PRR Project
Melhoria da Acessibilidade – Centro de Saúde de Penalva do Castelo
Project sheet
Name
Melhoria da Acessibilidade – Centro de Saúde de Penalva do CasteloTotal project amount
13 thousand €Amount paid
6,5 thousand €Non-refundable funding
13 thousand €Loan funding
0 €Start date
01.01.2025Expected end date
31.03.2025Dimension
ResilienceComponent
Social InterventionInvestment
360° AccessibilityOperation code
08/C03-i02/2024.P13313Summary
Para melhorar a acessibilidade no edifício, é necessário criar um estacionamento para pessoas com mobilidade condicionada (p.m.c.) próximo à entrada principal, com espaço lateral de 1,0m e pavimento antiderrapante em cor contrastante, além de sinalização vertical e rampa de acesso. Propõe-se substituir o pavimento irregular externo por um de betão poroso, garantindo nivelamento com a soleira da entrada.A porta de entrada, embora com dimensões adequadas, não abre a 90º. Sugere-se trocar a mola para permitir essa abertura e ajustar as faixas de segurança no vidro entre 1,20m e 1,50m de altura. O balcão de atendimento precisa ser adaptado para altura entre 0,75m e 0,85m, removendo divisórias para garantir extensão mínima de 0,80m. Além disso, deve ser sinalizado como prioritário para p.m.c.Quanto às instalações sanitárias (i.s.), propõe-se corrigir as dimensões e a posição das sanitas para permitir o acesso por ambos os lados e instalar sistema de alarme. Serão ajustadas as alturas dos lavatórios e espelhos para melhor acessibilidade, além de substituição dos dispensadores de papel e sabonete para modelos mais acessíveis.Com essas adaptações, o edifício atenderá às normas de acessibilidade, proporcionando autonomia e segurança aos usuários.
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
13 thousand €
Total amount of the project
Percentage of the amount already paid for implementing projects
, 50 %,Where was the money spent
By county
1 county financed .
-
Penalva do Castelo 13 thousand € ,