Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

na

Total project amount

162,97 thousand €

Amount paid

66,48 thousand €

Non-refundable funding

162,97 thousand €

Loan funding

0 €

Start date

01.01.2024

Expected end date

31.03.2026

Dimension

Resilience

Component

Social Intervention

Investment

New Generation of Equipment and Social Intervention

Operation code

07/C03-i01/2023.PPRR-RE-C03-i01-07-000154

Summary

O Regulamento (EU) 2021/241 do Parlamento Europeu e do Conselho, de 12 de Fevereiro, criou o Mecanismo de Recuperação e Resiliência (MRR). O Dec. -Lei nº 29 B /2021 de 4 de maio estabeleceu o modelo de governação dos fundos atribuídos a Portugal através do seu Plano de Recuperação e Resiliência. No âmbito da componente 03 Respostas Sociais, investimento RE-CO3-iO1-Nova Geração de Equipamentos e Respostas Socais do PRR, surge a Medida Radar Social.O impacto económico e social provocado pela pandemia COVID 19, contribuiu para o agravamento das condições de vida das pessoas e das famílias, do nosso território, especialmente as que se encontram em situação de vulnerabilidade, pobreza e exclusão social.A necessidade de assegurar uma maior capacidade de intervenção das entidades, reforça a necessidade de criarmos condições de proximidade para a resolução de problemas sociais. Através do Radar Social pretende-se implementar um sistema integrado de georreferenciação social e de capacitação do território na ativação das respostas e otimização dos recursos, da Rede Social; Aumentar a eficácia da ação das entidades locais, redirecionando a intervenção social local para o desenvolvimento de territórios inclusivos. Definir com coerência e articulação, as situações que requerem realização de diagnósticos sociais locais, bem como priorizar as diferentes etapas para benefício das pessoas e famílias, da comunidade, do nosso território.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

100,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

162,97 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 40,8 %,

Where was the money spent

By county

1 county financed .

  • Estremoz 162,97 thousand € ,
Source EMRP
23.12.2024