Jump to main page content
Loading...

Project sheet

Name

na

Total project amount

169,3 thousand €

Amount paid

69,19 thousand €

Non-refundable funding

169,3 thousand €

Loan funding

0 €

Start date

01.01.2022

Expected end date

30.06.2026

Dimension

Resilience

Component

Social Intervention

Investment

New Generation of Equipment and Social Intervention

Operation code

07/C03-i01/2023.PPRR-RE-C03-i01-07-000202

Summary

Aferir e identificar as necessidades e vulnerabilidades sociais do concelho é uma ação que procurará colmatar as mesmas através de uma rede de necessidade/resposta a implementar que fomentará uma comunidade inclusiva, assente no apoio dos mais vulneráveis mitigando desigualdades e promovendo oportunidades, independentemente do status social. Este processo, cujo objetivo principal é a intervenção para a promoção do desenvolvimento social local, deverá ser sujeito a processos de monitorização e avaliação, que permitam melhorar continuamente as intervenções e aferir o impacto destas na população. Este trabalho será desenvolvido com cada um dos grupos identificados, em que foi feita uma análise aprofundada de cada um dos problemas identificados, e será a base da realização do Plano de Ação (Fase 1 - Projeto) assim como para a atualização do Diagnóstico Social e Plano de Desenvolvimento Social, num espaço de 3 meses, onde serão determinadas as estratégias e os meios capazes de fazer face aos problemas e necessidades do concelho, em prol de um desenvolvimento social mais equilibrado e inclusivo no concelho de Montemor-o-Novo. Posteriormente, numa segunda fase, pretendemos, num espaço de 24 meses, executar as seguintes atividades: 1) Referenciar, em contexto vida a pessoa ou a família, a sua situação de vulnerabilidade social; 2) Realizar uma avaliação social preliminar e prospetiva da situação sociofamiliar, registando o seu resultado num sistema integrado de georreferenciação; 3) Informar e orientar a pessoa, assegurando o seu encaminhamento para a rede dos serviços de atendimento e acompanhamento social ou dos parceiros da Rede Social, mediante a ativação do sistema integrado de referenciação; e 4) Garantir uma ativação direta e célere de recursos locais da Rede Social Local, sempre que da referenciação resultar a necessidade de uma intervenção social emergencial.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

85,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

169,3 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 40,9 %,

Where was the money spent

By county

1 county financed .

  • Montemor-o-Novo 169,3 thousand € ,
Source AD&C, EMRP
19.09.2024