Project sheet

Name

na

Total project amount

134,49 thousand €

Amount paid

57,65 thousand €

Non-refundable funding

134,49 thousand €

Loan funding

0 €

Start date

01.01.2022

Expected end date

30.06.2026

Dimension

Resilience

Component

Social Intervention

Investment

New Generation of Equipment and Social Intervention

Operation code

07/C03-i01/2023.PPRR-RE-C03-i01-07-000231

Summary

A medida RADAR SOCIAL, enquadrada na Componente 03 – Respostas Sociais, Instrumento RE-C03-i01 – Nova Geração de Equipamentos e Respostas Sociais, do PRR – Plano de Recuperação e Resiliência, surge da necessidade de se criarem condições para que as várias entidades que trabalham na área social consigam assegurar um trabalho em rede, quer na dimensão municipal quer intermunicipal. Os municípios, dada a sua proximidade territorial com os potenciais destinatários, são as entidades privilegiadas para se constituírem como promotores do Radar Social, redirecionando a intervenção local para o desenvolvimento de territórios inclusivos. Os destinatários desta medida são as pessoas, famílias ou grupos em situação de vulnerabilidade social, incluindo as pessoas em situação de risco de pobreza, exclusão social ou discriminação nas suas múltiplas dimensões. A medida em causa tem como principal objetivo a criação de uma equipa técnica que irá assegurar, por um lado, a atualização do Diagnóstico Social e do Plano de Desenvolvimento Social e, por outro, assegurar a implementação de um sistema integrado de georreferenciação social e de capacitação dos territórios, tendo em vista a ativação das respostas sociais, a otimização dos recursos e o incremento do trabalho em rede. Os seus objetivos específicos são os seguintes: • Combater à pobreza e à exclusão social; • Fomentar o trabalho de parceria e de cooperação entre as várias entidades, em complementaridade com as redes locais; • Reforçar o trabalho de proximidade, como resposta mais rápida e eficaz à população em situação de vulnerabilidade social; • Capacitar as entidades locais para a tomada de decisão, apoiada em instrumentos estratégicos e de desenvolvimento social atualizados; • Priorizar as necessidades sociais das pessoas, das famílias, da comunidade e do território.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

70,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

134,49 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 42,9 %,

Where was the money spent

By county

1 county financed .

  • Portalegre 134,49 thousand € ,
Source AD&C, EMRP