PRR Project
na
Project sheet
Name
naTotal project amount
168,81 thousand €Amount paid
71,57 thousand €Non-refundable funding
168,81 thousand €Loan funding
0 €Start date
01.01.2024Expected end date
31.03.2026Dimension
ResilienceComponent
Social InterventionInvestment
New Generation of Equipment and Social InterventionOperation code
07/C03-i01/2023.PPRR-RE-C03-i01-07-000214Summary
Como objetivo geral de toda a intervenção do Diagnóstico Social podemos referir a promoção da melhoria da qualidade de vida da população.Decorrendo do acima exposto será importante prevenir os fenómenos de retenção, absentismo e abandono escolar (em especial nos níveis mais avançados de escolaridade), não descurando garantir a capacidade de acompanhamento e orientação para as situações de risco.Para além disso, existe necessidade de continuar a apostar na formação profissional e aquisição de competências, sendo esta a via para reintegração de indivíduos com percurso escolar incompleto.Igualmente crucial em toda a intervenção será o aumento da capacidade de resposta das instituições (ao nível da primeira infância e da terceira idade) e promover o exercício da cidadania ativa (para o que contribuirão os pontos referidos anteriormente).Podemos dizer que o último deverá ser o primeiro: numa lógica de melhoria de eficiência das intervenções será importante a aposta no Planeamento Articulado em Parceria, reforçando a articulação institucional no âmbito do trabalho desenvolvido.
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
168,81 thousand €
Total amount of the project
Percentage of the amount already paid for implementing projects
, 42,4 %,Where was the money spent
By county
1 county financed .
-
Redondo 168,81 thousand € ,