataforma elevatória entre os três patamares existentes no piso 1 do corpo central deste edifício escolar. Ambas as plataformas elevatórias são de levantamento automático, com estrado de 1000x800mm livres e braços retrácteis, em conformidade com o Decreto-lei n.º 163 de 08/08/2006. As referidas plataformas serão fixadas nas paredes de alvenaria em torno dos lances de escadas e no pavimento/degraus existentes, com rail duplo. Foram previstas as ligações elétricas ao sistema proposto e os trabalhos de construção civil adaptados à situação existente, embora pouco expressivos.Adicionalmente foi prevista a construção de novas rampas exteriores, para eliminar as não conformidades do cumprimento da seção 4.8 (ressaltos no piso) das NTA’s, que se pretenderam colmatar com a presente intervenção e constituir o percurso acessível desta a entrada do estabelecimento escolar até ao corpo central, onde decorre toda a atividade letiva escola.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

70,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

13 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 50 %,

Where was the money spent

By county

1 county financed .

  • Odivelas 13 thousand € ,
Source EMRP
10.02.2026