Project sheet

Name

na

Total project amount

222,43 thousand €

Amount paid

91,62 thousand €

Non-refundable funding

222,43 thousand €

Loan funding

0 €

Start date

01.01.2022

Expected end date

30.06.2026

Dimension

Resilience

Component

Social Intervention

Investment

New Generation of Equipment and Social Intervention

Operation code

07/C03-i01/2023.PPRR-RE-C03-i01-07-000185

Summary

Tendo em consideração as áreas de intervenção identificadas ao nível do Serviço de Atendimento e Acompanhamento Social e em sede de CLAS, com a criação da equipa do Radar Social, o Município de Albergaria-a-Velha pretende intervir em maior profundidade junto dos grupos de pessoas em situação de desemprego e desemprego seguido de doença; baixa escolaridade / analfabetismo; deficiência; alcoolismo; baixos rendimentos; más condições habitacionais/ ausência de habitação; isolamento social e/ou geográfico; doença mental; ausência de competências sociais e, ainda, nas pessoas endividadas. Salientar, ainda, que a população imigrante está em crescimento no Concelho. Objetivo geral: implementação de um sistema integrado de georeferenciação social e de capacitação do território de Albergaria-a-Velha na ativação de respostas e otimização dos recursos, visando trazer maior eficácia à ação coordenada das entidades locais, apoiada na noção de desenvolvimento social e integrada numa perspetiva do desenvolvimento local. Neste sentido, a equipa visará promover a inclusão e proteção social dos grupos mais vulneráveis; enfrentar os desafios demográficos da natalidade do envelhecimento e da longevidade; garantir os direitos e promover a igualdade de oportunidades dos diferentes grupos populacionais; reforçar a coesão territorial e a coordenação estratégica da rede, melhorando o conhecimento e apostando capacitação.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

85,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

222,43 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 41,2 %,

Where was the money spent

By county

1 county financed .

  • Albergaria-a-Velha 222,43 thousand € ,
Source AD&C, EMRP