Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Criação de Equipas para Projeto Piloto

Total project amount

168,9 thousand €

Amount paid

60,69 thousand €

Non-refundable funding

168,9 thousand €

Loan funding

0 €

Start date

02.05.2024

Expected end date

31.03.2026

Dimension

Resilience

Component

Social Intervention

Investment

New Generation of Equipment and Social Intervention

Operation code

07/C03-i01/2023.PPRR-RE-C03-i01-07-000010

Summary

O Diagnóstico Social é um instrumento que permite um trabalho em parceria, que se pretende dinâmico, participado e reconhecido por todos os parceiros do CLASV – Conselho Local de Ação Social de Vidigueira. Envolve e pressupõe a caracterização sócio económica do território bem como a identificação das necessidades, a deteção dos problemas prioritários e as respetivas causas e elenca os recursos e as potencialidades locais que constituem oportunidades de desenvolvimento futuro. O presente documento tem ainda como objetivo, reforçar o papel da rede local, designadamente, através da construção de outros instrumentos de planeamento que permitam fundamentar decisões locais, Este instrumento de trabalho serviu de base para a elaboração do Plano de Desenvolvimento Social (2019–2020). Neste sentido, e com vista a dar continuidade à implementação do trabalho já em curso, torna-se necessário a criação da futura equipa multidisciplinar a integrar o projeto piloto do Radar Social, a qual irá proceder à introdução e georreferenciação social dos dados recolhidos, visando trazer maior eficácia à ação das entidades locais, apoiada na noção de desenvolvimento social numa perspetiva do desenvolvimento local. A equipa será constituída por dois técnicos superiores (área de formação em Sociologia e Gestão), integrados no mapa de pessoal do Município de Vidigueira, e cujas funções serão em regime de exclusividade total no âmbito do projeto, com estreita articulação na Rede Social e nas estruturas operacionais, enquanto recursos humanos permanentes para mobilização da Rede, em grande proximidade e articulação com as instituições que compõe a rede de parcerias locais, regionais e nacionais. Em termos de funcionalidade, o projeto irá contemplar duas fase distintas, em conformidade com o ponto 4.9 do aviso de concurso, contanto com um horizonte temporal de 27 meses.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

70,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

168,9 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 35,9 %,

Where was the money spent

By county

1 county financed .

  • Vidigueira 168,9 thousand € ,
Source EMRP
10.02.2026
All themes
Transparency without leading