Name

na

Total project amount

136,99 thousand €

Amount paid

51,66 thousand €

Non-refundable funding

136,99 thousand €

Loan funding

0 €

Start date

01.01.2024

Expected end date

31.03.2026

Dimension

Resilience

Component

Social Intervention

Investment

New Generation of Equipment and Social Intervention

Operation code

07/C03-i01/2023.PPRR-RE-C03-i01-07-000076

Summary

Objetivo Geral: Identificar as situações de maior vulnerabilidade social no concelho e mobilizar de forma concertada as respostas sociais mais adequadas. O concelho de reguengos de Monsaraz confronta-se com problemas ao nível socioeconómico e demográfico, que se agravaram devido à pandemia.O envelhecimento populacional, a baixa natalidade, os idosos, crianças e desempregados, em risco de agravamento da situação económica e social, as pessoas com deficiência ou incapacidade que apresentam dificuldades de inserção, o aumento da vulnerabilidade social e económica das vitimas de violência doméstica, vem reforçar a necessidade de se criarem mecanismos e respostas para a resolução dos problemas sociais.Torna-se necessário responder de forma rápida e eficaz às necessidades cada vez maiores da população em termos de apoio familiar, económico e social.A par disto, as situações de pobreza continuam a existir, agravando-se em muitos casos devido à situação pandémica que se viveu recentemente. O combate à pobreza e exclusão social exige uma abordagem integrada de natureza multidimensional. Torna-se imperativo identificar/sinalizar os grupos vulneráveis existentes no concelho, e mobilizar as respostas de apoio social de acordo com as necessidades identificadas. O projeto permitirá um reforço da capacidade de intervenção social no concelho, otimizando a rede de equipamentos e respostas e implementando um modelo de intervenção comunitária inovador.A implementação do “Radar Social” no concelho de Reguengos de Monsaraz, permitirá na Fase 1, atualizar os instrumentos de planeamento concelhios, nomeadamente o Diagnóstico Social, o Plano de Desenvolvimento Social e o Plano de Ação e mapear os recursos regionais e locais existentes. Numa segunda fase, será implementado um sistema de georreferenciação social de âmbito municipal, identificando aqueles que no nosso concelho se encontrem pelos mais diversos fatores, em situação de pobreza e exclusão social. A par deste processo, serão também georreferenciados os recursos e respostas existentes para a resolução dos problemas sociais, contribuindo para um concelho mais inclusivo. A Fase 2 do Radar Social será também a que permitirá desenvolver o Plano de Ação construído na primeira fase.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

75,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

136,99 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 37,7 %,

Where was the money spent

By county

1 county financed .

  • Reguengos de Monsaraz 136,99 thousand € ,
Source EMRP