Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Melhoria das condições de acessibilidade do Centro Interpretativo do Território - Sambade

Total project amount

10,59 thousand €

Amount paid

0 €

Non-refundable funding

10,59 thousand €

Loan funding

0 €

Start date

04.11.2024

Expected end date

03.11.2025

Dimension

Resilience

Component

Social Intervention

Investment

360° Accessibility

Operation code

06/C03-i02/2024.P11569

Summary

Os trabalhos propostos para melhorar as condições de acessibilidade no exterior são os seguintes:o Repavimentação do passeio existente no largo da igreja, com nova lancilagem e pavimento considerando o abate das árvores existentes para garantir a largura mínima de 1.50 m na totalidade do passeio;o Ampliação do passeio existente desde o largo da igreja com o seu prolongamento para a Rua de Santo António com largura mínima de 1.50 m até ao limite do campo polidesportivo;o Abate das arvores;o Manutenção do equipamento existente nomeadamente postes de infraestruturas;o Transferência dos equipamentos da recolha urbana de resíduos.Esta solução permite manter o traçado do passeio existente, sem interferir com as faixas de rodagem do Largo da Igreja. Porém dado o obstáculo das arvores é necessário removê-las, considerando o seu abate. A solução apresentada permite uma boa mobilidade urbana dos visitantes e dos habitantes de Sambade.Nas escadas existentes é considerada a solução de um corrimão que permite aos cidadãos um elemento de apoio para facilitar a sua utilização na acessibilidade ao edifício diretamente desde os portões situados no Largo da Igreja.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

70,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

10,59 thousand €

Total amount of the project

Where was the money spent

By county

1 county financed .

  • Alfândega da Fé 10,59 thousand € ,
Source EMRP
23.12.2024