Project sheet

Name

na

Total project amount

162,09 thousand €

Amount paid

61,41 thousand €

Non-refundable funding

162,09 thousand €

Loan funding

0 €

Start date

01.01.2022

Expected end date

30.06.2026

Dimension

Resilience

Component

Social Intervention

Investment

New Generation of Equipment and Social Intervention

Operation code

07/C03-i01/2023.PPRR-RE-C03-i01-07-000218

Summary

O projeto a que remete este documento representa um esforço significativo por parte do Município, para que se possa fazer face às questões relacionadas com a pobreza e exclusão social existentes no seu território. Tendo por base os princípios constantes no diagnóstico social, as parcerias e a sustentabilidade, este projeto pretende contribuir para uma atualização e enriquecimento do conhecimento territorial, através da identificação e georreferenciação das áreas de maior relevo e vulnerabilidade social. A implementação deste plano de ação, com medidas e intervenções concretas, torna-se imperioso e necessário. Considerando o descrito no presente documento, é de extrema importância salientar que a sustentabilidade deste é fundamental para que a aprendizagem seja continua, e que a partilha de boas práticas permitam uma melhoria constate dos serviços. Este projeto é muito mais que uma simples iniciativa local, é um assentar num compromisso entre a qualidade de vida da população e o desenvolvimento sustentável do território. A equipa “Radar Social” será um meio facilitador e inquestionável na identificação, resolução e replicação das situações sociais existentes, contribuindo, desta forma, para que se possa incrementar um futuro mais próspero e inclusivo para o Município. O Município de Murça considera esta candidatura como sendo uma valiosa oportunidade social e, espera que a sua implementação possa contribuir, de uma forma significativa, para aquilo que considera ser o bem-estar geral dos seus munícipes.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

90,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

162,09 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 37,9 %,

Where was the money spent

By county

1 county financed .

  • Murça 162,09 thousand € ,
Source AD&C, EMRP