PRR Project
na
Project sheet
Name
naTotal project amount
169,3 thousand €Amount paid
75,81 thousand €Non-refundable funding
169,3 thousand €Loan funding
0 €Start date
01.07.2024Expected end date
31.03.2026Dimension
ResilienceComponent
Social InterventionInvestment
New Generation of Equipment and Social InterventionOperation code
07/C03-i01/2023.PPRR-RE-C03-i01-07-000034Summary
O Diagnóstico Social do concelho de Ribeira de Pena assume um papel de extrema importância na intervenção sendo imprescindível que a sua elaboração seja cuidada e atenta, de modo a possibilitar o conhecimento dos fenómenos sociais. Por esse motivo e de modo a potenciar a intervenção, é fulcral, que o diagnóstico identifique as necessidades, aborde os problemas prioritários, as suas causas, qual o contexto que condiciona a situação-problema, os recursos, os meios disponíveis, tal como as potencialidades e as reais oportunidades de desenvolvimento, dando-nos assim uma visão ampla e mais completa possível da realidade.Neste sentido, a equipa do radar social, poderá dar um contributo decisivo para a construção , actualização e enriquecimento sobre o território, priorizando as diferentes etapas com vista ao benefício das pessoas e famílias. A equipa do radar social será ainda imprescindível para a reafirmação do papel da rede social e da actualização periódica dos instrumentos de planeamento.Em suma, e tendo por base o aviso de abertura de concurso n.º 07/C03-i01/2023 – RE-C03-i01.m03 – Radar Social – Criação de equipas para projeto piloto, pretende-se com este projeto criar uma equipa Radar Social por forma a desenvolver um sistema de georreferenciação social que abranja toda a comunidade concelhia, nomeadamente, pessoas, famílias ou grupos em situação de vulnerabilidade social, incluindo as pessoas em situação de risco de pobreza, exclusão social ou discriminação nas suas múltiplas dimensões.
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
169,3 thousand €
Total amount of the project
Percentage of the amount already paid for implementing projects
, 44,8 %,Where was the money spent
By county
1 county financed .
-
Ribeira de Pena 169,3 thousand € ,