Project sheet

Name

RGPD

Total project amount

11 thousand €

Amount paid

3,3 thousand €

Non-refundable funding

11 thousand €

Loan funding

0 €

Start date

01.09.2024

Expected end date

31.12.2024

Dimension

Resilience

Component

Social Intervention

Investment

360° Accessibility

Operation code

07/C03-i02/2024.P11502

Summary

Através da presente candidatura, pretende-se apoiar os Destinatários Finais acima identificados na adaptação da atual casa de banho da sua habitação existente com barreiras arquitetónicas/de construção inadequadas à sua condição de mobilidade reduzida. Assim, prevê-se dotar as instalações sanitárias daquela habitação com padrões de acessibilidade conforme às exigências dos cidadãos com mobilidade reduzida.Verificam-se bastantes dificuldades na utilização da banheira pelo que se pretende a sua substituição por um duche acessível. A banheira não permite o acesso de uma cadeira de rodas e não existe qualquer barra de apoio que auxilie o destinatário final neste compartimento. Outros equipamentos como a sanita e o lavatório não possuem zona de manobras adequadas para a utilização da cadeira de rodas ou de outros equipamentos de apoio à mobilidade reduzida. Do mesmo modo, a porta também não tem as medidas mínimas necessárias.A requalificação da casa de banho da habitação passará pela eliminação de barreiras construtivas e pela implementação de estruturas de apoio na zona do duche, para auxiliar a mobilidade e equilíbrio na sua utilização. A melhoria da acessibilidade da casa de banho passará pelo reposicionamento da sanita e lavatório para garantir uma melhor zona de manobra na deslocação da cadeira de rodas e de acesso lateral à base de duche e à sanita com largura de 0,80m. A porta será substituída para cumprir com as medidas mínimas requeridas para a passagem da cadeira de rodas sem quaisquer constrangimentos. Será igualmente instalada uma base de duche acessível para permitir acesso a uma cadeira de rodas e instalar barras de apoio.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

85,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

11 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 30 %,

Where was the money spent

By county

1 county financed .

  • Moimenta da Beira 11 thousand € ,
Source EMRP