Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

na

Total project amount

154,32 thousand €

Amount paid

60,66 thousand €

Non-refundable funding

154,32 thousand €

Loan funding

0 €

Start date

02.01.2024

Expected end date

31.03.2026

Dimension

Resilience

Component

Social Intervention

Investment

New Generation of Equipment and Social Intervention

Operation code

07/C03-i01/2023.PPRR-RE-C03-i01-07-000064

Summary

A presente candidatura irá permitir um melhoramento da capacitação do território na ativação da resposta e otimização dos recursos, visando trazer maior eficácia à ação das entidades locais, apoiada na noção de desenvolvimento social e integrada numa perspetiva do desenvolvimento local. O objetivo geral desta candidatura prende-se com a necessidade de existirem no Município de Castelo de Vide instrumentos estratégicos, atualizados e enriquecidos que possam sustentar medidas de governabilidade, nomeadamente instrumentos de planeamento como o Plano de Desenvolvimento Social, onde se inscreve um projeto comum de mudança, em consonância com o Diagnóstico Social definindo-se objetivos e estratégias capazes de responder às necessidades e problemas detetados, para um horizonte temporal de médio prazo. Ora, os Planos de Ação, a realizar anualmente, visam a operacionalização do Plano de Desenvolvimento Social e são elaborados a partir da relação entre os objetivos, os meios e a estratégia de implementação da REDE SOCIAL deste Concelho, sendo fundamental que a Equipa do Radar Social atualize estes instrumentos, mapeando simultaneamente os recursos existentes, garantindo a eficácia das respostas existentes bem como a respetiva intervenção coordenada entre todos os intervenientes, executando com eficácia o plano de ação. Pretende-se principalmente conseguir uma georreferenciação social para o Município de Castelo de Vide, onde se identifiquem pessoas, famílias e grupos em situação de vulnerabilidade social e/ou risco de pobreza e exclusão social bem como os respetivos recursos, respostas e soluções.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

95,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

154,32 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 39,3 %,

Where was the money spent

By county

1 county financed .

  • Castelo de Vide 154,32 thousand € ,
Source EMRP
23.12.2024