Information portal on various topics of management of public resources of the Portuguese State

PRR Project

“Empreitada de reparação / modernização de elevadores – Eixo acessibilidades /Mobilidade- Rua Frei Manuel Cenác

Project sheet

Name

“Empreitada de reparação / modernização de elevadores – Eixo acessibilidades /Mobilidade- Rua Frei Manuel Cenác

Total project amount

15,5 thousand €

Amount paid

4,65 thousand €

Non-refundable funding

15,5 thousand €

Loan funding

0 €

Start date

05.01.2024

Expected end date

30.06.2024

Dimension

Resilience

Component

Social Intervention

Investment

360° Accessibility

Operation code

07/C03-i02/2024.P11538

Summary

A proposta consiste para a Torre II consiste em modernizar os 2 ascensores ao abrigo da Empreitada 99/GEBALIS/2023 - Empreitada de reparação/modernização de elevadores - Eixo acessibilidade / mobilidade. Destacamos as seguintes atividades, visíveis, na modernização: Fornecimento e montagem de nova cabina completa com revestimento interior em inox escovado, espelho e colocação de corrimão em frente à botoneira; Fornecimento e montagem de porta automática de cabina de três folhas de correr: Fornecimento e montagem de portas de patamar automáticas de três folhas de correr; Novas botoneiras de piso/sinalizações de marcha e dentro da cabina com botões anti-vandálicos e com identificação em braille; O pavimento proposto é em alumínio tipo folha de oliveira, mais resistente ao desgaste: Iluminação eficiente Led na cabina; Atualmente os elevadores não possuem portas de cabina e tendo em consideração a legislação atual de ascensores, é obrigatória a colocação de portas automáticas. Esta obrigação já está contemplada nas atividades propostas na Empreitada. As portas de patamar que atualmente são de batente, também serão automáticas de três folhas em inox, considerando uma melhoria em termos de segurança para os utilizadores.Informação mais detalhada das atividades no caderno de encargos.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

85,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

15,5 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 30 %,

Where was the money spent

By county

1 county financed .

  • Lisboa 15,5 thousand € ,
Source EMRP
23.12.2024