Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Requalificação das Instalações Sanitárias da Escola Básica Sá de Miranda

Total project amount

13 thousand €

Amount paid

0 €

Non-refundable funding

13 thousand €

Loan funding

0 €

Start date

06.09.2021

Expected end date

24.01.2022

Dimension

Resilience

Component

Social Intervention

Investment

360° Accessibility

Operation code

06/C03-i02/2024.P11695

Summary

1) Obras de reconfiguração do acesso à instalação sanitária e à sala da UEE: esta intervenção incluiu a reformulação do espaço de forma a facilitar o acesso à IS, nomeadamente através da demolição de uma IS não acessível existente no interior da UEE, bem como a desativação e remoção das loiças e canalizações associadas com o objetivo de conferir amplidão e alcance no percurso para a IS acessível, que passou a estar associada à UEE. Ainda com este objetivo foram removidas as portas existentes, executada a demolição cuidada de paredes e colocação de novas portas com largura livre adequada à circulação de pessoas com mobilidade condicionada;2) Criação de percurso acessível - rampa de acesso ao Espaço de Jogo e Recreio: devido à inexistência de um percurso acessível ao EJR do JI, foi executada uma rampa com inclinação de 8%, por forma a tornar o EJR acessível a pessoas com mobilidade condicionada, nomeadamente às crianças com cadeira de rodas;3) Reformulação do pavimento e seus revestimentos do Espaço de Jogo e Recreio: Execução de pavimentos inclusivos no EJR com três tipologias de pavimento, e lancil de remate, possibilitando a utilização do EJR por pessoas com mobilidade condicionada, nomeadamente às crianças com cadeira de rodas, com a colocação de um bebedouro inclusivo.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

50,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

13 thousand €

Total amount of the project

Where was the money spent

By county

1 county financed .

  • Oeiras 13 thousand € ,
Source EMRP
23.12.2024