Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

RGPD

Total project amount

6,9 thousand €

Amount paid

2,07 thousand €

Non-refundable funding

6,9 thousand €

Loan funding

0 €

Start date

01.09.2024

Expected end date

31.12.2024

Dimension

Resilience

Component

Social Intervention

Investment

360° Accessibility

Operation code

07/C03-i02/2024.P11510

Summary

Através da presente candidatura, pretende-se apoiar o Destinatário Final acima identificado na adaptação da atual casa de banho da sua habitação existente com barreiras arquitetónicas/de construção inadequadas à sua condição de mobilidade reduzida. Assim, prevê-se dotar as instalações sanitárias daquela habitação com padrões de acessibilidade conforme às exigências dos cidadãos com mobilidade reduzida.Verificam-se bastantes dificuldades na utilização da banheira pelo que se pretende a sua substituição por um duche acessível. A sanita e o lavatório são outros equipamentos sem zona de manobra adequada. A porta também não tem as medidas mínimas necessárias para a fácil deslocação do destinatário final.A requalificação da casa de banho da habitação passará pela eliminação de barreiras construtivas e pela implementação de estruturas de apoio na zona do duche, para auxiliar a mobilidade e equilíbrio na sua utilização.As melhorias das acessibilidades irão passar pela instalação de uma base de duche para permitir o fácil acesso da cadeira de rodas e igualmente se irão instalar barras de apoio para auxílio e segurança do destinatário final.A sanita e lavatório serão reposicionados para garantir uma melhor zona de manobra e fácil acesso lateral à base de duche e à sanita com uma largura de cerca de 0,80m. Estas medidas irão facilitar a deslocação por cadeiras de roda e outros equipamentos de apoio à mobilidade reduzida. Igualmente se irá substituir a porta para ter abertura para o exterior.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

60,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

6,9 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 30 %,

Where was the money spent

By county

1 county financed .

  • Moimenta da Beira 6,9 thousand € ,
Source EMRP
10.02.2026
All themes
Transparency without leading