Project sheet

Name

na

Total project amount

318,7 thousand €

Amount paid

130,78 thousand €

Non-refundable funding

318,7 thousand €

Loan funding

0 €

Start date

03.06.2024

Expected end date

31.03.2026

Dimension

Resilience

Component

Social Intervention

Investment

New Generation of Equipment and Social Intervention

Operation code

07/C03-i01/2023.PPRR-RE-C03-i01-07-000268

Summary

A medida Radar Social afigura-se uma oportunidade de excelência para a potenciação do trabalho da Rede Social do concelho de Viana do Castelo. Cada vez mais se verifica uma complexificação crescente das problemáticas no âmbito da exclusão social, que exigem uma atualização constante dos diagnósticos, redefinição de estratégias conjuntas e de instrumentos de intervenção social.A realidade social deste território em virtude da pandemia COVID 19, da guerra na Ucrânia e de outros fatores socioeconómicos associados à globalização, por exemplo, alterou-se substancialmente nos últimos anos. Os movimentos migratórios, os problemas no acesso à habitação e a perda de poder de compra de alguns grupos sociais, têm gerado novas vulnerabilidades, agravando fatores de exclusão social já existentes e implicando mudanças na intervenção.É necessário um olhar atento sobre esta nova realidade social, em mutação constante, que exige uma nova perspetiva sobre o próprio diagnóstico das problemáticas e respetivo planeamento da intervenção. Verifica-se, assim, imperativo implementar instrumentos de levantamento de dados, para caraterização dos quadros de exclusão social, e mecanismos de georreferenciação e de planeamento capazes de agregar as dinâmicas constantes que se verificam no terreno.A implementação de um sistema integrado de caraterização e georreferenciação social responderá às necessidades supracitadas de capacitação deste território, tendo em vista a otimização dos recursos locais, criando instrumentos e dinâmicas entre os diversos atores sociais, que possibilitem intervenções mais integradas, participativas e sustentadas na promoção da inclusão social.Implementar o Radar Social que, em tempo oportuno, identifique necessidades e ative mecanismos específicos de ativação das redes locais, que conduzam à resposta social ajustada aos indivíduos e famílias constituirá, por si só, um fator inestimável do desenvolvimento social local. É, assim, objetivo, a atualização e divulgação dos instrumentos estratégicos e de planeamento, assim como implementar um sistema de georreferenciação social no concelho, cujos destinatários são as pessoas, famílias ou grupos em situação de vulnerabilidade social.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

100,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

318,7 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 41 %,

Where was the money spent

By county

1 county financed .

  • Viana do Castelo 318,7 thousand € ,
Source EMRP
23.12.2024