Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

na

Total project amount

169,3 thousand €

Amount paid

65,35 thousand €

Non-refundable funding

169,3 thousand €

Loan funding

0 €

Start date

17.06.2024

Expected end date

31.03.2026

Dimension

Resilience

Component

Social Intervention

Investment

New Generation of Equipment and Social Intervention

Operation code

07/C03-i01/2023.PPRR-RE-C03-i01-07-000115

Summary

Perante o cenário identificado na síntese do diagnóstico social, acrescido do papel conferido aos municípios da transferência de competências ao nível da ação social revela-se necessário a referenciação e reconhecimento dos problemas de pobreza e exclusão social, bem como, a capacitação dos territórios na ativação de respostas e otimização dos recursos, visando uma maior eficácia à ação das entidades locais.Esta equipa assumirá um papel fulcral na atualização/elaboração de documentos estratégicos e na implementação de mecanismos de atualização periódica dos instrumentos de planeamento capazes de minimizar as assimetrias sociais e alcançar o desenvolvimento local do concelho de Mondim de Basto.É esta equipa que:- Terá maior proximidade com as pessoas, famílias, comunidades e dos territórios;- Terá maior proximidade com as entidades que constituem a rede de parceiros locais/reginais;- Fará a avaliação social preliminar e orientação da pessoa/família assegurando o encaminhamento para a rede do SAAS ou dos parceiros sociais; - Desempenhará um pepel ativo na mobilização da Rede Social;- Terá a maior proximidade e articulação com as instituições que compõem a rede de parcerias locais (serviços da Câmara Municipal, Segurança Social, saúde, educação e ensino superior, justiça, segurança, rede de instituições do setor social e solidário, setor privado, entre outras)Pelo exposto a criação da equipa multidisciplinar do Radar Social de Mondim de Basto tem como objetivo geral efetuar o (re)conhecimento aprofundado dos problemas de cariz social, por via de um sistema integrado de georreferenciação, que sistematiza informação valiosa para a identificação das medidas prioritárias de intervenção, articuladas e eficazes, da Rede Social em prol do desenvolvimento social e consequente local do concelho.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

70,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

169,3 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 38,6 %,

Where was the money spent

By county

1 county financed .

  • Mondim de Basto 169,3 thousand € ,
Source EMRP
23.12.2024